Changelog
Every change to a tool that alters a result for the same inputs, with the reason and a sample.
| Date | Tool | Version | Reason |
|---|---|---|---|
| 2026-10-31 | electrify.backup-power.size | 0.1.0 | First release. |
| 2026-10-31 | electrify.service-headroom.check | 0.1.0 | First release. |
| 2026-10-31 | ratepayer.revenue-requirement.explain | 0.1.0 | First release. |
| 2026-10-31 | calc.line-rating.ampacity | 0.1.0 | First release. |
| 2026-10-31 | calc.cost.lcoe | 0.2.0 | Cross-checked against NLR ATB 2025's published LCOE for nine technologies. No answer changed; results now report validation level 2. Sample: $41.10/MWh (level 1) before, $41.10/MWh (level 2) after. |
| 2026-10-31 | calc.cost.lcoe | 0.1.0 | First release. |
| 2026-10-31 | calc.storage.basics | 0.1.0 | First release. |
| 2026-10-31 | calc.transformer.size | 0.1.0 | First release. |
| 2026-10-31 | calc.power-factor.correct | 0.1.0 | First release. |
| 2026-10-31 | calc.energy-units.emissions | 0.1.0 | First release. |
| 2026-10-31 | household.usage-benchmark.compare | 0.1.0 | First release. |
| 2026-10-31 | household.bill-totals.check | 0.1.0 | First release. |
| 2026-10-31 | calc.energy-units.convert | 0.2.0 | Cross-checked against NIST SP 811 Appendix B.8 and marked stable. No answer changed; results now report validation level 2. The assumptions now say which therm is used. Sample: 105,500,000 J (level 1) before, 105,500,000 J (level 2) after. |
| 2026-10-30 | calc.energy-units.convert | 0.1.0 | First release. |