Methods: Levelized cost of energy

calc.cost.lcoe · Version 0.2.0

Method

LCOE = (fixed charge rate × capital cost + fixed O&M) ÷ (capacity factor × 8.76 MWh per kW-year) + variable O&M + fuel cost, as NLR's Annual Technology Baseline defines it.

Assumptions

Sources

Worked examples

ExampleIndependent sourceToleranceLast result
FCR 0.07, $1,000/kW, $20/kW-year, 25% capacity factorcalc/storage-and-cost spec, scenario "LCOE numbers": 90 ÷ 2.19±0.005, ±0.005, ±0.005Passed on Oct 31, 2026

Known differences from reference engines

None recorded.