gridprims

Annual Electric Generator Report (Form EIA-860)

U.S. Energy Information Administration

Every US power plant of 1 MW or more and its generators, operable, proposed, and retired, with capacity, technology, fuel, and dates, as of the end of 2025.

Not included: No coordinates, street addresses, grid voltages, or pipeline names; no generation (that is EIA-923).

U.S. Energy Information Administration · Annual Electric Generator Report (Form EIA-860) · data for 2025 · as of Sep 10, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Generated Oct 31, 2026

Next release expected around Sep 10, 2027, judged from the usual schedule.

How we share it

We republish this data and our tables made from it.

The publisher’s terms, as captured on Oct 31, 2026:

U.S. government publications are in the public domain and are not subject to copyright protection. You may use and/or distribute any of our data, files, databases, reports, graphs, charts, and other information products that are on our website or that you receive through our email distribution service. However, if you use or reproduce any of our information products, you should use an acknowledgment, which includes the publication date, such as: "Source: U.S. Energy Information Administration (Oct 2008)."

Read the terms page

Credit

Source: U.S. Energy Information Administration, Form EIA-860 (Sep 2026).

Critical infrastructure screen

Screened automatically on Oct 31, 2026 under 18 CFR 388.113: grid infrastructure, with every checklist item confirmed from public sources only, and none of its 40 columns holds a precise location or network detail.

Publishers and rights holders: if you want this data removed or reduced to a link, report it with the button below and we will do it first and discuss after.

Download

Stable file addresses

Permanent: /data/eia-860/2026-10/<file> · Latest: /data/eia-860/latest/<file>

Every version stays at its permanent address. The latest address redirects to the current version, and both can be read from any website or notebook. How the data addresses work

How to cite this version

U.S. Energy Information Administration. Annual Electric Generator Report (Form EIA-860), data for 2025, released Sep 10, 2026. Redistributed by gridprims.com, version 2026-10, manifest SHA-256 4ca475f5bbdea2e786b2c4f2482df9b35eedd445e7431f94ed84d0730095885c. https://gridprims.com/data/eia-860/2026-10/

Publisher’s original file

Versions

Versions
VersionData periodRetrievedManifest and SHA-256
2026-10 (current)2025Oct 31, 2026manifest.json 4ca475f5bbdea2e786b2c4f2482df9b35eedd445e7431f94ed84d0730095885c

Columns: Power plants with operator, county, and balancing authority

ColumnTypeUnit
plant_idf64
plant_namestr
utility_idf64
utility_namestr
statestr
countystr
nerc_regionstr
ba_codestr
ba_namestr
primary_purpose_naicsf64
regulatory_statusstr
sectorf64
sector_namestr

Columns: Generators: operable, proposed, and retired or canceled, with capacity, fuel, and dates

ColumnTypeUnit
plant_idf64
generator_idstr
categorystr
utility_idf64
utility_namestr
plant_namestr
statestr
countystr
technologystr
prime_moverstr
ownershipstr
statusstr
nameplate_mwf64MW
summer_mwf64MW
winter_mwf64MW
energy_source_1str
energy_source_2str
sectorf64
sector_namestr
operating_monthf64
operating_yearf64
planned_retirement_monthf64
planned_retirement_yearf64
planned_operation_monthf64
planned_operation_yearf64
retirement_monthf64
retirement_yearf64

Report a problem

Tell us what looks wrong. The report holds only what you see in the preview below. Nothing is sent until you press Send.

Exactly what will be sent