Interconnection queue in Utah
Data: Lawrence Berkeley National Laboratory and GridTracker, Queued Up, as of Dec 31, 2025.
This is an annual snapshot. A request's status may have changed since. Current status at Interconnection.fyi.
LBNL licenses the file CC BY 4.0, so project rows are shown and the file can be downloaded from our data library.
Statewide
- Active capacity
- 27,808 MW
- Active requests
- 141
- Median years in queue (active)
- 2.6
- Withdrawn, of requests entered by 2020
- 77%
| Type | Active capacity (MW) | Projects |
|---|---|---|
| Solar | 2,052 | 18 |
| Wind | 402 | 3 |
| Storage | 5,824 | 32 |
| Gas | 2,814 | 18 |
| Hybrid | 16,153 | 65 |
| Other | 564 | 5 |
By county
| County | Active capacity (MW) | Projects | Solar | Wind | Storage | Gas | Hybrid | Other | Median years in queue (active) | Withdrawn, of requests entered by 2020 |
|---|---|---|---|---|---|---|---|---|---|---|
| Millard | 6,468 | 26 | 300 | 220 | 185 | 5,723 | 40 | 2.6 | 74% of 34 | |
| Utah | 5,975 | 29 | 748 | 796 | 1,015 | 3,416 | 2.6 | 88% of 48 | ||
| Emery | 3,490 | 19 | 766 | 800 | 1,924 | 1.6 | 50% of 26 | |||
| Juab | 3,214 | 15 | 80 | 1,290 | 1,844 | 1.0 | 85% of 26 | |||
| Salt Lake | 2,315 | 11 | 2 | 2,283 | 24 | 6 | 1.3 | 59% of 49 | ||
| Iron | 1,795 | 11 | 99 | 490 | 1,206 | 3.8 | 76% of 71 | |||
| Kane | 1,075 | 3 | 95 | 980 | 9.3 | |||||
| Washington | 780 | 4 | 180 | 300 | 300 | 2.1 | 88% of 25 | |||
| Box Elder | 670 | 4 | 10 | 80 | 80 | 500 | 0.9 | 85% of 39 | ||
| Tooele | 630 | 6 | 235 | 75 | 320 | 3.3 | 68% of 31 | |||
| San Juan | 499 | 2 | 300 | 199 | 0.3 | 95% of 22 | ||||
| Beaver | 343 | 5 | 99 | 240 | 4 | 3.8 | 75% of 68 | |||
| Weber | 200 | 1 | 200 | 2.6 | ||||||
| Summit | 100 | 1 | 100 | 9.4 | ||||||
| Sevier | 100 | 2 | 80 | 20 | 1.7 | |||||
| Carbon | 80 | 1 | 80 | 9.3 | ||||||
| Miller | 75 | 1 | 75 | 0.0 | ||||||
| Cache | 0 | 0 | ||||||||
| Rich | 0 | 0 | ||||||||
| Tremonton | 0 | 0 | ||||||||
| Grand | 0 | 0 | ||||||||
| Davis | 0 | 0 | ||||||||
| Carbon/Utah | 0 | 0 | ||||||||
| Sanpete | 0 | 0 | ||||||||
| Wasatch | 0 | 0 | ||||||||
| Duchesne | 0 | 0 | ||||||||
| Garfield | 0 | 0 | ||||||||
| Uintah | 0 | 0 |
Capacity is each request's first-listed capacity, so a hybrid's battery is not added on top. Most requests in a queue never get built.
Active requests
Status is as of Dec 31, 2025. Current status at Interconnection.fyi.
| Project | County | Type | MW | Entered the queue | Study phase | Utility or operator | Live status |
|---|---|---|---|---|---|---|---|
| Q93 | Millard | Solar+Battery | 1,000 | 2022-08-02 | In Progress (unknown study) | Los Angeles Department of Water and Power | Current status |
| Q105 | Millard | Solar+Battery | 600 | 2023-06-08 | In Progress (unknown study) | Los Angeles Department of Water and Power | Current status |
| 838 | Utah | Solar+Battery | 525 | 2016-12-08 | IA Executed | PacifiCorp | Current status |
| NC5-010 | Kane | Solar+Battery | 500 | 2024-03-26 | Navajo-Crystal | Current status | |
| C2-10 | Salt Lake | Other Storage | 500 | 2022-04-05 | IA Executed | PacifiCorp | Current status |
| C3-036 | Millard | Solar+Battery | 500 | 2023-05-08 | Facility Study | PacifiCorp | Current status |
| PIS087 | Salt Lake | Other Storage | 500 | 2024-09-03 | In Progress (unknown study) | PacifiCorp | Current status |
| T2-013 | Box Elder | Nuclear | 500 | 2025-08-28 | PacifiCorp | Current status | |
| T2-084 | Salt Lake | Battery | 500 | 2025-09-12 | PacifiCorp | Current status | |
| NC5-001 | Kane | Solar+Battery | 480 | 2015-05-11 | Navajo-Crystal | Current status | |
| C1-11 | Emery | Solar+Battery | 450 | 2021-04-21 | IA Executed | PacifiCorp | Current status |
| 787 | Emery | Solar+Battery | 400 | 2016-08-08 | IA Executed | PacifiCorp | Current status |
| T2-076 | Utah | Solar+Battery | 400 | 2025-09-12 | PacifiCorp | Current status | |
| T2-083 | Emery | Battery | 400 | 2025-09-12 | PacifiCorp | Current status | |
| T2-085 | Utah | Solar+Battery | 400 | 2025-09-12 | PacifiCorp | Current status | |
| Q104 | Millard | Solar+Battery | 400 | 2023-06-08 | In Progress (unknown study) | Los Angeles Department of Water and Power | Current status |
| Q50 | Millard | Solar+Battery | 400 | 2016-01-05 | In Progress (unknown study) | Los Angeles Department of Water and Power | Current status |
| Q51 | Millard | Solar+Battery | 400 | 2016-01-05 | In Progress (unknown study) | Los Angeles Department of Water and Power | Current status |
| Q90 | Millard | Solar+Battery | 400 | 2022-04-01 | In Progress (unknown study) | Los Angeles Department of Water and Power | Current status |
| Q94 | Millard | Solar+Battery | 400 | 2022-12-15 | In Progress (unknown study) | Los Angeles Department of Water and Power | Current status |
| T2-020 | Juab | Gas | 363 | 2025-09-02 | PacifiCorp | Current status | |
| Q114 | Juab | Solar+Battery | 345 | 2025-08-09 | In Progress (unknown study) | Los Angeles Department of Water and Power | Current status |
| T2-052 | Emery | Solar+Battery | 340 | 2025-09-12 | PacifiCorp | Current status | |
| Q52 | Millard | Solar+Battery | 324 | 2016-01-14 | In Progress (unknown study) | Los Angeles Department of Water and Power | Current status |
| Q86 | Millard | Wind | 300 | 2021-11-24 | In Progress (unknown study) | Los Angeles Department of Water and Power | Current status |
| C1-39 | Washington | Solar+Battery | 300 | 2021-05-14 | IA Executed | PacifiCorp | Current status |
| C2-39 | Iron | Solar+Battery | 300 | 2022-04-28 | PacifiCorp | Current status | |
| C2-72 | Tooele | Solar+Battery | 300 | 2022-05-10 | Facility Study | PacifiCorp | Current status |
| PIS040 | Utah | Gas | 300 | 2023-06-05 | In Progress (unknown study) | PacifiCorp | Current status |
| PIS049 | Iron | Solar+Battery | 300 | 2023-12-22 | In Progress (unknown study) | PacifiCorp | Current status |
| S0035 | Washington | Gas | 300 | 2025-04-01 | In Progress (unknown study) | PacifiCorp | Current status |
| T2-028 | Iron | Solar+Battery | 300 | 2025-09-04 | PacifiCorp | Current status | |
| T2-056 | Juab | Solar+Battery | 300 | 2025-09-12 | PacifiCorp | Current status | |
| T2-059 | Utah | Gas | 300 | 2025-09-12 | PacifiCorp | Current status | |
| T2-075 | San Juan | Battery | 300 | 2025-09-12 | PacifiCorp | Current status | |
| Q44 | Millard | Solar+Battery | 300 | 2013-09-04 | In Progress (unknown study) | Los Angeles Department of Water and Power | Current status |
| Q49 | Millard | Solar+Battery | 300 | 2015-08-25 | In Progress (unknown study) | Los Angeles Department of Water and Power | Current status |
| Q53 | Millard | Solar+Battery | 285 | 2016-07-28 | IA Pending | Los Angeles Department of Water and Power | Current status |
| PIS047 | Juab | Solar+Battery | 275 | 2023-12-22 | In Progress (unknown study) | PacifiCorp | Current status |
| T2-023 | Juab | Solar+Battery | 275 | 2025-09-04 | PacifiCorp | Current status | |
| Q85 | Juab | Solar+Battery | 275 | 2021-10-27 | In Progress (unknown study) | Los Angeles Department of Water and Power | Current status |
| T2-053 | Iron | Solar+Battery | 248 | 2025-09-12 | PacifiCorp | Current status | |
| T2-061 | Salt Lake | Battery | 225 | 2025-09-12 | PacifiCorp | Current status | |
| Q83 | Millard | Other Storage | 220 | 2021-09-28 | System Impact Study | Los Angeles Department of Water and Power | Current status |
| C1-34 | Utah | Solar+Battery | 200 | 2021-05-12 | IA Executed | PacifiCorp | Current status |
| PIS024 | Utah | Solar | 200 | 2022-07-16 | In Progress (unknown study) | PacifiCorp | Current status |
| S0017 | Iron | Battery | 200 | 2022-12-02 | In Progress (unknown study) | PacifiCorp | Current status |
| S0021 | Utah | Gas | 200 | 2023-10-17 | In Progress (unknown study) | PacifiCorp | Current status |
| S0037 | Emery | Battery | 200 | 2025-06-02 | In Progress (unknown study) | PacifiCorp | Current status |
| C2-02 | Juab | Gas | 200 | 2022-04-01 | Facility Study | PacifiCorp | Current status |
| C2-05 | Juab | Gas | 200 | 2022-04-01 | Facility Study | PacifiCorp | Current status |
| C3-171 | Weber | Battery | 200 | 2023-05-15 | Facility Study | PacifiCorp | Current status |
| PIS009 | Juab | Gas | 200 | 2022-06-24 | In Progress (unknown study) | PacifiCorp | Current status |
| PIS012 | Juab | Gas | 200 | 2022-06-24 | In Progress (unknown study) | PacifiCorp | Current status |
| 785 | Juab | Solar+Battery | 199 | 2025-04-14 | Facility Study | Idaho Power Company | Current status |
| C2-109 | Utah | Battery | 199 | 2022-05-13 | PacifiCorp | Current status | |
| C2-110 | Utah | Battery | 199 | 2022-05-13 | PacifiCorp | Current status | |
| C2-112 | Utah | Solar+Battery | 199 | 2022-05-13 | PacifiCorp | Current status | |
| C2-115 | Utah | Solar+Battery | 199 | 2022-05-13 | Facility Study | PacifiCorp | Current status |
| C2-131 | Emery | Solar+Battery | 199 | 2022-05-14 | Facility Study | PacifiCorp | Current status |
| C2-28 | Salt Lake | Battery | 199 | 2022-04-18 | IA Executed | PacifiCorp | Current status |
| C2-56 | Utah | Solar+Battery | 199 | 2022-05-06 | PacifiCorp | Current status | |
| C2-57 | Utah | Solar+Battery | 199 | 2022-05-06 | PacifiCorp | Current status | |
| C2-58 | Utah | Solar+Battery | 199 | 2022-05-06 | PacifiCorp | Current status | |
| C2-59 | Utah | Solar+Battery | 199 | 2022-05-06 | PacifiCorp | Current status | |
| C3-132 | Millard | Solar+Battery | 199 | 2023-05-15 | PacifiCorp | Current status | |
| PIS025 | Utah | Battery | 199 | 2022-07-16 | In Progress (unknown study) | PacifiCorp | Current status |
| PIS026 | Utah | Battery | 199 | 2022-07-16 | In Progress (unknown study) | PacifiCorp | Current status |
| PIS042 | Utah | Solar | 199 | 2023-06-05 | In Progress (unknown study) | PacifiCorp | Current status |
| PIS043 | Utah | Solar | 199 | 2023-06-05 | In Progress (unknown study) | PacifiCorp | Current status |
| PIS088 | Salt Lake | Battery | 199 | 2024-09-06 | In Progress (unknown study) | PacifiCorp | Current status |
| PIS105 | Emery | Solar+Battery | 199 | 2025-12-18 | In Progress (unknown study) | PacifiCorp | Current status |
| T2-060 | Utah | Solar+Battery | 199 | 2025-09-12 | PacifiCorp | Current status | |
| T2-062 | Utah | Solar+Battery | 199 | 2025-09-12 | PacifiCorp | Current status | |
| T2-063 | Utah | Solar+Battery | 199 | 2025-09-12 | PacifiCorp | Current status | |
| T2-071 | San Juan | Solar+Battery | 199 | 2025-09-12 | PacifiCorp | Current status | |
| T2-035 | Millard | Gas | 185 | 2025-09-09 | PacifiCorp | Current status | |
| 823 | Emery | Solar | 178 | 2016-11-15 | IA Executed | PacifiCorp | Current status |
| PIS056 | Emery | Solar | 178 | 2024-05-31 | In Progress (unknown study) | PacifiCorp | Current status |
| T2-055 | Juab | Solar+Battery | 175 | 2025-09-12 | PacifiCorp | Current status | |
| C2-99 | Emery | Solar+Battery | 166 | 2022-05-13 | Facility Study | PacifiCorp | Current status |
| T2-080 | Salt Lake | Battery | 160 | 2025-09-12 | PacifiCorp | Current status | |
| PIS027 | Utah | Solar | 150 | 2022-07-16 | In Progress (unknown study) | PacifiCorp | Current status |
| T2-037 | Emery | Solar+Battery | 150 | 2025-09-10 | PacifiCorp | Current status | |
| C2-167 | Emery | Solar | 125 | 2022-05-15 | Facility Study | PacifiCorp | Current status |
| PIS057 | Emery | Solar | 125 | 2024-05-31 | In Progress (unknown study) | PacifiCorp | Current status |
| S0033 | Washington | Battery | 122 | 2024-12-06 | In Progress (unknown study) | PacifiCorp | Current status |
| 786 | Summit | Wind | 100 | 2016-08-04 | IA Executed | PacifiCorp | Current status |
| S0015 | Emery | Battery | 100 | 2022-11-18 | IA Executed | PacifiCorp | Current status |
| S0036 | Emery | Battery | 100 | 2025-06-02 | In Progress (unknown study) | PacifiCorp | Current status |
| T2-054 | Utah | Solar+Battery | 100 | 2025-09-12 | PacifiCorp | Current status | |
| 634 | Beaver | Solar | 99 | 2014-11-20 | IA Executed | PacifiCorp | Current status |
| 636 | Iron | Solar | 99 | 2014-12-03 | IA Executed | PacifiCorp | Current status |
| 805 | Kane | Solar | 95 | 2016-09-30 | Suspended | PacifiCorp | Current status |
| 754 | Box Elder | Solar+Battery | 80 | 2016-05-25 | IA Executed | PacifiCorp | Current status |
| 781 | Tooele | Solar | 80 | 2016-08-01 | IA Executed | PacifiCorp | Current status |
| 792 | Carbon | Solar+Battery | 80 | 2016-09-01 | IA Executed | PacifiCorp | Current status |
| S0007 | Beaver | Battery | 80 | 2022-03-23 | IA Executed | PacifiCorp | Current status |
| S0008 | Beaver | Battery | 80 | 2022-03-23 | IA Executed | PacifiCorp | Current status |
| S0009 | Beaver | Battery | 80 | 2022-03-23 | IA Executed | PacifiCorp | Current status |
| S0010 | Iron | Battery | 80 | 2022-03-23 | IA Executed | PacifiCorp | Current status |
| S0011 | Iron | Battery | 80 | 2022-03-23 | IA Executed | PacifiCorp | Current status |
| S0013 | Iron | Battery | 80 | 2022-03-23 | IA Executed | PacifiCorp | Current status |
| S0016 | Sevier | Battery | 80 | 2022-11-18 | IA Executed | PacifiCorp | Current status |
| S0020 | Tooele | Solar | 80 | 2022-12-23 | In Progress (unknown study) | PacifiCorp | Current status |
| S0031 | Box Elder | Battery | 80 | 2024-08-02 | In Progress (unknown study) | PacifiCorp | Current status |
| S0034 | Juab | Battery | 80 | 2024-12-18 | In Progress (unknown study) | PacifiCorp | Current status |
| 846 | Tooele | Solar | 75 | 2017-01-10 | IA Executed | PacifiCorp | Current status |
| C3-125 | Millard | Solar+Battery | 75 | 2023-05-15 | PacifiCorp | Current status | |
| PIS106 | Miller | Solar+Battery | 75 | 2025-12-18 | In Progress (unknown study) | PacifiCorp | Current status |
| S0018 | Tooele | Battery | 75 | 2022-12-22 | In Progress (unknown study) | PacifiCorp | Current status |
| PIS092 | Utah | Gas | 73 | 2024-10-31 | In Progress (unknown study) | PacifiCorp | Current status |
| PIS093 | Juab | Gas | 71 | 2024-10-31 | In Progress (unknown study) | PacifiCorp | Current status |
| C2-168 | Emery | Solar | 70 | 2022-05-15 | Facility Study | PacifiCorp | Current status |
| PIS058 | Emery | Solar | 70 | 2024-05-31 | In Progress (unknown study) | PacifiCorp | Current status |
| PIS090 | Utah | Gas | 62 | 2024-10-31 | In Progress (unknown study) | PacifiCorp | Current status |
| 642 | Iron | Solar+Battery | 58 | 2015-02-09 | Suspended | PacifiCorp | Current status |
| S0014 | Washington | Battery | 58 | 2022-11-18 | In Progress (unknown study) | PacifiCorp | Current status |
| T2-014 | Juab | Gas | 56 | 2025-08-29 | PacifiCorp | Current status | |
| T2-019 | Utah | Gas | 55 | 2025-08-29 | PacifiCorp | Current status | |
| S0012 | Iron | Battery | 50 | 2022-03-23 | IA Executed | PacifiCorp | Current status |
| T2-018 | Utah | Gas | 25 | 2025-08-29 | PacifiCorp | Current status | |
| 815 | Emery | Solar | 20 | 2016-11-07 | IA Executed | PacifiCorp | Current status |
| T2-003 | Millard | Geothermal | 20 | 2025-08-15 | PacifiCorp | Current status | |
| T2-004 | Sevier | Geothermal | 20 | 2025-08-15 | PacifiCorp | Current status | |
| T2-005 | Millard | Geothermal | 20 | 2025-08-15 | PacifiCorp | Current status | |
| T2-006 | Tooele | Solar+Battery | 20 | 2025-08-22 | PacifiCorp | Current status | |
| T2-039 | Emery | Solar+Battery | 20 | 2025-09-10 | PacifiCorp | Current status | |
| T2-042 | Millard | Solar+Battery | 20 | 2025-09-10 | PacifiCorp | Current status | |
| T2-043 | Millard | Solar+Battery | 20 | 2025-09-10 | PacifiCorp | Current status | |
| T2-044 | Millard | Solar+Battery | 20 | 2025-09-10 | PacifiCorp | Current status | |
| T2-045 | Millard | Solar+Battery | 20 | 2025-09-10 | PacifiCorp | Current status | |
| T2-046 | Millard | Solar+Battery | 20 | 2025-09-10 | PacifiCorp | Current status | |
| T2-047 | Millard | Solar+Battery | 20 | 2025-09-10 | PacifiCorp | Current status | |
| T2-048 | Millard | Solar+Battery | 20 | 2025-09-10 | PacifiCorp | Current status | |
| PIS091 | Salt Lake | Gas | 17 | 2024-10-31 | In Progress (unknown study) | PacifiCorp | Current status |
| T2-058 | Box Elder | Solar | 10 | 2025-09-12 | PacifiCorp | Current status | |
| T2-015 | Salt Lake | Gas | 7 | 2025-08-29 | PacifiCorp | Current status | |
| C1-04 | Salt Lake | Wind+Battery | 6 | 2021-04-01 | Facility Study | PacifiCorp | Current status |
| T2-012 | Beaver | Geothermal | 4 | 2025-08-29 | PacifiCorp | Current status | |
| C1-58 | Salt Lake | Wind | 2 | 2021-05-14 | Facility Study | PacifiCorp | Current status |
Lawrence Berkeley National Laboratory and GridTracker · Queued Up: Interconnection Queue Data File (Lawrence Berkeley National Laboratory) · data for 2025 · as of May 7, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0 May be out of date. The next release was due by May 7, 2027. Last checked for an update: Oct 31, 2026.