Interconnection queue in Texas
Data: Lawrence Berkeley National Laboratory and GridTracker, Queued Up, as of Dec 31, 2025.
This is an annual snapshot. A request's status may have changed since. Current status at Interconnection.fyi.
LBNL licenses the file CC BY 4.0, so project rows are shown and the file can be downloaded from our data library.
Statewide
- Active capacity
- 437,111 MW
- Active requests
- 1,904
- Median years in queue (active)
- 2.3
- Withdrawn, of requests entered by 2020
- 47%
| Type | Active capacity (MW) | Projects |
|---|---|---|
| Solar | 91,749 | 393 |
| Wind | 46,799 | 158 |
| Storage | 125,378 | 675 |
| Gas | 49,561 | 106 |
| Hybrid | 121,774 | 561 |
| Other | 1,851 | 11 |
By county
| County | Active capacity (MW) | Projects | Solar | Wind | Storage | Gas | Hybrid | Other | Median years in queue (active) | Withdrawn, of requests entered by 2020 |
|---|---|---|---|---|---|---|---|---|---|---|
| Brazoria | 12,483 | 57 | 1,827 | 1,744 | 5,867 | 827 | 2,218 | 2.5 | 32% of 34 | |
| Milam | 9,361 | 33 | 3,379 | 2,482 | 2,138 | 1,362 | 2.6 | |||
| Pecos | 9,291 | 36 | 3,968 | 2,175 | 1,044 | 107 | 1,997 | 1.5 | 38% of 29 | |
| Wharton | 9,040 | 38 | 3,390 | 200 | 2,711 | 1,436 | 1,304 | 2.2 | 36% of 36 | |
| Harris | 8,879 | 43 | 6,904 | 1,721 | 204 | 50 | 2.6 | |||
| Wilbarger | 7,512 | 21 | 1,367 | 146 | 905 | 3,157 | 1,937 | 1.8 | ||
| Mitchell | 7,177 | 17 | 473 | 303 | 1,033 | 334 | 5,033 | 1.6 | ||
| Jack | 6,746 | 17 | 534 | 1,426 | 660 | 4,126 | 4.2 | |||
| Lamar | 6,660 | 26 | 2,286 | 397 | 617 | 545 | 1,583 | 1,232 | 3.6 | |
| San Patricio | 6,438 | 25 | 1,509 | 1,029 | 924 | 721 | 2,254 | 1.7 | ||
| Upton | 6,081 | 19 | 848 | 1,241 | 1,675 | 888 | 1,430 | 3.3 | ||
| Borden | 6,080 | 17 | 2,047 | 12 | 402 | 3,619 | 0.8 | |||
| Cameron | 5,633 | 30 | 618 | 300 | 2,284 | 1,536 | 664 | 230 | 3.1 | |
| Matagorda | 5,546 | 26 | 1,805 | 241 | 1,433 | 2,067 | 3.1 | |||
| Bastrop | 5,239 | 15 | 265 | 846 | 3,822 | 306 | 1.5 | |||
| Deaf Smith | 5,237 | 10 | 3,164 | 1,866 | 207 | 2.4 | ||||
| Webb | 5,219 | 24 | 503 | 1,296 | 774 | 2,647 | 2.3 | |||
| Scurry | 5,167 | 16 | 1,384 | 574 | 213 | 2,996 | 2.1 | |||
| Reeves | 4,951 | 19 | 557 | 651 | 3,488 | 104 | 152 | 1.6 | ||
| Starr | 4,911 | 18 | 1,219 | 999 | 894 | 1,798 | 1.9 | |||
| Grimes | 4,894 | 19 | 816 | 2,320 | 750 | 958 | 50 | 2.2 | ||
| Bexar | 4,883 | 24 | 152 | 4,696 | 35 | 2.2 | ||||
| Navarro | 4,853 | 28 | 1,996 | 734 | 510 | 1,613 | 3.9 | |||
| Haskell | 4,721 | 19 | 1,587 | 578 | 120 | 2,436 | 3.6 | |||
| Ector | 4,699 | 25 | 698 | 1,107 | 123 | 2,771 | 1.2 | |||
| Freestone | 4,600 | 18 | 307 | 970 | 1,730 | 1,594 | 2.6 | |||
| Caldwell | 4,578 | 18 | 38 | 760 | 3,338 | 443 | 1.1 | |||
| Zapata | 4,423 | 19 | 873 | 1,974 | 1,420 | 156 | 2.8 | |||
| Ellis | 4,421 | 23 | 1,080 | 2,619 | 54 | 618 | 50 | 1.8 | ||
| Robertson | 3,999 | 21 | 1,837 | 2,162 | 1.8 | |||||
| Hidalgo | 3,981 | 29 | 291 | 468 | 2,559 | 662 | 2.9 | |||
| Hill | 3,957 | 21 | 1,100 | 297 | 1,520 | 1,039 | 3.5 | |||
| Duval | 3,833 | 16 | 794 | 508 | 248 | 335 | 1,948 | 0.9 | ||
| Bell | 3,631 | 14 | 617 | 1,497 | 942 | 575 | 3.2 | |||
| Austin | 3,514 | 11 | 1,523 | 1,485 | 506 | 1.5 | ||||
| Colorado | 3,495 | 19 | 208 | 939 | 122 | 2,226 | 2.2 | |||
| Ward | 3,430 | 13 | 84 | 906 | 2,260 | 180 | 1.5 | |||
| Victoria | 3,411 | 18 | 649 | 277 | 1,524 | 961 | 2.6 | |||
| Harrison | 3,388 | 8 | 180 | 499 | 2,334 | 375 | 2.3 | |||
| Fort Bend | 3,320 | 14 | 790 | 2,530 | 2.6 | |||||
| Castro | 3,251 | 11 | 1,410 | 989 | 553 | 300 | 2.6 | |||
| Armstrong | 3,250 | 5 | 1,703 | 1,547 | 1.6 | |||||
| Jones | 3,127 | 13 | 1,259 | 300 | 1,569 | 3.5 | ||||
| Galveston | 3,095 | 13 | 1,029 | 2,052 | 14 | 2.7 | ||||
| Fisher | 3,090 | 11 | 1,376 | 1,144 | 570 | 2.2 | ||||
| Comanche | 3,042 | 12 | 142 | 1,428 | 1,473 | 3.3 | ||||
| Glasscock | 3,037 | 16 | 300 | 981 | 908 | 848 | 1.8 | |||
| Nueces | 2,976 | 16 | 154 | 1,947 | 351 | 523 | 2.6 | |||
| Wilson | 2,936 | 12 | 146 | 780 | 2,011 | 3.1 | ||||
| Hale | 2,935 | 7 | 500 | 1,621 | 815 | 1.7 | 60% of 20 | |||
| Young | 2,846 | 12 | 201 | -27 | 463 | 2,199 | 10 | 1.1 | ||
| Goliad | 2,826 | 12 | 477 | 314 | 655 | 1,380 | 2.7 | |||
| Nolan | 2,652 | 16 | 518 | 769 | 152 | 1,212 | 4.0 | |||
| Leon | 2,636 | 10 | 602 | 659 | 1,375 | 3.2 | ||||
| Franklin | 2,619 | 9 | 93 | 1,660 | 865 | 2.3 | ||||
| Brown | 2,587 | 14 | 633 | 904 | 1,050 | 3.0 | ||||
| Howard | 2,561 | 15 | 566 | 254 | 1,648 | 93 | 1.4 | |||
| Wichita | 2,521 | 12 | 251 | 1,304 | 966 | 2.0 | ||||
| Crane | 2,494 | 11 | 307 | 553 | 1,635 | 3.3 | ||||
| Taylor | 2,451 | 14 | 1,005 | 256 | 574 | 615 | 1.2 | |||
| Concho | 2,371 | 8 | 352 | 379 | 1,640 | 2.1 | ||||
| Gray | 2,371 | 4 | 703 | 1,418 | 250 | 1.6 | ||||
| Mclennan | 2,305 | 13 | 586 | 297 | 1,078 | 43 | 301 | 2.3 | ||
| Dickens | 2,303 | 9 | 909 | 293 | 703 | 399 | 1.8 | |||
| Hopkins | 2,295 | 13 | 778 | 814 | 704 | 3.3 | ||||
| Schleicher | 2,266 | 11 | 412 | 303 | 357 | 1,194 | 2.0 | |||
| Jim Hogg | 2,249 | 8 | 503 | 1,746 | 0.5 | |||||
| Anderson | 2,237 | 6 | 137 | 518 | 1,381 | 201 | 3.3 | |||
| Hardeman | 2,194 | 8 | 1,381 | 206 | 607 | 2.4 | ||||
| Swisher | 2,186 | 6 | 832 | 641 | 713 | 2.6 | ||||
| Andrews | 2,167 | 9 | 200 | 247 | 812 | 908 | 4.6 | |||
| Knox | 2,162 | 9 | 853 | 352 | 77 | 880 | 1.1 | |||
| Refugio | 2,136 | 5 | 397 | 101 | 1,639 | 2.4 | ||||
| La Salle | 2,130 | 9 | 917 | 197 | 805 | 211 | 2.5 | |||
| Clay | 2,108 | 5 | 452 | 242 | 308 | 1,107 | 3.3 | |||
| Yoakum | 2,037 | 7 | 300 | 757 | 980 | 1.2 | ||||
| Houston | 2,032 | 10 | 250 | 328 | 1,454 | 1.9 | ||||
| Kaufman | 2,024 | 13 | 206 | 308 | 1,510 | 3.4 | ||||
| Hood | 2,013 | 5 | 201 | 1,558 | 253 | 0.8 | ||||
| Callahan | 1,972 | 6 | 819 | 340 | 205 | 608 | 4.3 | |||
| Briscoe | 1,964 | 4 | 912 | 641 | 411 | 1.8 | ||||
| Henderson | 1,908 | 10 | 302 | 1,606 | 2.4 | |||||
| Lampasas | 1,840 | 10 | 462 | 751 | 626 | 1.7 | ||||
| Guadalupe | 1,803 | 11 | 778 | 565 | 459 | 3.7 | ||||
| Falls | 1,737 | 9 | 901 | 199 | 637 | 4.2 | ||||
| El Paso | 1,697 | 11 | 250 | 700 | 747 | 1.8 | ||||
| Waller | 1,691 | 6 | 358 | 1,333 | 1.8 | |||||
| Karnes | 1,685 | 10 | 301 | 368 | 1,016 | 1.9 | ||||
| Wise | 1,662 | 9 | 1,414 | 21 | 227 | 2.0 | ||||
| Nacogdoches | 1,620 | 8 | 1,620 | 2.1 | ||||||
| Carson | 1,618 | 4 | 606 | 201 | 811 | 2.8 | ||||
| Dimmit | 1,604 | 13 | 300 | 792 | 512 | 1.4 | ||||
| Tom Green | 1,604 | 8 | 122 | 559 | 596 | 326 | 2.9 | |||
| Baylor | 1,600 | 4 | 815 | 785 | 1.5 | |||||
| Bee | 1,599 | 10 | 412 | 268 | 177 | 741 | 2.5 | |||
| Orange | 1,592 | 3 | 300 | 126 | 1,166 | 4.0 | ||||
| Crockett | 1,581 | 7 | 400 | 265 | 660 | 255 | 2.5 | |||
| Tarrant | 1,552 | 6 | 1,552 | 1.4 | ||||||
| Coleman | 1,545 | 6 | 1,405 | 141 | 0.1 | |||||
| Van Zandt | 1,513 | 11 | 121 | 197 | 943 | 251 | 2.3 | |||
| Maverick | 1,506 | 8 | 251 | 850 | 404 | 1.9 | ||||
| Parker | 1,472 | 3 | 602 | 870 | 1.6 | |||||
| Cottle | 1,458 | 6 | 552 | 502 | 404 | 2.1 | ||||
| Gonzales | 1,429 | 10 | 604 | 295 | 50 | 480 | 4.0 | |||
| Frio | 1,421 | 8 | 714 | 104 | 603 | 0.9 | ||||
| Atascosa | 1,413 | 11 | 729 | 480 | 203 | 1.2 | ||||
| Culberson | 1,409 | 5 | 61 | 740 | 608 | 2.2 | ||||
| Morris | 1,381 | 3 | 300 | 1,081 | 1.3 | |||||
| Hunt | 1,371 | 8 | 277 | 990 | 104 | 2.0 | ||||
| Kinney | 1,335 | 9 | 236 | 486 | 612 | 2.4 | ||||
| Cherokee | 1,325 | 3 | 151 | 1,174 | 4.4 | |||||
| Angelina | 1,314 | 5 | 181 | 533 | 600 | 2.2 | ||||
| Kenedy | 1,311 | 4 | 252 | 523 | 536 | 1.2 | ||||
| Cooke | 1,300 | 6 | 180 | 970 | 151 | 3.1 | ||||
| Limestone | 1,291 | 10 | 896 | 50 | 345 | 3.5 | ||||
| Sterling | 1,289 | 7 | 412 | 272 | 605 | 0.9 | ||||
| Grayson | 1,287 | 4 | 403 | 314 | 570 | 1.3 | ||||
| Chambers | 1,281 | 5 | 212 | 372 | 697 | 4.0 | ||||
| Liberty | 1,250 | 7 | 1,070 | 180 | 4.3 | |||||
| Rusk | 1,241 | 6 | 503 | 502 | 236 | 3.1 | ||||
| Willacy | 1,229 | 7 | 827 | 401 | 3.6 | |||||
| Dawson | 1,208 | 6 | 848 | 360 | 4.0 | |||||
| Midland | 1,197 | 6 | 134 | 610 | 453 | 2.5 | ||||
| Collin | 1,181 | 6 | 1,181 | 2.8 | ||||||
| Hutchinson | 1,165 | 4 | 600 | 565 | 2.0 | |||||
| Mills | 1,148 | 6 | 302 | 201 | 645 | 1.8 | ||||
| Jefferson | 1,109 | 2 | 289 | 820 | 0.7 | |||||
| Uvalde | 1,098 | 9 | 181 | 100 | 817 | 3.4 | ||||
| Hansford | 1,089 | 5 | 690 | 67 | 332 | 1.2 | ||||
| Erath | 1,071 | 5 | 207 | 457 | 406 | 3.6 | ||||
| Sutton | 1,057 | 3 | 750 | 307 | 1.3 | |||||
| Dallas | 1,030 | 11 | 980 | 50 | 1.0 | |||||
| King | 1,013 | 3 | 406 | 607 | 2.0 | |||||
| Archer | 982 | 6 | 19 | 655 | 309 | 1.7 | ||||
| Johnson | 976 | 2 | 773 | 203 | 3.0 | |||||
| Dewitt | 972 | 5 | 150 | 821 | 6.0 | |||||
| Coke | 959 | 6 | 424 | 535 | 1.9 | |||||
| Medina | 956 | 7 | 151 | 644 | 161 | 1.5 | ||||
| Mcculloch | 952 | 4 | 352 | 600 | 1.4 | |||||
| Bowie | 900 | 5 | 900 | 2.2 | ||||||
| Jackson | 899 | 7 | 351 | 304 | 245 | 2.6 | ||||
| Eastland | 896 | 8 | 9 | 887 | 1.0 | |||||
| Bosque | 889 | 6 | 175 | 402 | 311 | 2.6 | ||||
| Runnels | 887 | 5 | 330 | 101 | 457 | 1.2 | ||||
| Brooks | 879 | 4 | 464 | 415 | 1.4 | |||||
| Motley | 852 | 2 | 600 | 252 | 2.5 | |||||
| Kent | 822 | 4 | 563 | 259 | 0.9 | |||||
| Fayette | 816 | 4 | 200 | 616 | 2.0 | |||||
| Madison | 815 | 4 | 201 | 614 | 3.2 | |||||
| Montague | 814 | 3 | 203 | 611 | 0.3 | |||||
| Stonewall | 799 | 3 | 799 | 1.6 | ||||||
| Zavala | 692 | 6 | 425 | 267 | 1.8 | |||||
| Somervell | 666 | 2 | 171 | 495 | 2.9 | |||||
| Potter | 640 | 2 | 140 | 500 | 0.5 | |||||
| Lamb | 639 | 3 | 406 | 233 | 1.2 | |||||
| Travis | 632 | 8 | -53 | 610 | 75 | 2.2 | ||||
| San Jacinto | 628 | 2 | 478 | 150 | 1.8 | |||||
| Lubbock | 625 | 3 | 625 | 3.5 | ||||||
| Reagan | 618 | 3 | 310 | 308 | 1.2 | |||||
| Childress | 603 | 4 | 100 | 503 | 3.8 | |||||
| Crosby | 601 | 3 | 551 | 50 | 2.9 | |||||
| Hardin | 598 | 3 | 398 | 200 | 4.1 | |||||
| Foard | 578 | 2 | 276 | 301 | 2.6 | |||||
| Polk | 575 | 3 | 335 | 240 | 3.3 | |||||
| Parmer | 565 | 2 | 565 | 7.6 | ||||||
| Randall | 550 | 2 | 250 | 300 | 0.8 | |||||
| Burnet | 520 | 5 | 354 | 167 | 2.1 | |||||
| Throckmorton | 506 | 4 | 332 | 174 | 3.3 | |||||
| Calhoun | 503 | 3 | 195 | 308 | 4.8 | |||||
| Terry | 503 | 2 | 150 | 353 | 6.9 | |||||
| Fannin | 502 | 2 | 502 | 3.1 | ||||||
| Dallam | 500 | 2 | 500 | 0.8 | ||||||
| Floyd | 500 | 2 | 500 | 1.2 | ||||||
| Martin | 492 | 3 | 492 | 2.6 | ||||||
| Gillespie | 449 | 3 | 149 | 300 | 2.9 | |||||
| Val Verde | 426 | 4 | 95 | 331 | 2.2 | |||||
| Montgomery | 423 | 2 | 217 | 206 | 1.7 | |||||
| Shackelford | 410 | 2 | 204 | 207 | 1.0 | |||||
| Comal | 407 | 2 | 407 | 0.5 | ||||||
| Bailey | 401 | 1 | 401 | 0.8 | ||||||
| Jim Wells | 387 | 6 | 110 | 276 | 1.6 | |||||
| Hockley | 384 | 1 | 384 | 0.2 | ||||||
| Smith | 381 | 2 | 381 | 4.0 | ||||||
| Palo Pinto | 365 | 3 | 365 | 2.5 | ||||||
| Marion | 360 | 3 | 50 | 310 | 0.8 | |||||
| Menard | 356 | 3 | 152 | 204 | 2.0 | |||||
| Kendall | 352 | 2 | 352 | 3.4 | ||||||
| Bandera | 345 | 4 | 125 | 221 | 3.1 | |||||
| Kleberg | 340 | 2 | 265 | 75 | 2.7 | |||||
| Red River | 330 | 3 | 330 | 1.4 | ||||||
| Live Oak | 323 | 5 | 181 | 60 | 82 | 1.7 | ||||
| Brazos | 316 | 3 | 202 | 114 | 1.9 | |||||
| Lavaca | 310 | 1 | 310 | 2.1 | ||||||
| Kimble | 306 | 1 | 306 | 1.4 | ||||||
| Rains | 302 | 2 | 126 | 176 | 2.8 | |||||
| Stephens | 301 | 3 | 148 | 153 | 0.9 | |||||
| Lynn | 282 | 1 | 282 | 7.0 | ||||||
| Washington | 269 | 2 | 60 | 209 | 2.9 | |||||
| Mcmullen | 261 | 1 | 261 | 4.2 | ||||||
| Ochiltree | 253 | 2 | 200 | 53 | 4.3 | |||||
| Rockwall | 251 | 2 | 251 | 3.0 | ||||||
| Hudspeth | 250 | 1 | 250 | 2.3 | ||||||
| Trinity | 250 | 2 | 100 | 150 | 0.3 | |||||
| Lee | 235 | 3 | 154 | 81 | 3.1 | |||||
| Brewster | 229 | 2 | 229 | 0.6 | ||||||
| Winkler | 207 | 1 | 207 | 5.4 | ||||||
| Denton | 201 | 1 | 201 | 0.2 | ||||||
| Titus | 200 | 1 | 200 | 4.7 | ||||||
| Delta | 187 | 3 | 76 | 110 | 4.2 | |||||
| Newton | 175 | 1 | 175 | 3.3 | ||||||
| Blanco | 154 | 1 | 154 | 1.0 | ||||||
| Walker | 150 | 1 | 150 | 5.5 | ||||||
| Sabine | 142 | 1 | 142 | 0.8 | ||||||
| Kerr | 123 | 1 | 123 | 3.2 | ||||||
| Hays | 121 | 4 | 85 | 36 | 3.9 | |||||
| Cochran | 120 | 1 | 120 | 2.9 | ||||||
| Shelby | 120 | 1 | 120 | 0.8 | ||||||
| Coryell | 108 | 2 | 56 | 52 | 5.5 | |||||
| Williamson | 101 | 1 | 101 | 3.4 | ||||||
| Cass | 75 | 1 | 75 | 1.2 | ||||||
| Loving | 44 | 1 | 44 | 1.2 | ||||||
| Hamilton | 41 | 1 | 41 | 0.6 | ||||||
| County not given | 27 | 1 | 27 | 13.6 | ||||||
| Jasper | 0 | 0 | ||||||||
| Tyler | 0 | 0 | ||||||||
| Peoria | 0 | 0 | ||||||||
| Logan | 0 | 0 | ||||||||
| Moore | 0 | 0 | ||||||||
| Wood | 0 | 0 | ||||||||
| Oldham | 0 | 0 | ||||||||
| Sherman | 0 | 0 | ||||||||
| Donley | 0 | 0 | ||||||||
| Garza | 0 | 0 | ||||||||
| Lipscomb | 0 | 0 | ||||||||
| Hall | 0 | 0 | ||||||||
| Gaines | 0 | 0 | ||||||||
| Camp | 0 | 0 | ||||||||
| Wheeler | 0 | 0 | ||||||||
| Irion | 0 | 0 | ||||||||
| Mason | 0 | 0 |
Capacity is each request's first-listed capacity, so a hybrid's battery is not added on top. Most requests in a queue never get built.
Active requests
Status is as of Dec 31, 2025. Current status at Interconnection.fyi.
| Project | County | Type | MW | Entered the queue | Study phase | Utility or operator | Live status |
|---|---|---|---|---|---|---|---|
| Prairie Ridge (Gas - CC) | Franklin | Gas | 1,660 | 2025-12-01 | Facility Study | ERCOT | Current status |
| Hecate Energy Orem Wind | Brazoria | Wind | 1,542 | 2023-06-28 | Facility Study | ERCOT | Current status |
| Aegle Power | Cameron | Gas | 1,536 | 2024-07-22 | Facility Study | ERCOT | Current status |
| Big Canyon Wind | Pecos | Wind | 1,500 | 2025-01-13 | Facility Study | ERCOT | Current status |
| Caldwell County Energy Center | Caldwell | Gas | 1,500 | 2025-02-03 | Facility Study | ERCOT | Current status |
| Mule Deer Run Gas | Anderson | Gas | 1,381 | 2025-11-18 | Facility Study | ERCOT | Current status |
| GEN-2024-377 | Harrison | Gas | 1,350 | 2025-03-01 | System Impact Study | AEP | Current status |
| BasRanch (TEF - Due Diligence) | Ward | Gas | 1,350 | 2020-08-04 | IA Executed | ERCOT | Current status |
| Sandow Lakes Energy Station | Milam | Gas | 1,292 | 2024-03-22 | Facility Study | ERCOT | Current status |
| Jewett Energy Center 1 Gas | Freestone | Gas | 1,274 | 2025-10-21 | Facility Study | ERCOT | Current status |
| Tolar Energy Center | Hood | Gas | 1,252 | 2025-09-22 | Facility Study | ERCOT | Current status |
| Limitless Energy Hub I | Wilbarger | Gas | 1,238 | 2025-11-05 | Facility Study | ERCOT | Current status |
| Limitless Energy Hub II | Wilbarger | Gas | 1,238 | 2025-11-05 | Facility Study | ERCOT | Current status |
| Southeast Oklahoma Pumped Storage | Lamar | Other | 1,232 | 2022-08-05 | Facility Study | ERCOT | Current status |
| Wolf Bone North Energy Center | Reeves | Gas | 1,204 | 2025-10-21 | Facility Study | ERCOT | Current status |
| Spectra Solar | Scurry | Solar | 1,200 | 2025-12-23 | Facility Study | ERCOT | Current status |
| Eagle Pines Gas | Cherokee | Gas | 1,174 | 2015-03-30 | Facility Study | ERCOT | Current status |
| Replace 1163.3 MW of Sabine Units 3, 4 & 1 with 2 on 1 Combined Cycle Gas Turbine facility; Sabine 1 | Orange | Gas+Other | 1,166 | 2020-08-05 | ENTERGY TEXAS, INC. | Current status | |
| Aurelius Solar | Deaf Smith | Solar | 1,124 | 2023-07-18 | IA Executed | ERCOT | Current status |
| Bastrop Peaking Generators (TEF-Due Diligence) | Bastrop | Gas | 1,104 | 2024-02-02 | IA Executed | ERCOT | Current status |
| Zeus Armstrong BESS | Armstrong | Solar+Battery | 1,043 | 2024-03-22 | Facility Study | ERCOT | Current status |
| Zeus Scurry BESS | Scurry | Solar+Battery | 1,043 | 2025-06-05 | Facility Study | ERCOT | Current status |
| Zeus Mitchell BESS | Mitchell | Solar+Battery | 1,043 | 2024-05-20 | Facility Study | ERCOT | Current status |
| Zeus Mitchell BESS II | Mitchell | Solar+Battery | 1,043 | 2025-06-19 | Facility Study | ERCOT | Current status |
| EmberGreen | Wharton | Gas | 1,036 | 2024-06-13 | Facility Study | ERCOT | Current status |
| Hecate Energy Jamaica Wind | Galveston | Wind | 1,029 | 2023-06-28 | Facility Study | ERCOT | Current status |
| Hecate Energy Arkansas Wind | San Patricio | Wind | 1,029 | 2023-06-28 | Facility Study | ERCOT | Current status |
| Kickstart Energy Storage VI | Ellis | Battery | 1,026 | 2025-12-17 | Facility Study | ERCOT | Current status |
| Ross Solar | Refugio | Solar+Battery | 1,026 | 2023-07-31 | IA Executed | ERCOT | Current status |
| Kickstart Energy Storage V | Ellis | Battery | 999 | 2025-11-24 | Facility Study | ERCOT | Current status |
| Black Mountain Hale Gas | Hale | Gas | 991 | 2025-08-27 | Facility Study | ERCOT | Current status |
| Zeus Spade Wind | Mitchell | Wind+Battery | 987 | 2024-03-29 | Facility Study | ERCOT | Current status |
| Complex Serenity Wind | Armstrong | Wind | 971 | 2025-06-05 | Facility Study | ERCOT | Current status |
| Kilby1 Part 4 Large Block Simple Cycle | Reeves | Gas | 950 | 2025-11-18 | Facility Study | ERCOT | Current status |
| Riviera Gas | Bell | Gas | 942 | 2025-11-05 | Facility Study | ERCOT | Current status |
| GEN-2023-204 | Morris | Gas | 915 | 2023-10-02 | Facility Study | AEP | Current status |
| EmberYork | Austin | Gas | 900 | 2024-08-29 | IA Executed | ERCOT | Current status |
| Fierce River Solar | Starr | Solar+Battery | 896 | 2024-03-22 | Facility Study | ERCOT | Current status |
| West Royal Natural Gas (TEF-Due Diligence) | Upton | Gas | 888 | 2024-06-13 | Facility Study | ERCOT | Current status |
| Sim Gideon Combined Cycle | Bastrop | Gas | 880 | 2025-06-19 | Facility Study | ERCOT | Current status |
| Lost Pines Power Park | Bastrop | Gas | 880 | 2025-06-19 | Facility Study | ERCOT | Current status |
| SCHNEIDER COMBINED CYCLE | Caldwell | Gas | 880 | 2025-07-29 | Facility Study | ERCOT | Current status |
| MilamStation Power Secured Gas Generation | Milam | Gas | 846 | 2025-03-24 | Facility Study | ERCOT | Current status |
| E0030 | Jefferson | Gas | 820 | 2025-08-06 | In Progress (unknown study) | Entergy Texas, Inc. | Current status |
| Shadow Ranch Solar | Upton | Solar | 808 | 2022-09-27 | Facility Study | ERCOT | Current status |
| Zeus Mitchell Solar | Mitchell | Solar+Battery | 805 | 2024-03-22 | Facility Study | ERCOT | Current status |
| Indigo Solar 3 | Fisher | Solar | 800 | 2024-10-29 | Facility Study | ERCOT | Current status |
| Blue Bird Solar | Johnson | Solar | 773 | 2021-11-10 | IA Executed | ERCOT | Current status |
| Axis Ridge Wind | Sutton | Wind | 750 | 2024-11-19 | Facility Study | ERCOT | Current status |
| Central Power Station | Grimes | Gas | 750 | 2024-03-22 | Facility Study | ERCOT | Current status |
| Nabla Energy Storage I | Tarrant | Battery | 750 | 2025-11-05 | Facility Study | ERCOT | Current status |
| Nabla Energy Storage II | Parker | Battery | 750 | 2025-11-05 | Facility Study | ERCOT | Current status |
| Buffalo Jump Wind | Culberson | Wind | 740 | 2025-11-05 | Facility Study | ERCOT | Current status |
| Meitner 2 Wind | Gray | Wind | 709 | 2025-06-05 | Facility Study | ERCOT | Current status |
| Meitner Wind | Gray | Wind | 709 | 2023-07-18 | IA Executed | ERCOT | Current status |
| Meitner Solar | Gray | Solar | 703 | 2022-08-05 | IA Executed | ERCOT | Current status |
| Cedar Bayou 5 (TEF - Due Diligence) | Chambers | Gas | 697 | 2020-03-26 | IA Executed | ERCOT | Current status |
| TEXPO | Wilbarger | Gas | 680 | 2021-03-16 | Facility Study | ERCOT | Current status |
| Dovetail Solar 1 | Jack | Solar+Battery | 666 | 2021-09-21 | Facility Study | ERCOT | Current status |
| Dovetail Solar 2 | Jack | Solar+Battery | 666 | 2021-10-26 | Facility Study | ERCOT | Current status |
| Dovetail Solar 3 | Jack | Solar+Battery | 666 | 2021-12-13 | Facility Study | ERCOT | Current status |
| Jack County III – 345 kV | Jack | Gas | 660 | 2023-11-14 | Facility Study | ERCOT | Current status |
| Coleto Creek - Fuel Change Only | Goliad | Gas | 655 | 2025-04-21 | Facility Study | ERCOT | Current status |
| Pinnington Solar | Jack | Solar+Battery | 654 | 2020-12-03 | IA Executed | ERCOT | Current status |
| Commodus 2 Wind | Swisher | Wind | 641 | 2025-03-03 | Facility Study | ERCOT | Current status |
| Commodus Wind | Briscoe | Wind | 641 | 2024-07-22 | Facility Study | ERCOT | Current status |
| Cavell Wind | Castro | Wind | 641 | 2024-07-22 | Facility Study | ERCOT | Current status |
| Short Creek Solar | Wichita | Solar+Battery | 628 | 2022-01-20 | IA Executed | ERCOT | Current status |
| Aurelius 3 Wind | Deaf Smith | Wind | 623 | 2023-12-04 | Facility Study | ERCOT | Current status |
| Aurelius Wind | Deaf Smith | Wind | 622 | 2023-08-14 | IA Executed | ERCOT | Current status |
| Aurelius 2 Wind | Deaf Smith | Wind | 622 | 2023-12-04 | Facility Study | ERCOT | Current status |
| Howard Road BESS | Bexar | Battery | 618 | 2025-07-29 | Facility Study | ERCOT | Current status |
| Comanche BESS | Comanche | Battery | 614 | 2024-12-06 | Facility Study | ERCOT | Current status |
| Tumbleweed Solar | Borden | Solar+Battery | 614 | 2023-09-22 | Facility Study | ERCOT | Current status |
| Symphony BESS | Austin | Battery | 612 | 2025-02-14 | Facility Study | ERCOT | Current status |
| Skylab Solar | Wharton | Solar | 610 | 2020-06-03 | Facility Study | ERCOT | Current status |
| White Oak King Wind | King | Wind | 607 | 2023-03-09 | Facility Study | ERCOT | Current status |
| Kingsmill Wind SLF | Carson | Wind | 606 | 2024-01-11 | Facility Study | ERCOT | Current status |
| Lavita BESS | Bell | Battery | 606 | 2024-12-19 | Facility Study | ERCOT | Current status |
| Hiru Solar | Clay | Solar+Battery | 604 | 2021-04-21 | Facility Study | ERCOT | Current status |
| Moccasin Solar | Stonewall | Solar+Battery | 604 | 2023-09-07 | IA Executed | ERCOT | Current status |
| Operation Sunshine | Concho | Solar+Battery | 603 | 2023-11-14 | IA Executed | ERCOT | Current status |
| Moccasin Storage | Jones | Solar+Battery | 603 | 2025-01-28 | Facility Study | ERCOT | Current status |
| Danish Fields Solar | Wharton | Solar | 603 | 2018-04-12 | IA Executed | ERCOT | Current status |
| Hobby BESS I | Harris | Battery | 603 | 2024-09-04 | Facility Study | ERCOT | Current status |
| Rocking X Solar | Parker | Solar | 602 | 2023-10-04 | Facility Study | ERCOT | Current status |
| Cachena Solar SLF | Wilson | Solar+Battery | 601 | 2020-05-01 | IA Executed | ERCOT | Current status |
| Reunion Solar | Wilbarger | Solar+Battery | 601 | 2025-03-24 | Facility Study | ERCOT | Current status |
| Proteus London-Leigh Solar SLF | Glasscock | Solar+Battery | 600 | 2024-03-22 | Facility Study | ERCOT | Current status |
| Longleaf Power Station | Angelina | Gas | 600 | 2023-10-13 | Facility Study | ERCOT | Current status |
| Scorpius Solar | Milam | Solar | 600 | 2024-12-16 | Facility Study | ERCOT | Current status |
| Sitges Wind | Motley | Wind | 600 | 2024-03-22 | Facility Study | ERCOT | Current status |
| Jenna Eco-Electric Solar | Fisher | Solar | 576 | 2024-05-20 | Facility Study | ERCOT | Current status |
| RAYBURN ENERGY STATION II Gas (TEF-Due Diligence) | Grayson | Gas | 570 | 2025-01-13 | Facility Study | ERCOT | Current status |
| Big Rooter East Solar | Robertson | Solar+Battery | 555 | 2024-03-22 | IA Executed | ERCOT | Current status |
| Rio Vista Solar | Pecos | Solar+Battery | 554 | 2025-06-19 | Facility Study | ERCOT | Current status |
| Miller Bend Energy BESS | Young | Solar+Battery | 548 | 2025-12-17 | Facility Study | ERCOT | Current status |
| Miller Bend Energy Solar | Young | Solar+Battery | 532 | 2025-12-17 | Facility Study | ERCOT | Current status |
| Mojo Solar | Wilson | Solar+Battery | 528 | 2025-03-03 | Facility Study | ERCOT | Current status |
| Dundee East A Wind | Baylor | Wind | 524 | 2023-01-03 | IA Executed | ERCOT | Current status |
| TOCE TX BESS 2 | Wharton | Battery | 523 | 2024-02-02 | Facility Study | ERCOT | Current status |
| Tall Saddle Wind | Kenedy | Wind | 523 | 2024-07-01 | Facility Study | ERCOT | Current status |
| Sunscape Renewable Energy Solar SLF | Nueces | Solar+Battery | 523 | 2023-06-28 | IA Executed | ERCOT | Current status |
| Knight Airport BESS I | Harris | Battery | 522 | 2024-08-16 | Facility Study | ERCOT | Current status |
| Avalon BESS | Fort Bend | Battery | 522 | 2023-12-20 | IA Executed | ERCOT | Current status |
| Elmax Power Station | Harris | Gas | 519 | 2021-09-14 | IA Executed | ERCOT | Current status |
| Falcon BESS | Zapata | Battery | 517 | 2025-09-09 | Facility Study | ERCOT | Current status |
| Ochoa Energy Storage II | Waller | Battery | 517 | 2024-04-15 | Facility Study | ERCOT | Current status |
| Renegade Project | Deaf Smith | Solar | 516 | 2019-02-26 | IA Executed | ERCOT | Current status |
| Catamount Storage | Harris | Battery | 515 | 2024-09-04 | Facility Study | ERCOT | Current status |
| Seven Angels Energy Storage I | Hill | Battery | 514 | 2025-11-05 | Facility Study | ERCOT | Current status |
| Seven Angels Energy Storage II | Hill | Battery | 514 | 2025-11-05 | Facility Study | ERCOT | Current status |
| Diamante BESS | Grimes | Battery | 514 | 2024-02-27 | Facility Study | ERCOT | Current status |
| GEN-2022-GR1 | Harrison | Gas | 513 | 2022-03-23 | IA Executed | AEP | Current status |
| La Salle Solar | La Salle | Solar | 513 | 2023-04-19 | IA Executed | ERCOT | Current status |
| Half Moon Solar | Starr | Solar | 513 | 2025-01-13 | IA Executed | ERCOT | Current status |
| Old Aqueduct Solar | Hale | Solar+Battery | 512 | 2020-12-03 | Facility Study | ERCOT | Current status |
| Ross Storage | Refugio | Solar+Battery | 511 | 2023-08-14 | IA Executed | ERCOT | Current status |
| Midnight Sun Energy Storage | Crockett | Battery | 510 | 2022-12-07 | IA Executed | ERCOT | Current status |
| Velveteen Solar I | Baylor | Solar | 509 | 2025-12-23 | Facility Study | ERCOT | Current status |
| Dovetail Storage | Jack | Solar+Battery | 509 | 2021-09-28 | Facility Study | ERCOT | Current status |
| Bottom Grass Solar | Colorado | Solar+Battery | 509 | 2020-11-05 | IA Executed | ERCOT | Current status |
| Crescent C BESS | La Salle | Battery | 508 | 2023-04-07 | Facility Study | ERCOT | Current status |
| Outpost Storage | Webb | Solar+Battery | 508 | 2021-03-01 | Facility Study | ERCOT | Current status |
| Tres Rios Ranch Solar | Upton | Solar+Battery | 508 | 2022-08-05 | Facility Study | ERCOT | Current status |
| Tumbleweed Storage | Borden | Solar+Battery | 507 | 2023-10-04 | Facility Study | ERCOT | Current status |
| Tabor Solar | Hardeman | Solar | 506 | 2020-09-02 | Facility Study | ERCOT | Current status |
| Fort Worth Power Core Bastrop Gas Plant | Bastrop | Gas | 506 | 2025-05-27 | Facility Study | ERCOT | Current status |
| Big Field Solar | Wilbarger | Solar | 506 | 2025-06-11 | Facility Study | ERCOT | Current status |
| Harley Hand Solar | Nolan | Solar+Battery | 506 | 2019-12-16 | Facility Study | ERCOT | Current status |
| Tehuacana Creek Solar | Navarro | Solar+Battery | 505 | 2021-12-20 | IA Executed | ERCOT | Current status |
| Oriole Solar | Knox | Solar+Battery | 504 | 2023-05-15 | Facility Study | ERCOT | Current status |
| Frye Storage | Swisher | Solar+Battery | 504 | 2020-09-02 | Facility Study | ERCOT | Current status |
| Hiru Storage | Clay | Solar+Battery | 504 | 2022-11-15 | Facility Study | ERCOT | Current status |
| Zeus Armstrong Solar | Armstrong | Solar+Battery | 504 | 2024-05-20 | Facility Study | ERCOT | Current status |
| Zeus Scurry Solar | Scurry | Solar+Battery | 504 | 2025-06-03 | Facility Study | ERCOT | Current status |
| Harley Hand Storage | Nolan | Solar+Battery | 503 | 2021-03-01 | Facility Study | ERCOT | Current status |
| Cielo Vista Solar | Duval | Solar+Battery | 503 | 2025-04-21 | Facility Study | ERCOT | Current status |
| Gypsum Plains Solar | Ector | Solar+Battery | 503 | 2025-06-05 | Facility Study | ERCOT | Current status |
| Magnet Solar | Borden | Solar+Battery | 503 | 2025-04-21 | IA Executed | ERCOT | Current status |
| Muy Grande Solar | Starr | Solar | 503 | 2024-01-11 | Facility Study | ERCOT | Current status |
| Pinnington Storage | Jack | Solar+Battery | 503 | 2020-12-03 | Facility Study | ERCOT | Current status |
| Dog Star Solar I | Taylor | Solar | 503 | 2025-07-07 | Facility Study | ERCOT | Current status |
| Dog Star Solar II | Taylor | Solar | 503 | 2025-07-02 | Facility Study | ERCOT | Current status |
| Austin Bayou Solar | Brazoria | Solar+Battery | 502 | 2022-06-27 | IA Executed | ERCOT | Current status |
| Duffy Solar | Matagorda | Solar+Battery | 502 | 2020-09-11 | IA Executed | ERCOT | Current status |
| River Boat Solar | Mitchell | Solar+Battery | 502 | 2024-09-04 | Facility Study | ERCOT | Current status |
| Commodus Solar | Briscoe | Solar | 502 | 2024-07-22 | Facility Study | ERCOT | Current status |
| Commodus 2 Solar | Swisher | Solar | 502 | 2025-03-03 | Facility Study | ERCOT | Current status |
| Cavell Solar | Castro | Solar | 502 | 2024-07-22 | Facility Study | ERCOT | Current status |
| Orbit Energy Storage | Bexar | Battery | 502 | 2023-11-30 | Facility Study | ERCOT | Current status |
| Titus Sienta Solar | Pecos | Solar | 502 | 2023-10-13 | Facility Study | ERCOT | Current status |
| Freedom Falcon BESS | Zapata | Battery | 502 | 2023-06-28 | Facility Study | ERCOT | Current status |
| Millsing BESS | Grimes | Battery | 502 | 2024-02-27 | Facility Study | ERCOT | Current status |
| ERAS-2025-021 | Hale | Wind | 500 | 2025-10-02 | In Progress (unknown study) | SPS | Current status |
| GEN-2024-266 | Potter | Solar+Battery | 500 | 2025-03-01 | System Impact Study | SPS | Current status |
| Juno 3 Solar | Borden | Solar | 500 | 2025-03-24 | IA Executed | ERCOT | Current status |
| Betel Storage I | Milam | Battery | 500 | 2025-01-28 | Facility Study | ERCOT | Current status |
| Betel Storage II | Milam | Battery | 500 | 2025-01-28 | Facility Study | ERCOT | Current status |
| Aquila Solar | Milam | Solar | 500 | 2025-11-18 | Facility Study | ERCOT | Current status |
| Lyra Storage | Borden | Solar+Battery | 500 | 2025-05-27 | IA Executed | ERCOT | Current status |
| Lyra Solar | Borden | Solar+Battery | 500 | 2025-03-24 | IA Executed | ERCOT | Current status |
| Draco Solar | Borden | Solar | 500 | 2025-04-21 | Facility Study | ERCOT | Current status |
| Antila Solar | Borden | Solar | 500 | 2025-04-21 | IA Executed | ERCOT | Current status |
| Elk Ridge Solar | Pecos | Solar | 500 | 2025-11-05 | Facility Study | ERCOT | Current status |
| MRR Solar | Pecos | Solar | 500 | 2025-07-29 | Facility Study | ERCOT | Current status |
| Black Mountain Somervell Gas Combined | Somervell | Gas | 495 | 2025-04-21 | Facility Study | ERCOT | Current status |
| Siete | Webb | Wind | 493 | 2018-10-23 | IA Executed | ERCOT | Current status |
| Siete Wind | Webb | Wind | 493 | 2025-07-07 | Facility Study | ERCOT | Current status |
| North Royal Thermal (TEF- Due Diligence) | Lamar | Gas | 479 | 2024-06-13 | Facility Study | ERCOT | Current status |
| Mirando Valley Wind | Jim Hogg | Wind | 479 | 2024-08-16 | Facility Study | ERCOT | Current status |
| E0032 | San Jacinto | Gas | 478 | 2025-08-06 | In Progress (unknown study) | Entergy Texas, Inc. | Current status |
| Alkali Creek Wind | Fisher | Wind | 474 | 2025-08-18 | Facility Study | ERCOT | Current status |
| Serenity Wind | Armstrong | Wind | 473 | 2025-03-24 | Facility Study | ERCOT | Current status |
| GEN-2024-343 | Harrison | Gas | 471 | 2025-03-01 | System Impact Study | AEP | Current status |
| Gregory Power Development SLF | San Patricio | Gas | 470 | 2024-11-19 | Facility Study | ERCOT | Current status |
| Baker Branch Solar | Lamar | Solar | 469 | 2020-03-26 | IA Executed | ERCOT | Current status |
| Hollow Branch Creek Solar | Leon | Solar+Battery | 460 | 2022-09-02 | IA Executed | ERCOT | Current status |
| Hollow Branch Creek Storage | Leon | Solar+Battery | 460 | 2022-09-02 | Facility Study | ERCOT | Current status |
| NRG THW GT 345 (TEF) | Harris | Gas | 456 | 2022-11-17 | IA Executed | ERCOT | Current status |
| TRIFECTA Gas | Midland | Gas | 453 | 2023-06-28 | Facility Study | ERCOT | Current status |
| Salt-Lick Solar | Culberson | Solar+Battery | 453 | 2023-10-13 | Facility Study | ERCOT | Current status |
| Soleil Solar | Clay | Solar | 452 | 2022-09-02 | IA Executed | ERCOT | Current status |
| Zeissel Solar | Knox | Solar | 452 | 2022-02-28 | IA Executed | ERCOT | Current status |
| Cedar Draw Solar | Scurry | Solar+Battery | 451 | 2024-03-22 | Facility Study | ERCOT | Current status |
| Calpine Guadalupe Peakers | Guadalupe | Gas | 450 | 2021-11-15 | Facility Study | ERCOT | Current status |
| Big Watt Power Austin-1 | Caldwell | Gas | 449 | 2025-10-03 | Facility Study | ERCOT | Current status |
| Zeus Spade BESS | Mitchell | Wind+Battery | 446 | 2024-03-29 | Facility Study | ERCOT | Current status |
| Cold Creek Solar 2 | Schleicher | Solar+Battery | 445 | 2023-12-18 | IA Executed | ERCOT | Current status |
| Aurelius 2 Solar | Deaf Smith | Solar | 445 | 2023-12-04 | Facility Study | ERCOT | Current status |
| Aurelius 3 Solar | Deaf Smith | Solar | 445 | 2023-12-04 | Facility Study | ERCOT | Current status |
| NRG Greens Bayou 6 (TEF-Due Diligence) | Harris | Gas | 445 | 2022-08-16 | IA Executed | ERCOT | Current status |
| Vast Sands Power I (TEF -Due Diligence) | Ward | Gas | 440 | 2024-07-22 | IA Executed | ERCOT | Current status |
| Vast Sands Power II (TEF-Due Diligence) | Ward | Gas | 440 | 2024-07-22 | IA Executed | ERCOT | Current status |
| Panhandle Flagship Solar 1 | Carson | Solar+Battery | 439 | 2023-03-13 | IA Executed | ERCOT | Current status |
| Buffalo Creek | Fort Bend | Solar | 439 | 2019-08-01 | IA Executed | ERCOT | Current status |
| Poco Trail Solar | Wilbarger | Solar | 439 | 2021-09-14 | Facility Study | ERCOT | Current status |
| Magnet Storage | Borden | Solar+Battery | 427 | 2025-07-29 | Facility Study | ERCOT | Current status |
| Windecker | Upton | Wind | 420 | 2024-03-29 | Facility Study | ERCOT | Current status |
| Whitehorse Wind | Fisher | Wind | 419 | 2017-06-23 | IA Executed | ERCOT | Current status |
| GAMAY ENERGY STORAGE | Brazoria | Battery | 419 | 2024-02-07 | IA Executed | ERCOT | Current status |
| Sequoia II Solar | Callahan | Solar | 417 | 2020-01-22 | IA Executed | ERCOT | Current status |
| Bypass BESS II | Fort Bend | Battery | 416 | 2024-11-19 | Facility Study | ERCOT | Current status |
| Star Of Texas Solar | Pecos | Solar | 415 | 2025-08-18 | Facility Study | ERCOT | Current status |
| BRP Artemis BESS | Grimes | Battery | 411 | 2021-12-20 | Facility Study | ERCOT | Current status |
| Dragan Solar | Comanche | Solar+Battery | 411 | 2019-11-11 | Facility Study | ERCOT | Current status |
| BRP Snowdon BESS | Briscoe | Battery | 411 | 2021-09-15 | Facility Study | ERCOT | Current status |
| Western Flats Storage | Crane | Solar+Battery | 411 | 2024-04-09 | Facility Study | ERCOT | Current status |
| Western Flats Solar | Crane | Solar+Battery | 410 | 2023-04-07 | Facility Study | ERCOT | Current status |
| Silverton Solar | Briscoe | Solar | 410 | 2023-12-04 | Facility Study | ERCOT | Current status |
| BRP Mekong BESS | Robertson | Battery | 410 | 2021-12-20 | Facility Study | ERCOT | Current status |
| Operation Sunshine Storage | Concho | Solar+Battery | 410 | 2024-02-02 | IA Executed | ERCOT | Current status |
| Wilson BESS | Wilson | Battery | 410 | 2025-04-21 | Facility Study | ERCOT | Current status |
| McCamey's Castle Battery | Upton | Battery | 410 | 2023-10-13 | IA Executed | ERCOT | Current status |
| Beacon Storage | Harris | Battery | 409 | 2021-05-05 | Facility Study | ERCOT | Current status |
| Sigma Storage | Harris | Battery | 408 | 2021-05-11 | Facility Study | ERCOT | Current status |
| Dragan Storage | Comanche | Solar+Battery | 408 | 2020-08-21 | Facility Study | ERCOT | Current status |
| Grasshopper Solar | Haskell | Solar | 408 | 2021-09-28 | Facility Study | ERCOT | Current status |
| LUND STORAGE CENTER 1 | Bastrop | Battery | 408 | 2023-01-17 | Facility Study | ERCOT | Current status |
| 18-BRAVO BESS | Hunt | Battery | 407 | 2025-04-01 | Facility Study | ERCOT | Current status |
| Caliche Mound Solar | Deaf Smith | Solar | 407 | 2020-07-24 | IA Executed | ERCOT | Current status |
| Claire BESS | Harris | Battery | 406 | 2023-02-09 | Facility Study | ERCOT | Current status |
| Compadre Solar | Hill | Solar | 406 | 2021-03-16 | IA Executed | ERCOT | Current status |
| Two Step Solar | Ellis | Solar | 405 | 2025-12-17 | Facility Study | ERCOT | Current status |
| Big Rooter West Solar | Robertson | Solar+Battery | 403 | 2024-03-22 | IA Executed | ERCOT | Current status |
| Hittson Creek Solar | Callahan | Solar+Battery | 403 | 2024-12-19 | Facility Study | ERCOT | Current status |
| Solarville Solar SLF | Kaufman | Solar+Battery | 403 | 2024-05-20 | Facility Study | ERCOT | Current status |
| Bernice Energy Storage | Bexar | Battery | 403 | 2024-09-04 | Facility Study | ERCOT | Current status |
| Bluefox Solar 1 | Matagorda | Solar | 403 | 2024-03-22 | Facility Study | ERCOT | Current status |
| Merope BESS | Comanche | Battery | 402 | 2021-12-20 | Facility Study | ERCOT | Current status |
| Smith Lake Solar DC | Grimes | Solar+Battery | 402 | 2022-02-07 | Facility Study | ERCOT | Current status |
| Iron Belt Energy Storage | Borden | Battery | 402 | 2023-01-03 | IA Executed | ERCOT | Current status |
| Bluefox Solar 2 | Matagorda | Solar | 402 | 2024-03-22 | Facility Study | ERCOT | Current status |
| Bottom Grass Solar II | Colorado | Solar+Battery | 402 | 2022-11-07 | Facility Study | ERCOT | Current status |
| Infinium Solar | Howard | Solar | 402 | 2024-08-16 | Facility Study | ERCOT | Current status |
| CORRUSCANT BESS | Dickens | Battery | 401 | 2024-02-27 | Facility Study | ERCOT | Current status |
| Dorado Solar | Callahan | Solar | 401 | 2020-01-09 | IA Executed | ERCOT | Current status |
| GEN-2024-109 | Bailey | Wind | 401 | 2025-03-01 | System Impact Study | SPS | Current status |
| GEN-2021-090 | Yoakum | Solar+Battery | 400 | 2021-04-30 | Facility Study | SPS | Current status |
| Vaquero 1 Wind | Zapata | Wind | 400 | 2016-04-01 | Facility Study | ERCOT | Current status |
| Boling Generation (TEF-Due Diligience) | Wharton | Gas | 400 | 2023-12-04 | Facility Study | ERCOT | Current status |
| Exergy Energy West Texas Natural Gas Reciprocating Power I | Reeves | Gas | 400 | 2025-07-22 | Facility Study | ERCOT | Current status |
| Biggs Solar | Mcculloch | Solar+Battery | 400 | 2024-07-22 | Facility Study | ERCOT | Current status |
| Gridline Solar | Crockett | Solar | 400 | 2025-08-18 | Facility Study | ERCOT | Current status |
| Springfield Solar | Pecos | Solar | 400 | 2025-09-09 | Facility Study | ERCOT | Current status |
| Hanson Solar | Coleman | Solar | 399 | 2020-10-23 | IA Executed | ERCOT | Current status |
| Charger Solar | Refugio | Solar | 397 | 2020-06-19 | IA Executed | ERCOT | Current status |
| Bug Tussle Wind Project | Lamar | Wind | 397 | 2022-01-13 | IA Executed | ERCOT | Current status |
| ERAS-2025-028 | Hockley | Solar | 384 | 2025-10-02 | In Progress (unknown study) | SPS | Current status |
| Moon Chapel Wind | Tom Green | Wind | 379 | 2025-02-14 | Facility Study | ERCOT | Current status |
| Paint Rock Wind | Concho | Wind | 379 | 2024-01-03 | Facility Study | ERCOT | Current status |
| Panhandle Flagship Storage | Carson | Solar+Battery | 372 | 2023-03-13 | IA Executed | ERCOT | Current status |
| Kilby1 Part 1 Small Block Simple Cycle | Reeves | Gas | 371 | 2025-10-21 | Facility Study | ERCOT | Current status |
| Earthwise Solar | Hardeman | Solar | 371 | 2022-03-14 | Facility Study | ERCOT | Current status |
| Skyrider Wind | Pecos | Wind | 370 | 2024-11-19 | Facility Study | ERCOT | Current status |
| Viento Bravo Wind | Jim Hogg | Wind | 367 | 2025-10-03 | Facility Study | ERCOT | Current status |
| Space City Solar | Wharton | Solar | 366 | 2019-11-01 | IA Executed | ERCOT | Current status |
| SCOTT CROSSING SOLAR SLF | Haskell | Solar+Battery | 364 | 2023-03-27 | Facility Study | ERCOT | Current status |
| Aldrin 345 BESS | Brazoria | Battery | 362 | 2023-05-15 | IA Executed | ERCOT | Current status |
| Wildflower Storage | Navarro | Battery | 359 | 2025-06-05 | Facility Study | ERCOT | Current status |
| Tetris Solar | Zapata | Solar | 359 | 2023-07-28 | Facility Study | ERCOT | Current status |
| Twinwood Solar 1 | Waller | Solar | 358 | 2024-03-22 | Facility Study | ERCOT | Current status |
| Green Ocelot Solar | Kenedy | Solar+Battery | 357 | 2025-01-28 | Facility Study | ERCOT | Current status |
| TORMES SOLAR | Navarro | Solar | 357 | 2020-10-23 | IA Executed | ERCOT | Current status |
| Longview Wind | Dawson | Wind | 353 | 2025-09-22 | IA Executed | ERCOT | Current status |
| Max 4 Wind | Haskell | Wind | 353 | 2025-07-29 | Facility Study | ERCOT | Current status |
| GEN-2020-067 | Terry | Wind | 353 | 2020-04-24 | Facility Study | SPS | Current status |
| Chillingham Solar | Bell | Solar | 352 | 2020-08-04 | IA Executed | ERCOT | Current status |
| Lucy Solar | Concho | Solar | 352 | 2023-06-28 | IA Executed | ERCOT | Current status |
| West Munday Wind | Knox | Wind | 352 | 2024-11-19 | IA Executed | ERCOT | Current status |
| Sombrero Solar | Schleicher | Solar | 352 | 2022-03-30 | Facility Study | ERCOT | Current status |
| Rowdy Creek Solar | Lamar | Solar+Battery | 352 | 2022-01-28 | IA Executed | ERCOT | Current status |
| Cottonwood Bayou Solar | Brazoria | Solar | 351 | 2017-09-22 | IA Executed | ERCOT | Current status |
| Fighting Jays Solar | Fort Bend | Solar | 351 | 2019-03-26 | IA Executed | ERCOT | Current status |
| Funston Solar | Jones | Solar | 351 | 2024-02-27 | IA Executed | ERCOT | Current status |
| Brookesmith Storage | Brown | Battery | 351 | 2025-04-01 | Facility Study | ERCOT | Current status |
| GEN-2024-280 | Andrews | Solar+Battery | 350 | 2025-03-01 | System Impact Study | SPS | Current status |
| HyFuels Green Lake Solar | Victoria | Solar | 347 | 2022-09-27 | Facility Study | ERCOT | Current status |
| GEN-2024-045 | Hansford | Solar | 345 | 2024-10-30 | System Impact Study | SPS | Current status |
| GEN-2024-046 | Hansford | Solar | 345 | 2024-10-30 | System Impact Study | SPS | Current status |
| Rabbit Hollow Energy Storage | Mitchell | Battery | 342 | 2024-12-19 | Facility Study | ERCOT | Current status |
| Baird North Wind | Callahan | Wind | 340 | 2018-05-04 | IA Executed | ERCOT | Current status |
| Titus Low Carbon Ventures Solar 1 | San Patricio | Solar | 338 | 2023-10-13 | Facility Study | ERCOT | Current status |
| Briggs Storage | Haskell | Solar+Battery | 336 | 2021-05-31 | IA Executed | ERCOT | Current status |
| Greyhound Solar | Ector | Solar | 335 | 2019-03-28 | IA Executed | ERCOT | Current status |
| Cielo Vista Power Gas Plant | Duval | Gas | 335 | 2025-08-18 | Facility Study | ERCOT | Current status |
| River Boat Power Gas Plant | Mitchell | Gas | 334 | 2025-08-18 | Facility Study | ERCOT | Current status |
| Three Canes Solar SLF | Navarro | Solar | 333 | 2024-07-22 | IA Executed | ERCOT | Current status |
| Mountaineer Solar | Brown | Solar | 332 | 2019-04-16 | Facility Study | ERCOT | Current status |
| Sky Global West Houston | Austin | Gas | 325 | 2024-07-01 | IA Executed | ERCOT | Current status |
| Briggs Solar | Haskell | Solar+Battery | 324 | 2020-08-04 | IA Executed | ERCOT | Current status |
| Solace Storage | Haskell | Solar+Battery | 322 | 2024-03-22 | IA Executed | ERCOT | Current status |
| Quantum Storage | Haskell | Solar+Battery | 322 | 2024-03-22 | IA Executed | ERCOT | Current status |
| Quantum Solar | Haskell | Solar+Battery | 322 | 2018-09-27 | IA Executed | ERCOT | Current status |
| Solace Solar | Haskell | Solar+Battery | 322 | 2020-04-22 | IA Executed | ERCOT | Current status |
| Pecan Prairie North | Leon | Solar | 321 | 2019-09-23 | IA Executed | ERCOT | Current status |
| Myrtle Solar | Brazoria | Solar | 321 | 2017-03-15 | IA Executed | ERCOT | Current status |
| Delilah Solar 2 | Lamar | Solar | 318 | 2018-11-20 | IA Executed | ERCOT | Current status |
| Elio BESS | Brazoria | Battery | 317 | 2022-07-05 | IA Executed | ERCOT | Current status |
| Middlebrook Solar Limited Liability Company | Nacogdoches | Solar+Battery | 316 | 2022-10-18 | IA Executed | ERCOT | Current status |
| White Bright BESS | Grayson | Battery | 314 | 2025-03-21 | Facility Study | ERCOT | Current status |
| Diablo Campo Storage | Goliad | Battery | 314 | 2024-02-07 | Facility Study | ERCOT | Current status |
| Wild Paw Storage | Henderson | Battery | 313 | 2024-05-09 | Facility Study | ERCOT | Current status |
| Barkley Creek Solar | Lampasas | Solar | 312 | 2025-08-26 | Facility Study | ERCOT | Current status |
| Hickerson Solar | Bosque | Solar+Battery | 311 | 2019-05-29 | IA Executed | ERCOT | Current status |
| Bulldog Power (TEF - Due Diligence) | Brazoria | Gas | 311 | 2023-11-14 | Facility Study | ERCOT | Current status |
| Bulldog Power II | Brazoria | Gas | 311 | 2025-12-16 | Facility Study | ERCOT | Current status |
| Cielo Vista Storage | Duval | Solar+Battery | 311 | 2025-04-21 | Facility Study | ERCOT | Current status |
| Royal River BESS | Brazoria | Battery | 311 | 2022-03-30 | Facility Study | ERCOT | Current status |
| Red Egret BESS | Galveston | Battery | 311 | 2022-03-14 | IA Executed | ERCOT | Current status |
| Oak Tree Energy Storage | Lavaca | Battery | 310 | 2023-12-04 | Facility Study | ERCOT | Current status |
| Slager Lake Wind | Reagan | Wind | 310 | 2025-09-09 | Facility Study | ERCOT | Current status |
| Prairie Branch BESS | Montague | Solar+Battery | 310 | 2025-09-09 | Facility Study | ERCOT | Current status |
| Sweetheart BESS | Young | Solar+Battery | 310 | 2025-08-26 | Facility Study | ERCOT | Current status |
| Argenta Solar | Bee | Solar+Battery | 310 | 2022-06-27 | IA Executed | ERCOT | Current status |
| Sunrose Renewable Energy Solar SLF | Austin | Solar+Battery | 310 | 2024-04-09 | Facility Study | ERCOT | Current status |
| Two Forks BESS | Cooke | Battery | 310 | 2022-01-28 | IA Executed | ERCOT | Current status |
| Platinum Storage | Fannin | Battery | 310 | 2021-09-02 | IA Executed | ERCOT | Current status |
| SanPat Solar I | San Patricio | Solar | 309 | 2022-07-18 | IA Executed | ERCOT | Current status |
| Canyon Wind | Scurry | Wind | 309 | 2016-05-09 | IA Executed | ERCOT | Current status |
| Red Hollow Renewable Energy Solar SLF | Archer | Solar+Battery | 309 | 2024-07-01 | Facility Study | ERCOT | Current status |
| Buffalo Prairie Storage | Robertson | Solar+Battery | 308 | 2023-01-03 | Facility Study | ERCOT | Current status |
| Clay County Yang Storage | Clay | Battery | 308 | 2024-12-26 | Facility Study | ERCOT | Current status |
| Larkspur Energy Storage | Upton | Battery | 307 | 2021-08-02 | IA Executed | ERCOT | Current status |
| Mensa BESS | Pecos | Battery | 307 | 2020-06-26 | Facility Study | ERCOT | Current status |
| 18-ALPHA BESS | Cooke | Battery | 307 | 2025-04-21 | Facility Study | ERCOT | Current status |
| Team Ranch Storage | Tarrant | Battery | 307 | 2024-06-13 | Facility Study | ERCOT | Current status |
| Cantaloupe Solar | Reeves | Solar | 307 | 2020-12-22 | IA Executed | ERCOT | Current status |
| Cattle Drive Solar | Crane | Solar | 307 | 2024-06-13 | Facility Study | ERCOT | Current status |
| Cuchillas BESS | Webb | Solar+Battery | 307 | 2023-09-26 | Facility Study | ERCOT | Current status |
| Axtell BESS | Mclennan | Battery | 307 | 2024-10-01 | Facility Study | ERCOT | Current status |
| Laurel Wind Energy Center | Pecos | Wind | 307 | 2023-06-28 | IA Executed | ERCOT | Current status |
| Copperleaf Energy Storage | Wichita | Battery | 307 | 2024-11-19 | Facility Study | ERCOT | Current status |
| Southfork Energy Storage | Kimble | Battery | 306 | 2024-07-22 | Facility Study | ERCOT | Current status |
| Gilleys Energy Storage | Wise | Battery | 306 | 2024-06-03 | Facility Study | ERCOT | Current status |
| O'Bannion Energy Storage | Jack | Battery | 306 | 2024-05-09 | IA Executed | ERCOT | Current status |
| Wooderson Energy Storage | Jack | Battery | 306 | 2024-05-09 | Facility Study | ERCOT | Current status |
| McCrae Energy Storage | Erath | Battery | 306 | 2024-05-20 | IA Executed | ERCOT | Current status |
| Wolf Hollow III | Hood | Gas | 306 | 2023-06-07 | Facility Study | ERCOT | Current status |
| Spur Energy Storage | Wise | Battery | 306 | 2025-02-25 | Facility Study | ERCOT | Current status |
| Blue Skies BESS | Hill | Battery | 306 | 2022-05-10 | IA Executed | ERCOT | Current status |
| Straight Spur Storage | Andrews | Solar+Battery | 306 | 2024-11-19 | Facility Study | ERCOT | Current status |
| Aurora Energy Storage | Lampasas | Battery | 306 | 2025-02-14 | Facility Study | ERCOT | Current status |
| Damia Solar | Eastland | Solar+Battery | 306 | 2025-04-01 | Facility Study | ERCOT | Current status |
| Estrella Dorada Wind | Duval | Wind | 306 | 2025-07-21 | Facility Study | ERCOT | Current status |
| Velveteen Solar II | Baylor | Solar | 306 | 2025-12-23 | Facility Study | ERCOT | Current status |
| Cuchillas Solar | Webb | Solar+Battery | 306 | 2021-06-02 | IA Executed | ERCOT | Current status |
| Glory Bee Solar | Erath | Solar+Battery | 305 | 2022-06-10 | Facility Study | ERCOT | Current status |
| Panhandle Flagship Solar 2 | Hutchinson | Solar+Battery | 304 | 2023-03-13 | IA Executed | ERCOT | Current status |
| Glass Mountain Solar 2 | Pecos | Solar | 304 | 2025-09-22 | Facility Study | ERCOT | Current status |
| Glass Mountain Solar 1 | Pecos | Solar | 304 | 2025-09-22 | Facility Study | ERCOT | Current status |
| Furay Battery Energy Storage System | Harris | Battery | 304 | 2022-09-02 | Facility Study | ERCOT | Current status |
| Glass Mountain Solar Solstice | Pecos | Solar | 304 | 2025-09-22 | Facility Study | ERCOT | Current status |
| Bullring Wind 2 | Starr | Wind | 304 | 2024-05-09 | IA Executed | ERCOT | Current status |
| NavBoot BESS | Nueces | Battery | 304 | 2023-03-13 | IA Executed | ERCOT | Current status |
| Juanita Creek BESS | Matagorda | Battery | 304 | 2025-06-19 | Facility Study | ERCOT | Current status |
| BRP Aras BESS | Upton | Battery | 304 | 2021-05-31 | Facility Study | ERCOT | Current status |
| Wander Waters BESS | Wilbarger | Battery | 304 | 2024-03-22 | Facility Study | ERCOT | Current status |
| Bullring Wind 1 | Starr | Wind | 304 | 2024-05-09 | IA Executed | ERCOT | Current status |
| Goat Mountain Wind-Repower | Sterling | Wind+Battery | 303 | 2025-01-13 | Facility Study | ERCOT | Current status |
| Old Aqueduct Batt | Hale | Solar+Battery | 303 | 2020-05-01 | Facility Study | ERCOT | Current status |
| Prairie Power Wind | Mitchell | Wind | 303 | 2025-06-05 | Facility Study | ERCOT | Current status |
| Live Oak Wind II | Schleicher | Wind | 303 | 2025-03-24 | Facility Study | ERCOT | Current status |
| Priddy Wind | Mills | Wind | 302 | 2015-01-14 | IA Executed | ERCOT | Current status |
| Brantley Branch Batt | Rusk | Battery | 302 | 2020-05-01 | Facility Study | ERCOT | Current status |
| Uva Creek Solar | Borden | Solar | 302 | 2024-02-27 | IA Executed | ERCOT | Current status |
| Spurland Solar I | Dickens | Solar | 302 | 2025-11-05 | Facility Study | ERCOT | Current status |
| Outrider BESS | Dickens | Battery | 302 | 2025-06-05 | Facility Study | ERCOT | Current status |
| Silver Dollar Solar | Freestone | Solar+Battery | 302 | 2024-06-03 | Facility Study | ERCOT | Current status |
| Dry Creek Solar II | Rusk | Solar | 302 | 2025-06-19 | Facility Study | ERCOT | Current status |
| Badger Solar | Upton | Solar+Battery | 302 | 2025-02-12 | Facility Study | ERCOT | Current status |
| BRP Passu BESS | Wilbarger | Battery | 302 | 2020-12-03 | Facility Study | ERCOT | Current status |
| HyFuels Calhoun Solar | Victoria | Solar | 302 | 2022-10-18 | Facility Study | ERCOT | Current status |
| Dairyland Storage | Hopkins | Battery | 302 | 2025-04-21 | Facility Study | ERCOT | Current status |
| Triangle Ranch Alpha | Cottle | Wind | 302 | 2022-10-06 | Facility Study | ERCOT | Current status |
| Whitewright Solar 2 | Grayson | Solar | 302 | 2023-12-18 | Facility Study | ERCOT | Current status |
| Galaxy Solar 2 | Ellis | Solar | 302 | 2025-06-19 | Facility Study | ERCOT | Current status |
| Cazadores Solar | Duval | Solar | 302 | 2025-07-07 | Facility Study | ERCOT | Current status |
| Soluce Bravo Storage | Brown | Solar+Battery | 302 | 2025-01-13 | Facility Study | ERCOT | Current status |
| Sisters Solar | Ector | Solar+Battery | 302 | 2019-02-28 | IA Executed | ERCOT | Current status |
| RIVERBEND SOLAR SLF | Falls | Solar+Battery | 302 | 2023-03-08 | Facility Study | ERCOT | Current status |
| Sunburst Solar | San Patricio | Solar+Battery | 302 | 2024-10-10 | Facility Study | ERCOT | Current status |
| Tapaderos Solar | Young | Solar+Battery | 302 | 2024-11-19 | Facility Study | ERCOT | Current status |
| Winters Glow Solar | Runnels | Solar+Battery | 302 | 2024-10-29 | Facility Study | ERCOT | Current status |
| Simsboro Storage | Freestone | Battery | 302 | 2025-06-11 | Facility Study | ERCOT | Current status |
| Amerada Solar | Freestone | Solar+Battery | 302 | 2023-05-15 | Facility Study | ERCOT | Current status |
| Pine Forest Solar | Hopkins | Solar | 302 | 2018-10-04 | IA Executed | ERCOT | Current status |
| El Sauz Ranch | Willacy | Wind | 302 | 2018-06-19 | IA Executed | ERCOT | Current status |
| Crater BESS | Howard | Battery | 302 | 2020-05-20 | Facility Study | ERCOT | Current status |
| Ciervo Wind | Jim Hogg | Wind | 302 | 2024-12-19 | Facility Study | ERCOT | Current status |
| Quela BESS | Bexar | Battery | 301 | 2020-09-25 | Facility Study | ERCOT | Current status |
| Gulf Gateway Solar One | San Patricio | Solar+Battery | 301 | 2025-04-21 | Facility Study | ERCOT | Current status |
| Gulf Gateway Storage One | San Patricio | Solar+Battery | 301 | 2025-08-26 | Facility Study | ERCOT | Current status |
| Cenizo Solar | Webb | Solar | 301 | 2025-11-24 | Facility Study | ERCOT | Current status |
| Rubicon Power BESS | Brazoria | Battery | 301 | 2023-11-14 | Facility Study | ERCOT | Current status |
| Themisto Solar | Nolan | Solar | 301 | 2024-02-26 | Facility Study | ERCOT | Current status |
| Palomino Solar | Hopkins | Solar+Battery | 301 | 2024-10-18 | Facility Study | ERCOT | Current status |
| Seine BESS | Foard | Battery | 301 | 2020-12-03 | IA Executed | ERCOT | Current status |
| Cernan BESS | Wharton | Battery | 301 | 2025-02-14 | Facility Study | ERCOT | Current status |
| Prairie Branch Solar | Montague | Solar+Battery | 301 | 2025-09-09 | Facility Study | ERCOT | Current status |
| Sweetheart Solar | Young | Solar+Battery | 301 | 2025-08-26 | Facility Study | ERCOT | Current status |
| Horseshoe Bend Solar | Brown | Solar | 301 | 2017-06-23 | Facility Study | ERCOT | Current status |
| Acker BESS | Castro | Battery | 301 | 2023-06-07 | IA Executed | ERCOT | Current status |
| Apricot Sun Storage | Duval | Solar+Battery | 301 | 2025-04-01 | Facility Study | ERCOT | Current status |
| Blue Spring Solar | Haskell | Solar | 301 | 2025-10-03 | Facility Study | ERCOT | Current status |
| Sundance Solar | Knox | Solar | 301 | 2025-04-21 | Facility Study | ERCOT | Current status |
| Great Rock BESS | Leon | Battery | 301 | 2022-11-07 | IA Executed | ERCOT | Current status |
| Barranca Wind 1 | Jim Hogg | Wind | 301 | 2025-07-29 | Facility Study | ERCOT | Current status |
| Jaguar Solar | Mclennan | Solar+Battery | 301 | 2021-03-18 | IA Executed | ERCOT | Current status |
| J3045 | Orange | Solar | 300 | 2022-09-14 | Cluster Study | ENTERGY TEXAS, INC. | Current status |
| GEN-2017-151 | Crosby | Wind | 300 | 2017-11-28 | IA Executed | SPS | Current status |
| GEN-2017-239 | Yoakum | Solar | 300 | 2017-11-30 | IA Executed | SPS | Current status |
| GEN-2018-099 | Parmer | Wind | 300 | 2018-11-21 | IA Executed | SPS | Current status |
| GEN-2022-139 | Harrison | Battery | 300 | 2023-02-21 | Facility Study | AEP | Current status |
| GEN-2024-025 | Bowie | Solar | 300 | 2024-10-30 | System Impact Study | AEP | Current status |
| GEN-2024-050 | Castro | Solar+Battery | 300 | 2024-10-30 | System Impact Study | SPS | Current status |
| GEN-2024-068 | Morris | Solar | 300 | 2024-10-30 | System Impact Study | AEP | Current status |
| GEN-2024-077 | Hutchinson | Solar | 300 | 2024-10-30 | System Impact Study | SPS | Current status |
| GEN-2024-078 | Hutchinson | Solar | 300 | 2024-10-30 | System Impact Study | SPS | Current status |
| GEN-2024-099 | Castro | Solar | 300 | 2025-03-01 | System Impact Study | SPS | Current status |
| GEN-2024-230 | Wilbarger | Battery | 300 | 2025-03-01 | System Impact Study | AEP | Current status |
| GEN-2024-317 | Cottle | Solar | 300 | 2025-03-01 | System Impact Study | SPS | Current status |
| GEN-2024-336 | Yoakum | Solar+Battery | 300 | 2025-03-01 | System Impact Study | SPS | Current status |
| GEN-2024-364 | Randall | Solar+Battery | 300 | 2025-03-01 | System Impact Study | SPS | Current status |
| GEN-2024-SR15 | Yoakum | Battery | 300 | 2024-10-24 | IA Pending | SPS | Current status |
| GEN-2025-GR6 | Dimmit | Wind | 300 | 2025-11-07 | In Progress (unknown study) | SPS | Current status |
| Delilah Solar 1 | Lamar | Solar | 300 | 2018-11-20 | IA Executed | ERCOT | Current status |
| Pachanga Wind | Cameron | Wind | 300 | 2021-02-09 | Facility Study | ERCOT | Current status |
| Photo Solar 2 | Uvalde | Solar+Battery | 300 | 2022-09-15 | Facility Study | ERCOT | Current status |
| Mandolin Solar SLF | Starr | Solar+Battery | 300 | 2024-07-22 | Facility Study | ERCOT | Current status |
| Gardner Draw Solar | Glasscock | Solar | 300 | 2024-10-01 | IA Executed | ERCOT | Current status |
| Peach Creek Solar | Wharton | Solar | 300 | 2024-12-19 | Facility Study | ERCOT | Current status |
| Bendito Wind | Webb | Wind | 300 | 2025-07-29 | Facility Study | ERCOT | Current status |
| Selenite Springs Solar | Pecos | Solar | 300 | 2025-04-21 | Facility Study | ERCOT | Current status |
| Wisdom Solar SLF | Pecos | Solar+Battery | 299 | 2025-02-12 | Facility Study | ERCOT | Current status |
| Board Creek Wind | Navarro | Wind | 299 | 2019-04-24 | IA Executed | ERCOT | Current status |
| Barranca Wind 2 | Jim Hogg | Wind | 299 | 2025-07-29 | Facility Study | ERCOT | Current status |
| Camino Ranch Storage SLF | Houston | Solar+Battery | 298 | 2022-10-18 | Facility Study | ERCOT | Current status |
| GEN-2020-054 | Bowie | Solar | 298 | 2020-04-27 | IA Executed | AEP | Current status |
| Palo Verde Wind | San Patricio | Wind+Battery | 298 | 2024-04-09 | Facility Study | ERCOT | Current status |
| Aquilla Lake 3 Wind | Hill | Wind | 297 | 2021-03-08 | IA Executed | ERCOT | Current status |
| Prairie Hill Wind | Mclennan | Wind | 297 | 2017-06-19 | IA Executed | ERCOT | Current status |
| Camino Ranch Solar SLF | Houston | Solar+Battery | 296 | 2022-10-06 | Facility Study | ERCOT | Current status |
| Fortuna Wind | Jack | Wind | 295 | 2020-03-06 | IA Executed | ERCOT | Current status |
| Columbine Wind | Gonzales | Wind | 295 | 2025-02-25 | Facility Study | ERCOT | Current status |
| Sanders Hollow Energy Center | Dickens | Wind | 293 | 2024-10-29 | Facility Study | ERCOT | Current status |
| Windjammer Windpower | Glasscock | Wind | 293 | 2024-09-10 | IA Executed | ERCOT | Current status |
| Grapefruit Solar | Hidalgo | Solar | 291 | 2024-02-27 | IA Executed | ERCOT | Current status |
| Vista Bluff Wind I "Alternate POI" | Upton | Wind | 290 | 2025-09-22 | Facility Study | ERCOT | Current status |
| Vista Bluff Wind II "Alternate POI" | Upton | Wind | 290 | 2025-09-22 | Facility Study | ERCOT | Current status |
| Tres Rios Ranch BESS | Upton | Solar+Battery | 290 | 2023-05-26 | Facility Study | ERCOT | Current status |
| J3902 | Jefferson | Wind | 289 | 2025-02-06 | ENTERGY TEXAS, INC. | Current status | |
| Baker Branch BESS | Lamar | Battery | 287 | 2025-06-19 | Facility Study | ERCOT | Current status |
| Sandow Solar | Milam | Solar | 287 | 2020-09-11 | Facility Study | ERCOT | Current status |
| Inadale BESS | Scurry | Solar+Battery | 287 | 2023-02-20 | Facility Study | ERCOT | Current status |
| Spindletop Solar | Nacogdoches | Solar+Battery | 286 | 2024-07-30 | IA Executed | ERCOT | Current status |
| Fierce River BESS | Starr | Solar+Battery | 284 | 2024-03-22 | Facility Study | ERCOT | Current status |
| Monarch Creek Wind | Throckmorton | Wind | 284 | 2019-04-25 | IA Executed | ERCOT | Current status |
| Fivemile Wind | Dawson | Wind | 282 | 2025-04-25 | Facility Study | ERCOT | Current status |
| Impala Flats Wind | Lynn | Wind | 282 | 2019-01-11 | Facility Study | ERCOT | Current status |
| Treehouse Solar | Grimes | Solar+Battery | 282 | 2025-07-29 | Facility Study | ERCOT | Current status |
| Piedra Solar | Freestone | Solar+Battery | 282 | 2022-09-02 | IA Executed | ERCOT | Current status |
| Inadale Solar | Scurry | Solar+Battery | 281 | 2023-02-20 | Facility Study | ERCOT | Current status |
| Jukebox Solar | Frio | Solar | 281 | 2025-06-19 | Facility Study | ERCOT | Current status |
| GEN-2024-015 | Yoakum | Solar+Battery | 280 | 2024-10-04 | System Impact Study | SPS | Current status |
| UNICORN BESS | Fort Bend | Battery | 279 | 2024-01-11 | Facility Study | ERCOT | Current status |
| Crossroads Wind | Victoria | Wind | 277 | 2022-09-27 | IA Executed | ERCOT | Current status |
| Pease River Solar | Foard | Solar | 276 | 2025-12-02 | Facility Study | ERCOT | Current status |
| Roboman Solar | Coke | Solar | 273 | 2025-07-07 | Facility Study | ERCOT | Current status |
| Blevins Solar | Falls | Solar | 272 | 2021-02-04 | IA Executed | ERCOT | Current status |
| J3986 | Liberty | Solar | 270 | 2024-10-25 | MISO | Current status | |
| Foxtrot Wind | Bee | Wind | 268 | 2018-07-26 | IA Executed | ERCOT | Current status |
| Big Sampson Wind | Crockett | Wind | 265 | 2015-05-11 | IA Executed | ERCOT | Current status |
| OCI SunRoper | Wharton | Solar | 265 | 2021-11-24 | IA Executed | ERCOT | Current status |
| GEN-2017-158 | Parmer | Wind | 265 | 2017-11-29 | IA Executed | SPS | Current status |
| Santa Garcias Solar | Kleberg | Solar | 265 | 2023-06-28 | Facility Study | ERCOT | Current status |
| Leopard BESS | Victoria | Battery | 264 | 2024-05-09 | IA Executed | ERCOT | Current status |
| Possum Kingdom Solar | Jack | Solar+Battery | 262 | 2021-09-13 | Facility Study | ERCOT | Current status |
| Yellow Cat Wind | Navarro | Wind | 262 | 2021-08-17 | IA Executed | ERCOT | Current status |
| Charolais Solar | Matagorda | Solar+Battery | 262 | 2019-08-05 | Facility Study | ERCOT | Current status |
| Miranda Solar Project | Mcmullen | Solar | 261 | 2021-11-03 | IA Executed | ERCOT | Current status |
| Velociraptor BESS II | Ector | Solar+Battery | 261 | 2025-05-27 | Facility Study | ERCOT | Current status |
| Dundee East B Wind | Baylor | Wind | 261 | 2023-01-17 | IA Executed | ERCOT | Current status |
| Sypert Branch Solar Project | Milam | Solar | 261 | 2021-09-21 | IA Executed | ERCOT | Current status |
| Velociraptor BESS I | Ector | Solar+Battery | 261 | 2025-05-27 | Facility Study | ERCOT | Current status |
| Verily Solar (FKA Cuello De Cuero Solar) | Brooks | Solar | 261 | 2024-03-22 | Facility Study | ERCOT | Current status |
| Panhandle Flagship Solar 3 | Hutchinson | Solar+Battery | 260 | 2023-03-13 | IA Executed | ERCOT | Current status |
| Homestead Power (TEF-Due Diligence) | Austin | Gas | 260 | 2024-07-30 | Facility Study | ERCOT | Current status |
| Ochoa Energy Storage | Waller | Battery | 260 | 2023-04-19 | Facility Study | ERCOT | Current status |
| Red Holly Solar | Dawson | Solar+Battery | 260 | 2018-07-11 | IA Executed | ERCOT | Current status |
| Jay Flat BESS | Kent | Battery | 259 | 2025-01-28 | Facility Study | ERCOT | Current status |
| Goodnight Wind II | Armstrong | Wind | 259 | 2023-04-19 | IA Executed | ERCOT | Current status |
| Mystic Springs Renewable Energy Solar SLF | Kaufman | Solar+Battery | 259 | 2022-05-10 | IA Executed | ERCOT | Current status |
| Horsepower BESS | Bexar | Battery | 258 | 2025-12-17 | Facility Study | ERCOT | Current status |
| First Capitol BESS | Brazoria | Battery | 257 | 2023-10-04 | IA Executed | ERCOT | Current status |
| Drake BESS | Collin | Battery | 257 | 2022-06-02 | IA Executed | ERCOT | Current status |
| Masava Storage | Madison | Battery | 257 | 2022-09-02 | Facility Study | ERCOT | Current status |
| Saddlehorn Energy Storage | Austin | Battery | 257 | 2024-11-26 | Facility Study | ERCOT | Current status |
| Shepard Energy Storage | Galveston | Battery | 257 | 2022-12-15 | IA Executed | ERCOT | Current status |
| Van Zandt Energy Storage | Ector | Battery | 257 | 2023-06-07 | Facility Study | ERCOT | Current status |
| Alila Solar | San Patricio | Solar+Battery | 257 | 2020-10-07 | IA Executed | ERCOT | Current status |
| Rex Storage | Harris | Battery | 256 | 2024-06-13 | Facility Study | ERCOT | Current status |
| Bell County Morgan Storage | Bell | Battery | 256 | 2024-11-19 | Facility Study | ERCOT | Current status |
| Hastings Park BESS | Brazoria | Battery | 256 | 2024-08-16 | IA Executed | ERCOT | Current status |
| Sunburst BESS | San Patricio | Solar+Battery | 256 | 2024-10-10 | Facility Study | ERCOT | Current status |
| Nautilus Heavy Storage | San Patricio | Battery | 256 | 2023-12-20 | Facility Study | ERCOT | Current status |
| SanPat Solar II | San Patricio | Solar | 256 | 2022-02-28 | IA Executed | ERCOT | Current status |
| Tulsita Solar | Goliad | Solar | 256 | 2018-12-05 | IA Executed | ERCOT | Current status |
| Maleza Storage II | Wharton | Battery | 256 | 2024-02-27 | Facility Study | ERCOT | Current status |
| Champs Elysees BESS | Milam | Battery | 256 | 2024-08-16 | Facility Study | ERCOT | Current status |
| Nouveau BESS | Brown | Battery | 256 | 2024-08-16 | Facility Study | ERCOT | Current status |
| GEN-2024-063 | Lamb | Solar | 256 | 2024-10-30 | System Impact Study | SPS | Current status |
| Bayou Creek Solar | San Patricio | Solar | 255 | 2024-12-19 | Facility Study | ERCOT | Current status |
| Zeya BESS | Galveston | Battery | 255 | 2021-05-31 | IA Executed | ERCOT | Current status |
| Sierra Madre Solar | Zapata | Solar | 255 | 2020-01-22 | Facility Study | ERCOT | Current status |
| San Gabriel Solar | Milam | Solar+Battery | 255 | 2025-01-28 | Facility Study | ERCOT | Current status |
| Maleza Solar | Wharton | Solar+Battery | 255 | 2018-12-06 | IA Executed | ERCOT | Current status |
| Maleza Solar II | Wharton | Solar+Battery | 255 | 2021-04-06 | Facility Study | ERCOT | Current status |
| PowerVault BESS | Mclennan | Battery | 255 | 2024-03-22 | Facility Study | ERCOT | Current status |
| Roseland Solar | Falls | Solar | 254 | 2018-11-30 | IA Executed | ERCOT | Current status |
| Roseland Solar II | Falls | Solar | 254 | 2021-10-05 | IA Executed | ERCOT | Current status |
| Grand Mesa BESS | Pecos | Battery | 253 | 2024-08-16 | Facility Study | ERCOT | Current status |
| Cibeles Solar | Mclennan | Solar | 252 | 2022-05-16 | IA Executed | ERCOT | Current status |
| Tall Saddle Solar | Kenedy | Solar | 252 | 2024-07-01 | Facility Study | ERCOT | Current status |
| GEN-2018-015 | Cottle | Solar | 252 | 2018-04-27 | IA Executed | SPS | Current status |
| Buzios Solar | Motley | Solar+Battery | 252 | 2022-09-15 | IA Executed | ERCOT | Current status |
| Little Ridge Storage | Collin | Battery | 252 | 2023-05-15 | Facility Study | ERCOT | Current status |
| Lazy U Solar 1 | Hardeman | Solar | 252 | 2023-08-21 | Facility Study | ERCOT | Current status |
| Lazy U Solar 2 | Hardeman | Solar | 252 | 2023-08-21 | Facility Study | ERCOT | Current status |
| Eval Storage | Cameron | Battery | 252 | 2020-10-23 | IA Executed | ERCOT | Current status |
| Straight Spur Solar | Andrews | Solar+Battery | 252 | 2024-11-21 | Facility Study | ERCOT | Current status |
| Clairemont Solar 1 | Kent | Solar | 252 | 2025-01-28 | IA Executed | ERCOT | Current status |
| Velociraptor Solar II | Ector | Solar+Battery | 252 | 2025-05-27 | Facility Study | ERCOT | Current status |
| Velociraptor Solar I | Ector | Solar+Battery | 252 | 2019-05-14 | Facility Study | ERCOT | Current status |
| Ogalalla Storage | Castro | Battery | 252 | 2024-01-03 | Facility Study | ERCOT | Current status |
| Cowboy Power Gas Plant | San Patricio | Gas | 252 | 2025-08-18 | Facility Study | ERCOT | Current status |
| Juniper Ridge BESS 1 | Hardeman | Battery | 252 | 2023-09-08 | Facility Study | ERCOT | Current status |
| Juniper Ridge BESS 2 | Hardeman | Battery | 252 | 2023-08-21 | Facility Study | ERCOT | Current status |
| Paint Brush PV1 | Coleman | Solar | 252 | 2025-12-02 | Facility Study | ERCOT | Current status |
| Paint Brush PV2 | Coleman | Solar | 252 | 2025-12-02 | Facility Study | ERCOT | Current status |
| Paint Brush PV3 | Coleman | Solar | 252 | 2025-12-02 | Facility Study | ERCOT | Current status |
| Paint Brush PV4 | Coleman | Solar | 252 | 2025-12-02 | Facility Study | ERCOT | Current status |
| Buffalo Creek BESS | Fort Bend | Battery | 251 | 2024-03-22 | IA Executed | ERCOT | Current status |
| Sugaree Solar | Maverick | Solar | 251 | 2024-10-10 | IA Executed | ERCOT | Current status |
| Black Hawk Solar | Duval | Solar | 251 | 2024-02-27 | Facility Study | ERCOT | Current status |
| Mesa View Storage | Upton | Battery | 251 | 2023-04-19 | Facility Study | ERCOT | Current status |
| Wake Wind Energy | Crosby | Wind | 251 | 2025-04-21 | Facility Study | ERCOT | Current status |
| Althea Storage | Maverick | Battery | 251 | 2025-02-12 | IA Executed | ERCOT | Current status |
| Brela BESS LLC | Wharton | Battery | 251 | 2024-01-11 | Facility Study | ERCOT | Current status |
| Oak Valley Solar | Navarro | Solar | 251 | 2025-04-01 | Facility Study | ERCOT | Current status |
| Clutch City Solar Phase II | Brazoria | Solar | 251 | 2023-02-20 | IA Executed | ERCOT | Current status |
| Buffalo Meadow Solar | Robertson | Solar+Battery | 251 | 2023-02-27 | Facility Study | ERCOT | Current status |
| Fort Concho Energy storage | Tom Green | Battery | 251 | 2023-01-30 | Facility Study | ERCOT | Current status |
| Rock Creek BESS | Kendall | Battery | 251 | 2024-02-27 | IA Executed | ERCOT | Current status |
| Bluegill BESS | Harris | Battery | 251 | 2023-06-28 | Facility Study | ERCOT | Current status |
| Senator Aggreko Solar | Maverick | Solar+Battery | 251 | 2024-02-02 | Facility Study | ERCOT | Current status |
| Skeeter Solar | Jones | Solar | 251 | 2024-06-03 | Facility Study | ERCOT | Current status |
| Tanglewood Solar | Brazoria | Solar | 251 | 2020-07-10 | IA Executed | ERCOT | Current status |
| Parula Energy Center | Austin | Battery | 251 | 2024-05-20 | Facility Study | ERCOT | Current status |
| Tiger Solar | Jones | Solar | 251 | 2021-04-29 | IA Executed | ERCOT | Current status |
| Adamstown Solar | Wichita | Solar | 251 | 2018-11-20 | IA Executed | ERCOT | Current status |
| Alkali Creek Wind 2 | Fisher | Wind | 250 | 2025-12-17 | Facility Study | ERCOT | Current status |
| Sf250SB | Hudspeth | Solar+Battery | 250 | 2023-09-29 | IA Executed | El Paso Electric Company | Current status |
| Ca-CO-250B | El Paso | Battery | 250 | 2025-06-05 | In Progress (unknown study) | El Paso Electric Company | Current status |
| ERAS-2025-027 | Yoakum | Battery | 250 | 2025-10-02 | In Progress (unknown study) | SPS | Current status |
| GEN-2024-041 | Floyd | Wind | 250 | 2024-10-30 | System Impact Study | SPS | Current status |
| GEN-2024-042 | Floyd | Wind | 250 | 2024-10-30 | System Impact Study | SPS | Current status |
| GEN-2024-143 | Dallam | Wind | 250 | 2025-03-01 | System Impact Study | SPS | Current status |
| GEN-2024-145 | Dallam | Wind | 250 | 2025-03-01 | System Impact Study | SPS | Current status |
| GEN-2024-153 | Randall | Solar | 250 | 2025-03-01 | System Impact Study | SPS | Current status |
| GEN-2024-232 | Houston | Solar | 250 | 2025-03-01 | System Impact Study | AEP | Current status |
| GEN-2024-368 | Gray | Battery | 250 | 2025-03-01 | System Impact Study | SPS | Current status |
| Samson Solar 1 | Lamar | Solar | 250 | 2018-11-20 | IA Executed | ERCOT | Current status |
| Samson Solar 3 | Lamar | Solar | 250 | 2020-01-13 | IA Executed | ERCOT | Current status |
| August Draw Solar | Reeves | Solar | 250 | 2022-09-15 | IA Executed | ERCOT | Current status |
| Straight Spur Wind | Andrews | Wind | 247 | 2024-12-19 | Facility Study | ERCOT | Current status |
| Bluewind BESS | Atascosa | Battery | 247 | 2025-04-25 | Facility Study | ERCOT | Current status |
| Hill Valley BESS | Grimes | Battery | 246 | 2023-12-04 | Facility Study | ERCOT | Current status |
| Misty Hollow BESS | Grimes | Battery | 246 | 2023-12-20 | IA Executed | ERCOT | Current status |
| Mojo BESS | Wilson | Solar+Battery | 246 | 2025-04-25 | Facility Study | ERCOT | Current status |
| Apricot Sun Solar | Duval | Solar+Battery | 246 | 2025-04-01 | Facility Study | ERCOT | Current status |
| Dempsey Solar SLF | Leon | Solar+Battery | 245 | 2025-02-25 | Facility Study | ERCOT | Current status |
| Eastbell Milam Solar | Milam | Solar | 245 | 2018-10-10 | IA Executed | ERCOT | Current status |
| Gail Mountain Solar | Borden | Solar | 244 | 2024-10-29 | Facility Study | ERCOT | Current status |
| Lavaca Bay Solar | Matagorda | Solar | 243 | 2020-09-11 | IA Executed | ERCOT | Current status |
| Brazos Bend Solar SLF | Milam | Solar+Battery | 243 | 2025-09-11 | Facility Study | ERCOT | Current status |
| Brazos Bend Storage SLF | Milam | Solar+Battery | 243 | 2025-09-11 | Facility Study | ERCOT | Current status |
| Coyote Wind | Scurry | Wind | 243 | 2015-04-22 | IA Executed | ERCOT | Current status |
| Lupinus Solar 2 | Franklin | Solar+Battery | 242 | 2021-12-13 | IA Executed | ERCOT | Current status |
| Lutum Wind | Clay | Wind | 242 | 2017-09-12 | Facility Study | ERCOT | Current status |
| Diaz BESS | Cameron | Battery | 241 | 2023-05-22 | Facility Study | ERCOT | Current status |
| Peyton Creek Wind II | Matagorda | Wind | 241 | 2018-08-21 | IA Executed | ERCOT | Current status |
| Easy Wind Energy Center | Schleicher | Wind+Battery | 241 | 2024-05-20 | Facility Study | ERCOT | Current status |
| Duffy BESS | Matagorda | Solar+Battery | 241 | 2023-08-21 | IA Executed | ERCOT | Current status |
| Jane Storage Energy Center | Martin | Battery | 241 | 2023-09-08 | Facility Study | ERCOT | Current status |
| J3985 | Polk | Solar+Battery | 240 | 2024-11-18 | MISO | Current status | |
| Giddings Wind | Upton | Wind | 240 | 2017-09-06 | Facility Study | ERCOT | Current status |
| Razorbill Solar | Matagorda | Solar+Battery | 240 | 2020-01-02 | Facility Study | ERCOT | Current status |
| Bob Creek Wind | Sterling | Wind | 240 | 2024-01-11 | IA Executed | ERCOT | Current status |
| Camino Ranch Storage 2 SLF | Houston | Solar+Battery | 238 | 2024-02-02 | Facility Study | ERCOT | Current status |
| Campsey Wind | Jack | Wind | 238 | 2021-02-09 | Facility Study | ERCOT | Current status |
| Bracero Pecan Storage | Reeves | Battery | 238 | 2022-11-07 | IA Executed | ERCOT | Current status |
| Camino Ranch Solar 2 SLF | Houston | Solar+Battery | 237 | 2024-02-27 | Facility Study | ERCOT | Current status |
| DeSpain Solar Project | Kinney | Solar | 236 | 2021-12-05 | Facility Study | ERCOT | Current status |
| PHOTON SOLAR 1 2 SLF | Wharton | Solar | 236 | 2024-09-02 | IA Executed | ERCOT | Current status |
| Kuy Creek Solar 1 SLF | Goliad | Solar+Battery | 235 | 2025-04-21 | Facility Study | ERCOT | Current status |
| Monte Cristo 1 Wind | Hidalgo | Wind | 235 | 2017-04-11 | IA Executed | ERCOT | Current status |
| Monte Cristo II Wind | Hidalgo | Wind | 234 | 2017-04-11 | IA Executed | ERCOT | Current status |
| Sbranch Solar | Wharton | Solar | 234 | 2019-01-03 | IA Executed | ERCOT | Current status |
| ERAS-2025-016 | Lamb | Gas | 233 | 2025-10-02 | In Progress (unknown study) | SPS | Current status |
| Cricket Storage | Henderson | Battery | 232 | 2025-04-04 | Facility Study | ERCOT | Current status |
| Lavender Storage Project | Bexar | Battery | 232 | 2022-02-28 | IA Executed | ERCOT | Current status |
| Adelite Storage | Milam | Battery | 232 | 2022-06-27 | IA Executed | ERCOT | Current status |
| Petunia Storage Project | Milam | Battery | 232 | 2022-03-12 | Facility Study | ERCOT | Current status |
| Taormina Storage | Bexar | Battery | 232 | 2022-04-18 | IA Executed | ERCOT | Current status |
| Larrea Solar | Pecos | Solar | 232 | 2024-01-03 | Facility Study | ERCOT | Current status |
| Allthorn Solar | Duval | Solar+Battery | 232 | 2025-02-14 | Facility Study | ERCOT | Current status |
| Buffalo Gap 2 Wind Repower | Nolan | Wind | 231 | 2024-12-19 | IA Executed | ERCOT | Current status |
| Rio Grand Valley Element Fuels Power | Cameron | Hydrogen | 230 | 2024-06-13 | Facility Study | ERCOT | Current status |
| Pin Peaking Energy Center 1 (TEF- Due Diligence) | Freestone | Gas | 228 | 2023-04-19 | IA Executed | ERCOT | Current status |
| Pin Peaking Energy Center 2 (TEF- Due Diligence) | Freestone | Gas | 228 | 2023-04-19 | IA Executed | ERCOT | Current status |
| GridGuardian BESS | Bell | Battery | 228 | 2023-09-22 | Facility Study | ERCOT | Current status |
| Houston BESS | Harris | Battery | 228 | 2023-04-07 | Facility Study | ERCOT | Current status |
| White Tail Solar | Deaf Smith | Solar | 227 | 2022-02-07 | Facility Study | ERCOT | Current status |
| Dunkel BESS | Lubbock | Battery | 226 | 2022-06-27 | Facility Study | ERCOT | Current status |
| SIM GIDEON GAS RICE | Bastrop | Gas | 226 | 2025-07-29 | Facility Study | ERCOT | Current status |
| Cedar Draw BESS | Scurry | Solar+Battery | 226 | 2024-03-22 | Facility Study | ERCOT | Current status |
| Rubicon Alpha Wind | Haskell | Wind | 226 | 2022-05-10 | IA Executed | ERCOT | Current status |
| Diver Solar | Limestone | Solar | 226 | 2022-09-02 | IA Executed | ERCOT | Current status |
| Bramble Energy Center | Zavala | Battery | 225 | 2023-09-08 | Facility Study | ERCOT | Current status |
| Castro Solar | Castro | Solar | 225 | 2018-02-08 | IA Executed | ERCOT | Current status |
| Tolivar Power Plant (TEF- Due Diligence) | Reeves | Gas | 225 | 2024-07-01 | IA Executed | ERCOT | Current status |
| Tolivar Power Plant Phase 2 | Reeves | Gas | 225 | 2025-07-29 | Facility Study | ERCOT | Current status |
| Old Fiddler Energy Storage | Henderson | Battery | 224 | 2024-01-11 | Facility Study | ERCOT | Current status |
| Olympic BESS | Nueces | Battery | 223 | 2022-10-18 | Facility Study | ERCOT | Current status |
| Oystercatcher Solar | Ellis | Solar | 222 | 2019-05-30 | IA Executed | ERCOT | Current status |
| Grayback Solar | Wilbarger | Solar | 222 | 2025-11-05 | Facility Study | ERCOT | Current status |
| Miracle Ranch Solar SLF | Webb | Solar+Battery | 222 | 2025-02-25 | Facility Study | ERCOT | Current status |
| Goodalta Solar | Navarro | Solar | 221 | 2021-01-25 | Facility Study | ERCOT | Current status |
| Douie Solar | Freestone | Solar | 221 | 2023-05-15 | Facility Study | ERCOT | Current status |
| Angel City Solar | Goliad | Solar | 221 | 2024-02-07 | Facility Study | ERCOT | Current status |
| Shoshana Storage | Matagorda | Battery | 221 | 2022-03-30 | Facility Study | ERCOT | Current status |
| Solar Star Rhome Storage | Wise | Battery | 221 | 2023-04-19 | Facility Study | ERCOT | Current status |
| Coke BESS | Coke | Battery | 220 | 2024-10-01 | Facility Study | ERCOT | Current status |
| Crowded Star Solar | Jones | Solar+Battery | 219 | 2019-01-21 | IA Executed | ERCOT | Current status |
| Sepanta Solar | Nolan | Solar | 217 | 2022-10-18 | Facility Study | ERCOT | Current status |
| Pez Rojo BESS | Harris | Battery | 217 | 2024-07-01 | Facility Study | ERCOT | Current status |
| Two Barbaras BESS | Montgomery | Battery | 217 | 2024-03-22 | IA Executed | ERCOT | Current status |
| ERAS-2025-002 | Hale | Gas | 217 | 2025-09-12 | In Progress (unknown study) | SPS | Current status |
| Marcos Solar SLF | Victoria | Solar+Battery | 216 | 2024-01-11 | Facility Study | ERCOT | Current status |
| Walleye Solar | Milam | Solar | 215 | 2018-07-03 | Facility Study | ERCOT | Current status |
| Diamond Sage Solar 1 | Webb | Solar+Battery | 214 | 2025-01-28 | Facility Study | ERCOT | Current status |
| Diamond Sage Solar 2 | Webb | Solar+Battery | 214 | 2025-01-28 | Facility Study | ERCOT | Current status |
| Puerto Del Sol 1 | Cameron | Solar | 214 | 2022-05-16 | Facility Study | ERCOT | Current status |
| Puerto Del Sol 2 | Cameron | Solar | 214 | 2022-05-16 | Facility Study | ERCOT | Current status |
| Mesquite Creek Windpower Repower | Dawson | Wind | 213 | 2025-04-29 | Facility Study | ERCOT | Current status |
| BumbleBee Solar | Bee | Solar | 212 | 2024-02-27 | Facility Study | ERCOT | Current status |
| Rock Rose BESS | Fort Bend | Battery | 212 | 2023-09-22 | IA Executed | ERCOT | Current status |
| Vazlon Solar SLF | La Salle | Solar+Battery | 211 | 2024-10-01 | Facility Study | ERCOT | Current status |
| Grimes County Solar | Grimes | Solar | 211 | 2021-01-26 | IA Executed | ERCOT | Current status |
| Rockridge Solar | Guadalupe | Solar | 211 | 2022-04-18 | IA Executed | ERCOT | Current status |
| Gypsum Plains Storage | Ector | Solar+Battery | 211 | 2025-01-31 | Facility Study | ERCOT | Current status |
| Bessie Storage | Starr | Battery | 211 | 2022-02-21 | Facility Study | ERCOT | Current status |
| Cumulus Grid BESS | Ellis | Battery | 211 | 2022-03-14 | IA Executed | ERCOT | Current status |
| Val Vista Grid BESS 2 | Hidalgo | Battery | 211 | 2021-10-01 | Facility Study | ERCOT | Current status |
| Guadalupe Battery Storage Project | Guadalupe | Battery | 211 | 2023-11-14 | Facility Study | ERCOT | Current status |
| Freestone Battery Storage Project | Freestone | Battery | 211 | 2024-02-07 | Facility Study | ERCOT | Current status |
| Leon Solar Park | Leon | Solar+Battery | 210 | 2022-09-15 | IA Executed | ERCOT | Current status |
| Elk Unit 4 | Hale | Gas | 210 | 2024-04-09 | Facility Study | ERCOT | Current status |
| Val Vista Grid BESS 1 | Hidalgo | Battery | 209 | 2020-08-04 | Facility Study | ERCOT | Current status |
| Moonlit Bayou Storage | Fayette | Battery | 209 | 2024-02-26 | Facility Study | ERCOT | Current status |
| Treehouse Storage | Grimes | Solar+Battery | 209 | 2025-07-29 | Facility Study | ERCOT | Current status |
| New Hickory Solar | Jackson | Solar | 209 | 2019-01-25 | IA Executed | ERCOT | Current status |
| Anila BESS | Wilson | Solar+Battery | 209 | 2023-02-20 | IA Executed | ERCOT | Current status |
| Hornet Solar II SLF | Swisher | Solar+Battery | 209 | 2023-01-03 | IA Executed | ERCOT | Current status |
| Clapton Storage | Mills | Solar+Battery | 209 | 2024-03-22 | Facility Study | ERCOT | Current status |
| Sorghum BESS | Wharton | Battery | 209 | 2024-04-15 | IA Executed | ERCOT | Current status |
| Sisters Storage | Ector | Solar+Battery | 209 | 2019-12-18 | Facility Study | ERCOT | Current status |
| Forts Trail BESS | Taylor | Solar+Battery | 209 | 2022-06-02 | Facility Study | ERCOT | Current status |
| Zeus Rusk BESS | Rusk | Solar+Battery | 209 | 2024-04-09 | Facility Study | ERCOT | Current status |
| REVOLUTION BESS | La Salle | Battery | 209 | 2024-05-09 | Facility Study | ERCOT | Current status |
| Starlit Pasture Storage | Washington | Battery | 209 | 2024-08-16 | Facility Study | ERCOT | Current status |
| Two Rivers Solar | Milam | Solar | 209 | 2021-07-27 | Facility Study | ERCOT | Current status |
| ALWEST BESS | Anderson | Battery | 209 | 2021-08-24 | Facility Study | ERCOT | Current status |
| Jolly Rock Storage Center | Young | Battery | 209 | 2024-12-19 | Facility Study | ERCOT | Current status |
| Gusty Windpower | Glasscock | Wind | 209 | 2024-07-30 | IA Executed | ERCOT | Current status |
| Pearl Crescent Solar | Colorado | Solar+Battery | 208 | 2019-05-31 | Facility Study | ERCOT | Current status |
| New Minglewood Energy Center | Ward | Battery | 208 | 2024-05-09 | Facility Study | ERCOT | Current status |
| Sunlit Pines BESS SLF | Nacogdoches | Solar+Battery | 208 | 2024-04-09 | Facility Study | ERCOT | Current status |
| Ferdinand Grid BESS II | Bexar | Battery | 208 | 2024-12-19 | Facility Study | ERCOT | Current status |
| Pearl Moon | Colorado | Solar | 208 | 2023-09-07 | Facility Study | ERCOT | Current status |
| Bypass Battery Storage | Fort Bend | Battery | 208 | 2021-08-18 | IA Executed | ERCOT | Current status |
| Burnet Bay Storage | Harris | Battery | 208 | 2024-09-10 | Facility Study | ERCOT | Current status |
| Anatole Renewable Energy Storage | Henderson | Battery | 208 | 2022-06-02 | IA Executed | ERCOT | Current status |
| Gulf Prairie BESS | Brazoria | Solar+Battery | 208 | 2025-09-22 | Facility Study | ERCOT | Current status |
| Cottonseed Energy Storage | Wharton | Battery | 208 | 2023-11-14 | Facility Study | ERCOT | Current status |
| Reforzar BESS 1 | Brooks | Battery | 208 | 2024-12-19 | Facility Study | ERCOT | Current status |
| Reforzar Bess 2 | Brooks | Battery | 208 | 2024-12-19 | Facility Study | ERCOT | Current status |
| Woodland Energy Storage | Bosque | Battery | 208 | 2023-12-18 | Facility Study | ERCOT | Current status |
| Erath County Solar | Erath | Solar | 207 | 2021-03-08 | IA Executed | ERCOT | Current status |
| Liberty Senate Energy Storage 1 | Jack | Battery | 207 | 2021-10-05 | Facility Study | ERCOT | Current status |
| Bravo BESS | Webb | Battery | 207 | 2024-11-26 | Facility Study | ERCOT | Current status |
| Longfellow Solar II | Pecos | Solar+Battery | 207 | 2022-11-07 | IA Executed | ERCOT | Current status |
| Old Roman Energy Center | Reagan | Battery | 207 | 2024-10-01 | Facility Study | ERCOT | Current status |
| VERTUS ENERGY STORAGE | Galveston | Battery | 207 | 2023-10-13 | IA Executed | ERCOT | Current status |
| Pintail Pass BESS | San Patricio | Battery | 207 | 2022-04-18 | IA Executed | ERCOT | Current status |
| Metro BESS | Caldwell | Battery | 207 | 2025-02-25 | Facility Study | ERCOT | Current status |
| River Boat Storage | Mitchell | Solar+Battery | 207 | 2024-10-01 | Facility Study | ERCOT | Current status |
| GEN-2019-011 | Yoakum | Battery | 207 | 2019-04-22 | IA Executed | SPS | Current status |
| St. Gall Solar | Pecos | Solar | 207 | 2022-02-28 | Facility Study | ERCOT | Current status |
| Aldrin 138 BESS | Brazoria | Battery | 207 | 2023-05-15 | IA Executed | ERCOT | Current status |
| Tapaderos Storage | Young | Solar+Battery | 207 | 2024-11-19 | Facility Study | ERCOT | Current status |
| Oak Belt Storage | Victoria | Solar+Battery | 207 | 2025-12-23 | Facility Study | ERCOT | Current status |
| BRP Hemera BESS | Deaf Smith | Battery | 207 | 2021-12-29 | Facility Study | ERCOT | Current status |
| BRP Rhine BESS | Ward | Battery | 207 | 2020-08-04 | Facility Study | ERCOT | Current status |
| BRP Volans BESS | Winkler | Battery | 207 | 2020-08-04 | Facility Study | ERCOT | Current status |
| BRP Pyxis BESS | Ward | Battery | 207 | 2020-09-25 | Facility Study | ERCOT | Current status |
| Rockefeller Storage | Schleicher | Battery | 207 | 2019-10-31 | IA Executed | ERCOT | Current status |
| Hoyte Solar | Milam | Solar | 207 | 2021-04-01 | IA Executed | ERCOT | Current status |
| Zunkerville BESS | Karnes | Solar+Battery | 207 | 2025-09-22 | Facility Study | ERCOT | Current status |
| Sunlit Pines Solar SLF | Nacogdoches | Solar+Battery | 207 | 2024-03-29 | Facility Study | ERCOT | Current status |
| Wolfram Storage | Calhoun | Battery | 207 | 2025-05-19 | Facility Study | ERCOT | Current status |
| Shackleford BESS | Shackelford | Battery | 207 | 2024-12-19 | Facility Study | ERCOT | Current status |
| Solar Star Bay City Storage | Matagorda | Battery | 206 | 2023-12-20 | Facility Study | ERCOT | Current status |
| Rock N' Roll Storage Two | Brazoria | Solar+Battery | 206 | 2022-02-28 | Facility Study | ERCOT | Current status |
| Anglin BESS | Tarrant | Battery | 206 | 2024-05-09 | Facility Study | ERCOT | Current status |
| Plant Road BESS | Ector | Battery | 206 | 2024-10-10 | Facility Study | ERCOT | Current status |
| Varadero Solar | Limestone | Solar | 206 | 2023-07-10 | Facility Study | ERCOT | Current status |
| Champion Road BESS | Angelina | Battery | 206 | 2025-02-14 | Facility Study | ERCOT | Current status |
| Maximino Road BESS | Comal | Battery | 206 | 2025-03-24 | Facility Study | ERCOT | Current status |
| ARTIO ENERGY STORAGE | Collin | Battery | 206 | 2023-11-14 | Facility Study | ERCOT | Current status |
| Amphion Solar Phase 2 | Atascosa | Solar | 206 | 2025-04-21 | Facility Study | ERCOT | Current status |
| Roan Solar Phase 1 | Sterling | Solar | 206 | 2025-10-21 | Facility Study | ERCOT | Current status |
| Roan Solar Phase 2 | Sterling | Solar | 206 | 2025-10-21 | Facility Study | ERCOT | Current status |
| Supra Wind | Hardeman | Wind | 206 | 2023-07-10 | Facility Study | ERCOT | Current status |
| J3586 | Montgomery | Solar+Battery | 206 | 2024-04-18 | In Progress (unknown study) | ENTERGY TEXAS, INC. | Current status |
| Hamby Solar | Jones | Solar | 206 | 2024-03-22 | Facility Study | ERCOT | Current status |
| Shaula I BESS | Dewitt | Solar+Battery | 206 | 2023-07-10 | Facility Study | ERCOT | Current status |
| Yellow Leaf II BESS | Kaufman | Solar+Battery | 206 | 2025-07-22 | Facility Study | ERCOT | Current status |
| Alila BESS II | San Patricio | Solar+Battery | 206 | Facility Study | ERCOT | Current status | |
| Sunflower Valley Storage | Mitchell | Battery | 206 | 2025-04-25 | Facility Study | ERCOT | Current status |
| Rhapsody Storage | Harris | Battery | 206 | 2022-08-16 | IA Executed | ERCOT | Current status |
| Forts Trail BESS 2 | Taylor | Solar+Battery | 206 | 2023-02-20 | Facility Study | ERCOT | Current status |
| Sisters Solar II | Ector | Solar+Battery | 206 | 2024-10-21 | Facility Study | ERCOT | Current status |
| Cado Storage | Bexar | Battery | 206 | 2023-03-13 | Facility Study | ERCOT | Current status |
| Ferdinand Grid BESS | Bexar | Battery | 206 | 2021-03-01 | IA Executed | ERCOT | Current status |
| Pajarita BESS | Cameron | Battery | 206 | 2021-01-25 | IA Executed | ERCOT | Current status |
| Bhalu Storage | Howard | Battery | 206 | 2023-10-30 | Facility Study | ERCOT | Current status |
| Pleiades Storage | Glasscock | Battery | 206 | 2024-03-22 | Facility Study | ERCOT | Current status |
| Caesar Storage | Borden | Solar+Battery | 206 | 2025-07-29 | Facility Study | ERCOT | Current status |
| Trivor BESS | Andrews | Battery | 205 | 2021-06-03 | Facility Study | ERCOT | Current status |
| Crios BESS | Comanche | Battery | 205 | 2021-10-18 | Facility Study | ERCOT | Current status |
| Desna BESS | Brazoria | Battery | 205 | 2021-12-15 | IA Executed | ERCOT | Current status |
| Castor BESS | Brazoria | Battery | 205 | 2021-10-04 | IA Executed | ERCOT | Current status |
| Hittson Creek BESS | Callahan | Solar+Battery | 205 | 2024-12-19 | Facility Study | ERCOT | Current status |
| BRP Triton BESS | Comanche | Battery | 205 | 2021-10-18 | Facility Study | ERCOT | Current status |
| Soda Lake BESS 2 SLF | Crane | Solar+Battery | 205 | 2022-09-02 | Facility Study | ERCOT | Current status |
| Tri-X BESS 1 SLF | Crane | Solar+Battery | 205 | 2025-08-18 | Facility Study | ERCOT | Current status |
| Shaula I Solar | Dewitt | Solar+Battery | 205 | 2019-12-03 | IA Executed | ERCOT | Current status |
| Shaula II Solar | Dewitt | Solar+Battery | 205 | 2019-12-18 | IA Executed | ERCOT | Current status |
| Shaula III Solar | Dewitt | Solar+Battery | 205 | 2019-12-18 | Facility Study | ERCOT | Current status |
| TOCE BESS 1 | Wharton | Battery | 205 | 2023-10-13 | IA Executed | ERCOT | Current status |
| Allthorn BESS | Duval | Solar+Battery | 205 | 2025-02-14 | Facility Study | ERCOT | Current status |
| Les Energy Storage | Howard | Battery | 205 | 2023-02-09 | Facility Study | ERCOT | Current status |
| J1760 | Liberty | Solar | 205 | 2020-06-15 | IA Executed | ENTERGY TEXAS, INC. | Current status |
| Bell County Leifester Storage | Bell | Battery | 205 | 2024-11-19 | Facility Study | ERCOT | Current status |
| Taylor County Paul Storage | Taylor | Battery | 205 | 2024-12-19 | Facility Study | ERCOT | Current status |
| Tomahawk Road BESS | Ector | Battery | 205 | 2024-08-16 | Facility Study | ERCOT | Current status |
| Sepik BESS | Mitchell | Battery | 205 | 2020-12-22 | Facility Study | ERCOT | Current status |
| Star Dairy Storage | Lamar | Solar+Battery | 205 | 2023-04-19 | IA Executed | ERCOT | Current status |
| Energy City BESS | Midland | Battery | 205 | 2023-10-04 | Facility Study | ERCOT | Current status |
| Calico BESS | Victoria | Battery | 205 | 2025-04-29 | Facility Study | ERCOT | Current status |
| Guitar BESS | Callahan | Battery | 205 | 2023-05-15 | Facility Study | ERCOT | Current status |
| SOUTHERN SELECT ENERGY STORAGE | Galveston | Battery | 205 | 2023-10-25 | IA Executed | ERCOT | Current status |
| Running Iron Solar | Matagorda | Solar | 205 | 2023-10-25 | Facility Study | ERCOT | Current status |
| Liatris Flexible Gas | Brazoria | Gas | 205 | 2024-03-22 | IA Executed | ERCOT | Current status |
| Carolina Storage Midland | Howard | Battery | 205 | 2024-07-01 | Facility Study | ERCOT | Current status |
| Lightning Ridge Energy Storage | Jack | Battery | 205 | 2024-03-29 | Facility Study | ERCOT | Current status |
| Limewood Solar | Bell | Solar+Battery | 205 | 2021-04-30 | IA Executed | ERCOT | Current status |
| Prospector Energy Storage | Howard | Battery | 205 | 2024-08-16 | Facility Study | ERCOT | Current status |
| Arc Energy Storage | Lamar | Battery | 205 | 2023-07-31 | Facility Study | ERCOT | Current status |
| South Tripoint BESS | Fayette | Battery | 205 | 2024-12-19 | Facility Study | ERCOT | Current status |
| SAHARA BESS (SOHO BESS) | Brazoria | Battery | 204 | 2021-12-03 | IA Executed | ERCOT | Current status |
| Dan Kearney BESS | Brazoria | Battery | 204 | 2024-01-11 | IA Executed | ERCOT | Current status |
| Drill Baby Drill BESS | Midland | Battery | 204 | 2024-09-04 | Facility Study | ERCOT | Current status |
| SAHARA II BESS (SOHO II BESS) | Brazoria | Battery | 204 | 2022-08-16 | IA Executed | ERCOT | Current status |
| Hoskins Solar | Lamar | Solar | 204 | 2022-10-24 | Facility Study | ERCOT | Current status |
| Keys Hollow Solar Phase II SLF | Goliad | Solar+Battery | 204 | 2021-06-17 | IA Executed | ERCOT | Current status |
| KEYS HOLLOW SOLAR SLF | Goliad | Solar+Battery | 204 | 2021-06-17 | IA Executed | ERCOT | Current status |
| Sonora High Noon BESS | Sutton | Battery | 204 | 2024-09-04 | Facility Study | ERCOT | Current status |
| Fermata BESS | Hunt | Battery | 204 | 2025-02-25 | Facility Study | ERCOT | Current status |
| Corazon Solar Phase II | Webb | Solar+Battery | 204 | 2019-12-19 | IA Executed | ERCOT | Current status |
| Sowers Storage | Kaufman | Battery | 204 | 2021-08-18 | IA Executed | ERCOT | Current status |
| Chimney Creek Solar | Shackelford | Solar | 204 | 2025-02-14 | Facility Study | ERCOT | Current status |
| Soda Lake BESS 1 | Crane | Battery | 204 | 2022-09-02 | IA Executed | ERCOT | Current status |
| Black & Gold Energy Storage | Menard | Battery | 204 | 2022-07-18 | IA Executed | ERCOT | Current status |
| Sierra Diablo Energy Storage | Van Zandt | Battery | 204 | 2022-08-05 | Facility Study | ERCOT | Current status |
| Diamondback solar | Starr | Solar | 204 | 2018-09-13 | IA Executed | ERCOT | Current status |
| Ringtail Energy Storage | Archer | Battery | 204 | 2025-04-25 | Facility Study | ERCOT | Current status |
| Tidwell Prairie II Batt | Robertson | Battery | 204 | 2021-03-16 | IA Executed | ERCOT | Current status |
| Barton Branch IA | Robertson | Battery | 204 | 2021-03-16 | IA Executed | ERCOT | Current status |
| Fewell Solar | Limestone | Solar | 204 | 2021-08-19 | IA Executed | ERCOT | Current status |
| Glasgow Solar | Navarro | Solar+Battery | 204 | 2022-02-07 | IA Executed | ERCOT | Current status |
| Mercury Solar III | Hill | Solar+Battery | 204 | 2022-08-16 | Facility Study | ERCOT | Current status |
| Timberlakes Solar | Dickens | Solar | 204 | 2022-11-07 | Facility Study | ERCOT | Current status |
| Nockenut Springs Solar 2 | Guadalupe | Solar | 203 | 2020-09-25 | IA Executed | ERCOT | Current status |
| Marcelina Storage | Wilson | Battery | 203 | 2021-08-09 | Facility Study | ERCOT | Current status |
| Callisto II Energy Center | Harris | Battery | 203 | 2021-10-07 | IA Executed | ERCOT | Current status |
| Brookview Road BESS | Harris | Battery | 203 | 2024-04-09 | IA Executed | ERCOT | Current status |
| Kinenos Solar | Brooks | Solar | 203 | 2020-12-22 | Facility Study | ERCOT | Current status |
| Nockenut Springs Solar 1 | Guadalupe | Solar | 203 | 2020-09-25 | IA Executed | ERCOT | Current status |
| Big Star Solar | Bastrop | Solar | 203 | 2019-08-27 | IA Executed | ERCOT | Current status |
| OCI Cobb Creek Solar | Hill | Solar+Battery | 203 | 2022-11-15 | IA Executed | ERCOT | Current status |
| Brahman Renewables Storage | Milam | Solar+Battery | 203 | 2024-10-29 | Facility Study | ERCOT | Current status |
| Loma Pinta Solar | La Salle | Solar | 203 | 2020-06-03 | Facility Study | ERCOT | Current status |
| GEN-2022-147 | Hale | Gas | 203 | 2023-02-21 | Facility Study | SPS | Current status |
| Nazareth Solar | Castro | Solar | 203 | 2014-06-19 | IA Executed | ERCOT | Current status |
| Samson Solar 2 | Lamar | Solar | 203 | 2020-01-13 | IA Executed | ERCOT | Current status |
| Alexandrite Storage | Cameron | Battery | 203 | 2022-06-27 | Facility Study | ERCOT | Current status |
| Charro Creek Solar 1 SLF | Karnes | Solar+Battery | 203 | 2023-01-30 | Facility Study | ERCOT | Current status |
| Charro Creek Solar 2 SLF | Karnes | Solar+Battery | 203 | 2023-03-08 | Facility Study | ERCOT | Current status |
| Charro Creek Solar 3 SLF | Karnes | Solar+Battery | 203 | 2023-03-08 | Facility Study | ERCOT | Current status |
| Bigway Solar I | King | Solar | 203 | 2024-01-11 | IA Executed | ERCOT | Current status |
| Bigway Solar II | King | Solar | 203 | 2023-12-20 | IA Executed | ERCOT | Current status |
| Caracara Energy Storage Center | Bexar | Battery | 203 | 2024-05-09 | Facility Study | ERCOT | Current status |
| Soluce Cotton Solar | Cottle | Solar+Battery | 203 | 2025-02-14 | Facility Study | ERCOT | Current status |
| Bee Branch IA | Robertson | Battery | 203 | 2021-11-15 | Facility Study | ERCOT | Current status |
| Carolina Storage Odessa | Howard | Battery | 203 | 2024-02-02 | Facility Study | ERCOT | Current status |
| Coati Energy Storage | Harris | Battery | 203 | 2024-12-19 | Facility Study | ERCOT | Current status |
| Wolf Spring Storage | Dickens | Solar+Battery | 203 | 2022-12-15 | IA Executed | ERCOT | Current status |
| Saint Charles Energy Storage | Houston | Battery | 203 | 2024-02-27 | Facility Study | ERCOT | Current status |
| Prost ESS | Austin | Battery | 203 | 2024-02-27 | Facility Study | ERCOT | Current status |
| Ceres BESS | Hunt | Battery | 203 | 2024-10-29 | Facility Study | ERCOT | Current status |
| Techne BESS | Bastrop | Battery | 203 | 2024-09-10 | Facility Study | ERCOT | Current status |
| Crowded Star I BESS | Jones | Solar+Battery | 203 | 2023-08-21 | IA Executed | ERCOT | Current status |
| Legato BESS | Wise | Battery | 203 | 2022-09-27 | Facility Study | ERCOT | Current status |
| Fortissimo BESS | Montague | Battery | 203 | 2022-10-18 | Facility Study | ERCOT | Current status |
| Elan BESS | Fort Bend | Battery | 203 | 2023-03-08 | Facility Study | ERCOT | Current status |
| Bologna BESS | Wichita | Battery | 203 | 2024-03-29 | Facility Study | ERCOT | Current status |
| Trenno BESS | Johnson | Battery | 203 | 2024-02-07 | IA Executed | ERCOT | Current status |
| BRP Perseus BESS | Nueces | Battery | 203 | 2020-08-21 | Facility Study | ERCOT | Current status |
| Erin Solar | Wharton | Solar | 203 | 2020-07-24 | IA Executed | ERCOT | Current status |
| Old Victory Energy Center | Maverick | Battery | 203 | 2024-05-09 | Facility Study | ERCOT | Current status |
| BRP Kamet BESS | Andrews | Battery | 202 | 2020-10-07 | Facility Study | ERCOT | Current status |
| BRP Kabru BESS | Andrews | Battery | 202 | 2020-10-07 | Facility Study | ERCOT | Current status |
| Guajillo Wind | Duval | Wind | 202 | 2024-12-19 | Facility Study | ERCOT | Current status |
| Inertia Solar | Haskell | Solar | 202 | 2021-02-02 | IA Executed | ERCOT | Current status |
| SANJAC BESS | Harris | Battery | 202 | 2021-07-08 | Facility Study | ERCOT | Current status |
| BRP Nile BESS | Webb | Battery | 202 | 2021-05-31 | Facility Study | ERCOT | Current status |
| Willow Beach Wind | Brazoria | Wind | 202 | 2023-10-13 | IA Executed | ERCOT | Current status |
| Bottom Grass BESS | Colorado | Solar+Battery | 202 | 2020-11-05 | IA Executed | ERCOT | Current status |
| Gulf Prairie Solar | Brazoria | Solar+Battery | 202 | 2025-06-19 | Facility Study | ERCOT | Current status |
| Carolina Storage Wichita Falls | Archer | Battery | 202 | 2024-02-26 | Facility Study | ERCOT | Current status |
| Pianissimo BESS II | Wise | Battery | 202 | 2024-11-19 | Facility Study | ERCOT | Current status |
| Tennuto BESS | Cooke | Battery | 202 | 2025-01-28 | Facility Study | ERCOT | Current status |
| Coda BESS | San Patricio | Battery | 202 | 2025-01-28 | Facility Study | ERCOT | Current status |
| Hacienda Storage | Galveston | Battery | 202 | 2022-05-10 | Facility Study | ERCOT | Current status |
| McMEXICO STORAGE | Hidalgo | Battery | 202 | 2022-02-28 | Facility Study | ERCOT | Current status |
| Galaxy Storage 2 | Ellis | Battery | 202 | 2025-06-19 | Facility Study | ERCOT | Current status |
| Dodd Solar I | Henderson | Solar | 202 | 2021-06-24 | IA Executed | ERCOT | Current status |
| Staccato BESS | Fayette | Battery | 202 | 2022-11-07 | Facility Study | ERCOT | Current status |
| Bluefox Solar 3 | Matagorda | Solar | 202 | 2024-03-22 | Facility Study | ERCOT | Current status |
| Altair Energy Storage | Colorado | Battery | 202 | 2025-04-21 | Facility Study | ERCOT | Current status |
| Soda Lake Solar 2 SLF | Crane | Solar+Battery | 202 | 2020-09-11 | IA Executed | ERCOT | Current status |
| Avant Prairie BESS | Freestone | Battery | 202 | 2024-09-04 | Facility Study | ERCOT | Current status |
| Donegal Solar | Dickens | Solar | 202 | 2020-10-07 | IA Executed | ERCOT | Current status |
| Mesteno Wind | Starr | Wind | 202 | 2014-12-30 | IA Executed | ERCOT | Current status |
| Stoneridge Solar | Milam | Solar | 202 | 2021-10-08 | IA Executed | ERCOT | Current status |
| Goldeneye BESS | Bell | Battery | 202 | 2022-06-10 | IA Executed | ERCOT | Current status |
| OCI Cobb Creek ESS | Hill | Solar+Battery | 202 | 2022-12-07 | IA Executed | ERCOT | Current status |
| Texas Cotton Solar | Brazos | Solar | 202 | 2024-10-01 | Facility Study | ERCOT | Current status |
| Spurland Solar II | Dickens | Solar | 202 | 2025-11-05 | Facility Study | ERCOT | Current status |
| Sun Angel ESS | Angelina | Battery | 202 | 2024-06-13 | Facility Study | ERCOT | Current status |
| Soluce Cotton Storage | Cottle | Solar+Battery | 202 | 2025-02-14 | Facility Study | ERCOT | Current status |
| Thomas Cameron BESS | Lampasas | Battery | 202 | 2023-06-07 | IA Executed | ERCOT | Current status |
| Tri-X Solar 1 SLF | Crane | Solar+Battery | 202 | 2016-11-07 | IA Executed | ERCOT | Current status |
| Tex-Bar ESS | Madison | Battery | 202 | 2024-03-22 | Facility Study | ERCOT | Current status |
| Corvus Solar | Webb | Solar | 202 | 2024-02-07 | IA Executed | ERCOT | Current status |
| Nockenut Springs Solar 3 | Gonzales | Solar | 201 | 2020-09-25 | Facility Study | ERCOT | Current status |
| Padrino Solar | Hill | Solar | 201 | 2022-09-15 | IA Executed | ERCOT | Current status |
| Exodus BESS | Caldwell | Battery | 201 | 2023-07-10 | Facility Study | ERCOT | Current status |
| Sawtooth Solar | Runnels | Solar | 201 | 2025-11-24 | Facility Study | ERCOT | Current status |
| Padua Grid BESS Unit 3 | Bexar | Battery | 201 | 2024-03-22 | IA Executed | ERCOT | Current status |
| El Molino Solar SLF | Webb | Solar+Battery | 201 | 2023-01-17 | Facility Study | ERCOT | Current status |
| Eldora BESS | Matagorda | Solar+Battery | 201 | 2022-06-10 | IA Executed | ERCOT | Current status |
| Tucana BESS | Andrews | Battery | 201 | 2021-06-03 | Facility Study | ERCOT | Current status |
| Desert Palm BESS | Dimmit | Battery | 201 | 2024-08-16 | Facility Study | ERCOT | Current status |
| Finch Storage | Mclennan | Battery | 201 | 2025-06-05 | Facility Study | ERCOT | Current status |
| Caladium BESS | Waller | Battery | 201 | 2024-11-19 | Facility Study | ERCOT | Current status |
| RUSH ESS | Bexar | Battery | 201 | 2023-11-30 | Facility Study | ERCOT | Current status |
| Outer Loop BESS | Harris | Battery | 201 | 2021-09-29 | Facility Study | ERCOT | Current status |
| Wintergarden BESS | Dimmit | Battery | 201 | 2024-08-16 | Facility Study | ERCOT | Current status |
| Spinosa BESS | Wichita | Battery | 201 | 2025-04-29 | Facility Study | ERCOT | Current status |
| Savannah Oaks Solar | Madison | Solar | 201 | 2023-01-03 | Facility Study | ERCOT | Current status |
| Nockenut Springs Solar 4 | Gonzales | Solar | 201 | 2022-09-15 | Facility Study | ERCOT | Current status |
| Apache Hill BESS | Hood | Battery | 201 | 2022-11-07 | IA Executed | ERCOT | Current status |
| Nockenut Springs Solar 5 | Gonzales | Solar | 201 | 2023-02-09 | Facility Study | ERCOT | Current status |
| Echols Grove, LLC | Lamar | Solar | 201 | 2023-04-07 | IA Executed | ERCOT | Current status |
| Morrow Lake Storage | Frio | Solar+Battery | 201 | 2020-02-07 | Facility Study | ERCOT | Current status |
| Champaign BESS | Glasscock | Battery | 201 | 2022-09-21 | IA Executed | ERCOT | Current status |
| Seragio BESS | Ector | Battery | 201 | 2022-09-15 | Facility Study | ERCOT | Current status |
| Jasper BESS | Midland | Battery | 201 | 2022-09-21 | Facility Study | ERCOT | Current status |
| Blue Heron BESS | Reeves | Battery | 201 | 2022-10-24 | Facility Study | ERCOT | Current status |
| Motif BESS II | Bandera | Battery | 201 | 2024-11-19 | Facility Study | ERCOT | Current status |
| Ramsey Storage | Wharton | Battery | 201 | 2020-05-20 | IA Executed | ERCOT | Current status |
| Goat Mountain BESS | Sterling | Wind+Battery | 201 | 2025-01-28 | Facility Study | ERCOT | Current status |
| Moonlight Sonata BESS | Colorado | Battery | 201 | 2022-09-27 | Facility Study | ERCOT | Current status |
| Dios BESS | Jackson | Battery | 201 | 2023-05-15 | IA Executed | ERCOT | Current status |
| Big Rooter West Storage | Robertson | Solar+Battery | 201 | 2024-03-22 | Facility Study | ERCOT | Current status |
| BRP Pictor BESS | Crane | Battery | 201 | 2020-07-24 | Facility Study | ERCOT | Current status |
| Dry Creek Solar I | Rusk | Solar | 201 | 2021-08-18 | IA Executed | ERCOT | Current status |
| Smokey Willie Solar SLF | Anderson | Solar+Battery | 201 | 2022-01-06 | Facility Study | ERCOT | Current status |
| Marcus Energy Storage | Brazoria | Battery | 201 | 2023-06-07 | Facility Study | ERCOT | Current status |
| Copano Bay Energy Storage | Brazoria | Battery | 201 | 2023-10-25 | Facility Study | ERCOT | Current status |
| Zelus BESS | Zapata | Battery | 201 | 2021-12-20 | Facility Study | ERCOT | Current status |
| Big Rooter East Storage | Robertson | Solar+Battery | 201 | 2024-03-22 | IA Executed | ERCOT | Current status |
| Tarim BESS | Karnes | Battery | 201 | 2024-11-19 | Facility Study | ERCOT | Current status |
| Timberline Solar | Nacogdoches | Solar+Battery | 201 | 2023-08-14 | Facility Study | ERCOT | Current status |
| Hamlet Solar SLF | Frio | Solar+Battery | 201 | 2024-11-19 | Facility Study | ERCOT | Current status |
| Hamlet Storage SLF | Frio | Solar+Battery | 201 | 2024-11-19 | Facility Study | ERCOT | Current status |
| Elbus BESS | Caldwell | Battery | 201 | 2020-12-03 | Facility Study | ERCOT | Current status |
| Clapton Solar | Mills | Solar+Battery | 201 | 2024-03-22 | Facility Study | ERCOT | Current status |
| Felix North Solar | Wilbarger | Solar+Battery | 201 | 2019-01-17 | IA Executed | ERCOT | Current status |
| Dahlia Solar | La Salle | Solar | 201 | 2025-02-14 | Facility Study | ERCOT | Current status |
| De Los Santos | Maverick | Battery | 201 | 2022-05-10 | Facility Study | ERCOT | Current status |
| Oakley BESS | Denton | Battery | 201 | 2025-10-06 | Facility Study | ERCOT | Current status |
| Felix West Solar | Wilbarger | Solar+Battery | 201 | 2023-01-17 | IA Executed | ERCOT | Current status |
| Eldora Solar | Matagorda | Solar+Battery | 201 | 2022-06-10 | IA Executed | ERCOT | Current status |
| Felix East Solar | Wilbarger | Solar+Battery | 201 | 2023-01-03 | IA Executed | ERCOT | Current status |
| Anson Solar 2 | Jones | Solar+Battery | 201 | 2017-06-23 | IA Executed | ERCOT | Current status |
| Sloan Storage | Henderson | Battery | 201 | 2022-02-21 | Facility Study | ERCOT | Current status |
| Bell Creek BESS | Brazoria | Battery | 201 | 2023-06-28 | IA Executed | ERCOT | Current status |
| Kahla Storage | Leon | Battery | 201 | 2023-08-21 | Facility Study | ERCOT | Current status |
| Sengun BESS | Nueces | Battery | 201 | 2024-01-03 | Facility Study | ERCOT | Current status |
| Cummins BESS | Glasscock | Battery | 201 | 2024-10-01 | Facility Study | ERCOT | Current status |
| Cebocell BESS | Smith | Battery | 201 | 2024-09-04 | Facility Study | ERCOT | Current status |
| Possum Kingdom BESS | Jack | Solar+Battery | 201 | 2022-09-02 | Facility Study | ERCOT | Current status |
| Cradle Solar | Brazoria | Solar | 201 | 2021-02-04 | IA Executed | ERCOT | Current status |
| Cottontail Energy Center | Colorado | Battery | 201 | 2023-10-25 | Facility Study | ERCOT | Current status |
| Eagle Claw Energy Center | Grimes | Battery | 201 | 2023-10-13 | IA Executed | ERCOT | Current status |
| Abeja Solar Farm | Bee | Solar | 201 | 2024-12-19 | IA Executed | ERCOT | Current status |
| Trelas | Mcculloch | Battery | 201 | 2022-09-02 | Facility Study | ERCOT | Current status |
| APV Plumwood Storage | Chambers | Battery | 201 | 2022-03-30 | IA Executed | ERCOT | Current status |
| Forts Trail Solar | Taylor | Solar+Battery | 201 | 2022-06-02 | Facility Study | ERCOT | Current status |
| Augie BESS | Waller | Battery | 201 | 2023-01-23 | Facility Study | ERCOT | Current status |
| Kota Battery | Carson | Battery | 201 | 2021-06-07 | Facility Study | ERCOT | Current status |
| Fike BESS | Hidalgo | Battery | 201 | 2023-05-15 | Facility Study | ERCOT | Current status |
| Longday Solar SLF | Kinney | Solar+Battery | 201 | 2023-07-31 | Facility Study | ERCOT | Current status |
| Anila Solar | Wilson | Solar+Battery | 201 | 2023-01-30 | IA Executed | ERCOT | Current status |
| Stinger Energy Storage | Harris | Battery | 201 | 2023-11-14 | Facility Study | ERCOT | Current status |
| Pecos Storage Center | Pecos | Wind+Battery | 201 | 2023-09-07 | IA Executed | ERCOT | Current status |
| Falcon Zapata Storage 138 | Zapata | Battery | 201 | 2023-05-15 | Facility Study | ERCOT | Current status |
| Yaupon Solar SLF | Milam | Solar | 201 | 2021-03-30 | IA Executed | ERCOT | Current status |
| Blanquilla BESS | Nueces | Battery | 201 | 2023-02-09 | IA Executed | ERCOT | Current status |
| Bobcat Cameron BESS | Cameron | Battery | 201 | 2023-04-19 | Facility Study | ERCOT | Current status |
| Rio Hondo BESS | Cameron | Battery | 201 | 2024-05-09 | Facility Study | ERCOT | Current status |
| Clutch City Solar Phase I | Brazoria | Solar | 201 | 2020-01-22 | IA Executed | ERCOT | Current status |
| Pine Forest BESS | Hopkins | Battery | 201 | 2021-05-04 | IA Executed | ERCOT | Current status |
| Obbligato BESS | Milam | Battery | 201 | 2025-06-19 | Facility Study | ERCOT | Current status |
| Arpeggio BESS | Victoria | Battery | 201 | 2025-06-19 | Facility Study | ERCOT | Current status |
| Resaca Oasis Storage | Cameron | Battery | 201 | 2024-12-12 | IA Executed | ERCOT | Current status |
| Dilley Solar | Frio | Solar | 201 | 2025-12-23 | Facility Study | ERCOT | Current status |
| Zunkerville Solar | Karnes | Solar+Battery | 201 | 2025-12-02 | Facility Study | ERCOT | Current status |
| Cash Mills Storage Center | Mills | Battery | 201 | 2024-11-26 | Facility Study | ERCOT | Current status |
| Goby Energy Center | Brazoria | Battery | 201 | 2024-05-20 | Facility Study | ERCOT | Current status |
| Waterloo Solar 1 | Bastrop | Solar+Battery | 201 | 2023-04-19 | IA Executed | ERCOT | Current status |
| Beitel Energy Storage | Jack | Battery | 201 | 2023-08-14 | Facility Study | ERCOT | Current status |
| Vaughn Energy Storage | Grimes | Battery | 201 | 2023-08-21 | Facility Study | ERCOT | Current status |
| BremRaek BESS | Austin | Battery | 201 | 2024-03-22 | Facility Study | ERCOT | Current status |
| Red Top Solar I | Young | Solar | 201 | 2023-01-17 | Facility Study | ERCOT | Current status |
| JackGard BESS | Jack | Battery | 201 | 2023-08-14 | Facility Study | ERCOT | Current status |
| Blackcat Storage | Matagorda | Battery | 201 | 2024-01-11 | Facility Study | ERCOT | Current status |
| Goldhill Energy Storage | Victoria | Battery | 201 | 2024-04-15 | Facility Study | ERCOT | Current status |
| Ruedrich BESS | Guadalupe | Battery | 201 | 2025-06-19 | Facility Study | ERCOT | Current status |
| Devine Mary BESS | Medina | Battery | 201 | 2025-07-07 | Facility Study | ERCOT | Current status |
| Englehardt BESS | Comal | Battery | 201 | 2025-09-22 | Facility Study | ERCOT | Current status |
| Barbara BESS | Nueces | Battery | 201 | 2025-09-22 | Facility Study | ERCOT | Current status |
| Erika Solar | Kaufman | Solar+Battery | 201 | 2022-07-25 | IA Executed | ERCOT | Current status |
| Bar Candela Solar SLF | Freestone | Solar+Battery | 200 | 2022-03-21 | IA Executed | ERCOT | Current status |
| Reunion Storage | Wilbarger | Solar+Battery | 200 | 2025-03-24 | Facility Study | ERCOT | Current status |
| Sagebrush Wind | Nolan | Wind | 200 | 2025-07-29 | Facility Study | ERCOT | Current status |
| Triangle Ranch Bravo | Cottle | Wind | 200 | 2022-10-06 | Facility Study | ERCOT | Current status |
| TEXAS SOLAR NOVA 3 | Kent | Solar | 200 | 2019-06-24 | Facility Study | ERCOT | Current status |
| GEN-2017-040 | Ochiltree | Solar | 200 | 2017-05-31 | IA Executed | OGE | Current status |
| Armadillo Solar | Navarro | Solar | 200 | 2019-08-28 | IA Executed | ERCOT | Current status |
| Co200B | El Paso | Battery | 200 | 2024-03-27 | IA Executed | El Paso Electric Company | Current status |
| J1849 | Hardin | Solar | 200 | 2021-11-30 | IA Pending | ENTERGY TEXAS, INC. | Current status |
| J2075 | Liberty | Solar | 200 | 2021-08-27 | IA Pending | ENTERGY TEXAS, INC. | Current status |
| J3169 | Hardin | Battery | 200 | 2022-09-14 | Cluster Study | MISO | Current status |
| GEN-2020-060 | Lubbock | Battery | 200 | 2020-04-30 | IA Pending | SPS | Current status |
| GEN-2020-081 | Rusk | Battery | 200 | 2020-04-30 | IA Executed | AEP | Current status |
| GEN-2021-038 | Titus | Battery | 200 | 2021-04-30 | Facility Study | AEP | Current status |
| GEN-2023-059 | Harrison | Solar+Gas | 200 | 2023-09-11 | Facility Study | AEP | Current status |
| GEN-2023-SR8 | Hansford | Battery | 200 | 2023-02-13 | IA Executed | Xcel | Current status |
| GEN-2024-229 | Wilbarger | Solar | 200 | 2025-03-01 | System Impact Study | AEP | Current status |
| Rodeo Solar | Andrews | Solar | 200 | 2017-06-29 | IA Executed | ERCOT | Current status |
| Anson Solar Center, Phase III | Jones | Solar | 200 | 2017-06-23 | Facility Study | ERCOT | Current status |
| Millers Branch Solar I | Haskell | Solar | 200 | 2019-12-17 | IA Executed | ERCOT | Current status |
| Stem Solar | Swisher | Solar | 200 | 2020-02-04 | Facility Study | ERCOT | Current status |
| PSE Flores TX Storage | Starr | Battery | 200 | 2022-12-15 | Facility Study | ERCOT | Current status |
| PSE Gongora Hill TX Storage | Starr | Battery | 200 | 2023-02-27 | Facility Study | ERCOT | Current status |
| PSE Chihuahua TX Storage | Hidalgo | Battery | 200 | 2022-12-07 | Facility Study | ERCOT | Current status |
| Borderland ESC | Hidalgo | Battery | 200 | 2022-02-21 | Facility Study | ERCOT | Current status |
| Monument Hill Solar | Fayette | Solar | 200 | 2023-10-13 | Facility Study | ERCOT | Current status |
| SunShiner ESS | Zavala | Battery | 200 | 2023-09-25 | Facility Study | ERCOT | Current status |
| Easy Battery Energy Storage Center | Schleicher | Wind+Battery | 200 | 2024-03-29 | Facility Study | ERCOT | Current status |
| Feather Dalea BESS | Glasscock | Battery | 200 | 2024-10-01 | Facility Study | ERCOT | Current status |
| Kresge Land Battery Storage | Galveston | Battery | 200 | 2025-03-24 | Facility Study | ERCOT | Current status |
| Biggs BESS | Mcculloch | Solar+Battery | 200 | 2024-07-22 | Facility Study | ERCOT | Current status |
| Rattlesnake Gap Wind SLF | Howard | Wind | 200 | 2025-09-22 | Facility Study | ERCOT | Current status |
| Monte Alto 2 Wind | Willacy | Wind | 200 | 2016-11-04 | IA Executed | ERCOT | Current status |
| Lane City Wind | Wharton | Wind | 200 | 2021-04-26 | IA Executed | ERCOT | Current status |
| Wi-Al-199SB | El Paso | Solar+Battery | 199 | 2025-06-10 | In Progress (unknown study) | El Paso Electric Company | Current status |
| Wi-Al2-199SB | El Paso | Solar+Battery | 199 | 2025-06-11 | In Progress (unknown study) | El Paso Electric Company | Current status |
| Wi-Al3-199SB | El Paso | Solar+Battery | 199 | 2025-06-13 | In Progress (unknown study) | El Paso Electric Company | Current status |
| GEN-2024-178 | Harrison | Battery | 199 | 2025-03-01 | System Impact Study | AEP | Current status |
| GEN-2024-355 | Lubbock | Battery | 199 | 2025-03-01 | System Impact Study | SPS | Current status |
| Pasture Rose Wind | Falls | Wind | 199 | 2025-03-24 | Facility Study | ERCOT | Current status |
| Percy Farm Solar | Matagorda | Solar | 199 | 2021-03-16 | Facility Study | ERCOT | Current status |
| J2071 | Hardin | Solar | 198 | 2021-09-14 | IA Pending | ENTERGY TEXAS, INC. | Current status |
| Cascabel Wind 2 | Zapata | Wind | 198 | 2023-03-13 | IA Executed | ERCOT | Current status |
| Cascabel Wind 1 | Zapata | Wind | 198 | 2023-03-13 | IA Executed | ERCOT | Current status |
| Barrosos Creek Wind 3 | Zapata | Wind | 198 | 2025-08-18 | Facility Study | ERCOT | Current status |
| Barrosos Creek Wind 4 | Zapata | Wind | 198 | 2025-08-18 | Facility Study | ERCOT | Current status |
| Wood Fern Wind | Van Zandt | Wind | 197 | 2025-01-31 | Facility Study | ERCOT | Current status |
| Loma Pinta Wind | La Salle | Wind | 197 | 2015-05-18 | IA Executed | ERCOT | Current status |
| Camino Santiago Solar | Milam | Solar | 196 | 2022-09-02 | IA Executed | ERCOT | Current status |
| Corralitos Wind 1 | Zapata | Wind | 196 | 2023-01-30 | IA Executed | ERCOT | Current status |
| Corralitos Wind 3 | Zapata | Wind | 196 | 2025-06-13 | Facility Study | ERCOT | Current status |
| GEN-2018-089 | Castro | Wind | 196 | 2018-11-21 | IA Executed | SPS | Current status |
| Wolf Spring Solar | Dickens | Solar+Battery | 196 | 2022-12-07 | IA Executed | ERCOT | Current status |
| Johnson Grass Solar | Mitchell | Solar | 196 | 2024-10-01 | Facility Study | ERCOT | Current status |
| Corralitos Wind 2 | Zapata | Wind | 195 | 2023-01-30 | IA Executed | ERCOT | Current status |
| Corralitos Wind 4 | Zapata | Wind | 195 | 2025-06-13 | Facility Study | ERCOT | Current status |
| Tres Bahias Solar | Calhoun | Solar | 195 | 2019-03-26 | IA Executed | ERCOT | Current status |
| Paloma Energy Center | Colorado | Solar+Battery | 194 | 2024-02-07 | Facility Study | ERCOT | Current status |
| Steelhead Energy Storage | Fannin | Battery | 192 | 2024-02-07 | Facility Study | ERCOT | Current status |
| Argenta Storage | Bee | Solar+Battery | 192 | 2022-06-27 | IA Executed | ERCOT | Current status |
| Malachite BESS | Wharton | Solar+Battery | 191 | 2024-05-20 | Facility Study | ERCOT | Current status |
| Pecos Wind | Pecos | Wind+Battery | 191 | 2025-07-07 | Facility Study | ERCOT | Current status |
| Accalia Point Solar | Cameron | Solar | 191 | 2020-10-23 | Facility Study | ERCOT | Current status |
| Bullring Wind 3 | Starr | Wind | 190 | 2024-05-09 | IA Executed | ERCOT | Current status |
| Harryoung Solar | Cameron | Solar+Battery | 190 | 2022-11-23 | Facility Study | ERCOT | Current status |
| HarryoungBESS | Cameron | Solar+Battery | 190 | 2023-10-04 | Facility Study | ERCOT | Current status |
| Crowded Star Solar II | Jones | Solar+Battery | 190 | 2020-03-26 | IA Executed | ERCOT | Current status |
| Chacon Creek | Medina | Battery | 189 | 2024-03-22 | Facility Study | ERCOT | Current status |
| Blanket Ranch North Solar | Brown | Solar+Battery | 189 | 2022-06-10 | Facility Study | ERCOT | Current status |
| Timmerman Power Plant Phase 2 | Caldwell | Gas | 188 | 2023-09-22 | IA Executed | ERCOT | Current status |
| Serrano Storage | Maverick | Battery | 186 | 2023-09-23 | Facility Study | ERCOT | Current status |
| Wetzel BESS | Brown | Battery | 186 | 2023-03-27 | Facility Study | ERCOT | Current status |
| Montezuma Storage | Colorado | Battery | 185 | 2025-09-22 | Facility Study | ERCOT | Current status |
| Los Vientos IB Repower | Willacy | Wind | 185 | 2024-07-22 | Facility Study | ERCOT | Current status |
| Malachite Solar | Wharton | Solar+Battery | 185 | 2024-02-27 | Facility Study | ERCOT | Current status |
| Maldives Solar | Scurry | Solar | 184 | 2023-07-18 | IA Executed | ERCOT | Current status |
| Cairos Storage 2 | Kinney | Battery | 184 | 2024-07-01 | Facility Study | ERCOT | Current status |
| Arroyo Storage | Cameron | Solar+Battery | 184 | 2022-05-10 | IA Executed | ERCOT | Current status |
| Jalisco Peaker | Nueces | Gas | 184 | 2024-08-16 | Facility Study | ERCOT | Current status |
| Leighton Solar SLF | Limestone | Solar | 183 | 2022-05-11 | IA Executed | ERCOT | Current status |
| Basketflower Solar | Eastland | Solar+Battery | 183 | 2024-10-29 | Facility Study | ERCOT | Current status |
| Maryneal Wind | Nolan | Wind | 182 | 2016-05-26 | IA Executed | ERCOT | Current status |
| Lan Solar SLF | Lamar | Solar+Battery | 182 | 2020-05-01 | Facility Study | ERCOT | Current status |
| High Noon Solar | Hill | Solar+Battery | 182 | 2021-11-03 | IA Executed | ERCOT | Current status |
| Caesar Solar | Borden | Solar+Battery | 182 | 2025-07-29 | Facility Study | ERCOT | Current status |
| Nanulak BESS | Reeves | Battery | 182 | 2024-03-22 | Facility Study | ERCOT | Current status |
| Azalea Springs Solar | Angelina | Solar | 181 | 2017-07-26 | IA Executed | ERCOT | Current status |
| Oriana Solar | Victoria | Solar+Battery | 181 | 2021-08-25 | IA Executed | ERCOT | Current status |
| Oak Belt Solar | Victoria | Solar+Battery | 181 | 2025-12-23 | Facility Study | ERCOT | Current status |
| Turkey Creek Solar SLF | Kinney | Solar+Battery | 181 | 2024-02-26 | Facility Study | ERCOT | Current status |
| Frizzle BESS | Ward | Battery | 181 | 2025-09-11 | Facility Study | ERCOT | Current status |
| Nightfall Solar | Uvalde | Solar | 181 | 2019-05-10 | IA Executed | ERCOT | Current status |
| Hofbrau BESS | Tom Green | Battery | 181 | 2021-09-22 | Facility Study | ERCOT | Current status |
| Amphion Solar Phase 1 | Atascosa | Solar | 181 | 2024-10-10 | Facility Study | ERCOT | Current status |
| Brazos River BESS | Brazoria | Battery | 180 | 2023-10-04 | IA Executed | ERCOT | Current status |
| WILDWIND | Cooke | Wind | 180 | 2017-10-18 | IA Executed | ERCOT | Current status |
| J2689 | Liberty | Solar+Battery | 180 | 2025-07-31 | Cluster Study | ENTERGY TEXAS, INC. | Current status |
| GEN-2019-065 | Smith | Battery | 180 | 2019-05-23 | IA Pending | AEP | Current status |
| GEN-2022-038 | Harrison | Solar | 180 | 2022-06-23 | Facility Study | AEP | Current status |
| Water Valley Wind Energy | Tom Green | Wind | 180 | 2019-01-15 | IA Executed | ERCOT | Current status |
| Scarlet Solar | Castro | Solar | 180 | 2019-12-11 | Facility Study | ERCOT | Current status |
| Indigo solar 2 | Fisher | Solar+Battery | 180 | 2023-10-04 | Facility Study | ERCOT | Current status |
| Proteus Thornton Ranch Solar SLF | Ward | Solar+Battery | 180 | 2024-02-26 | Facility Study | ERCOT | Current status |
| Whitetail BESS | Mitchell | Battery | 180 | 2024-02-27 | Facility Study | ERCOT | Current status |
| Amberjack2 BESS | Cameron | Battery | 180 | 2025-01-28 | Facility Study | ERCOT | Current status |
| Green Ocelot Storage | Kenedy | Solar+Battery | 179 | 2025-01-28 | Facility Study | ERCOT | Current status |
| Longfellow Solar I | Pecos | Solar+Battery | 178 | 2022-11-07 | IA Executed | ERCOT | Current status |
| Millers Branch Solar II | Haskell | Solar | 178 | 2021-11-04 | IA Executed | ERCOT | Current status |
| Saddle Horn Station BESS SLF | Comanche | Solar+Battery | 177 | 2024-09-04 | Facility Study | ERCOT | Current status |
| Willis Storage | Rains | Battery | 176 | 2023-03-27 | IA Executed | ERCOT | Current status |
| McMurtre Storage | Hunt | Battery | 176 | 2023-03-13 | Facility Study | ERCOT | Current status |
| Brotherton Storage | Anderson | Battery | 176 | 2023-04-19 | IA Executed | ERCOT | Current status |
| Rowdy Creek BESS | Lamar | Solar+Battery | 176 | 2022-01-28 | IA Executed | ERCOT | Current status |
| Yooperlite Storage | Wise | Battery | 176 | 2023-06-28 | Facility Study | ERCOT | Current status |
| Grandfalls Solar | Upton | Solar+Battery | 176 | 2016-05-24 | IA Executed | ERCOT | Current status |
| Hackberry Creek Solar | Mitchell | Solar | 176 | 2023-07-31 | IA Executed | ERCOT | Current status |
| Sol Marina Energy Center | Ellis | Solar+Battery | 175 | 2023-10-25 | IA Executed | ERCOT | Current status |
| J2629 | Newton | Solar | 175 | 2022-09-14 | Cluster Study | ENTERGY TEXAS, INC. | Current status |
| GEN-2023-193 | Harrison | Solar+Battery | 175 | 2023-10-02 | Facility Study | AEP | Current status |
| Eligius BESS | Hidalgo | Battery | 175 | 2025-02-25 | Facility Study | ERCOT | Current status |
| Saddle Horn Station Solar SLF | Comanche | Solar+Battery | 175 | 2024-09-04 | Facility Study | ERCOT | Current status |
| Coastal Bayou Storage | Harris | Battery | 175 | 2024-09-04 | Facility Study | ERCOT | Current status |
| Cold Creek Storage 2 | Schleicher | Solar+Battery | 174 | 2023-12-04 | IA Executed | ERCOT | Current status |
| Pethrus BESS | Wichita | Battery | 174 | 2023-09-23 | Facility Study | ERCOT | Current status |
| Honey Mesquite Wind Farm | Glasscock | Wind | 174 | 2024-03-22 | IA Executed | ERCOT | Current status |
| Bluebonnet Prairie Wind | Navarro | Wind | 173 | 2022-12-07 | IA Executed | ERCOT | Current status |
| Wagon Timber Solar | Knox | Solar+Battery | 172 | 2024-12-19 | Facility Study | ERCOT | Current status |
| Concho Pearl Solar | Concho | Solar+Battery | 172 | 2022-12-07 | IA Executed | ERCOT | Current status |
| Yellow Viking Solar | Somervell | Solar | 171 | 2020-10-23 | IA Executed | ERCOT | Current status |
| Coneflower Storage Project | Chambers | Battery | 171 | 2021-12-20 | IA Executed | ERCOT | Current status |
| MRG GOODY SOLAR | Lamar | Solar+Battery | 171 | 2021-03-16 | IA Executed | ERCOT | Current status |
| Sullivan Solar | Hidalgo | Solar+Battery | 171 | 2024-03-22 | Facility Study | ERCOT | Current status |
| Seven Springs Storage | Lampasas | Solar+Battery | 171 | 2024-04-09 | Facility Study | ERCOT | Current status |
| Tokio Solar | Mclennan | Solar | 170 | 2021-08-12 | IA Executed | ERCOT | Current status |
| J2754 | Polk | Solar | 170 | 2022-09-15 | Cluster Study | ENTERGY TEXAS, INC. | Current status |
| JUNIPERUS BESS | Hopkins | Solar+Battery | 170 | 2023-10-30 | Facility Study | ERCOT | Current status |
| Fagus Solar Park 3 SLF | Childress | Solar+Battery | 170 | 2024-06-03 | IA Executed | ERCOT | Current status |
| Buffalo Gap 3 Wind Repower | Taylor | Wind | 168 | 2024-12-03 | IA Executed | ERCOT | Current status |
| Donna Solar | Hidalgo | Solar+Battery | 168 | 2024-03-22 | Facility Study | ERCOT | Current status |
| Jalisco Cogen | Nueces | Gas | 168 | 2024-08-16 | Facility Study | ERCOT | Current status |
| Bell Song Solar | Jim Hogg | Solar | 168 | 2025-06-12 | Facility Study | ERCOT | Current status |
| Bell Song Solar 2 | Jim Hogg | Solar | 168 | 2025-06-12 | Facility Study | ERCOT | Current status |
| Bell Song Solar 3 | Jim Hogg | Solar | 168 | 2025-06-19 | Facility Study | ERCOT | Current status |
| Fagus Solar Park 2 SLF | Childress | Solar+Battery | 167 | 2024-06-03 | IA Executed | ERCOT | Current status |
| Fagus Solar Park 1 SLF | Childress | Solar+Battery | 166 | 2018-05-15 | IA Executed | ERCOT | Current status |
| LONE STAR INDUSTRIAL PARK GAS POWER PROJECT | Morris | Gas | 166 | 2024-09-04 | Facility Study | ERCOT | Current status |
| J1442 | Polk | Solar | 165 | 2019-04-29 | Construction | ENTERGY TEXAS, INC. | Current status |
| Houston IV BESS | Harris | Battery | 165 | 2023-07-10 | IA Executed | ERCOT | Current status |
| DOS RIOS ENERGY STORAGE SLF | Milam | Battery | 165 | 2022-11-15 | IA Executed | ERCOT | Current status |
| Zeppelin Energy Storage | Tom Green | Battery | 164 | 2023-01-30 | Facility Study | ERCOT | Current status |
| Dove Creek Solar | Tom Green | Solar+Battery | 164 | 2024-07-22 | Facility Study | ERCOT | Current status |
| BRP Pollux BESS | Bosque | Battery | 163 | 2022-01-06 | Facility Study | ERCOT | Current status |
| Dove Creek Storage | Tom Green | Solar+Battery | 163 | 2024-07-22 | Facility Study | ERCOT | Current status |
| Concho Pearl Storage | Concho | Solar+Battery | 162 | 2022-12-15 | IA Executed | ERCOT | Current status |
| Lupinus Solar 1 | Franklin | Solar+Battery | 162 | 2021-12-08 | IA Executed | ERCOT | Current status |
| Harald (BearKat Wind B) | Glasscock | Wind | 162 | 2013-11-27 | IA Executed | ERCOT | Current status |
| Aster Solar | Guadalupe | Solar | 161 | 2021-09-21 | Facility Study | ERCOT | Current status |
| Solgen Solar | Lampasas | Solar+Battery | 160 | 2025-04-25 | Facility Study | ERCOT | Current status |
| GEN-2024-122 | Marion | Solar+Battery | 160 | 2025-03-01 | System Impact Study | AEP | Current status |
| Albatross BESS 2 | Mclennan | Battery | 160 | 2024-02-27 | Facility Study | ERCOT | Current status |
| Middlebrook BESS | Nacogdoches | Solar+Battery | 159 | 2022-10-24 | IA Executed | ERCOT | Current status |
| High Plains Storage | Harris | Battery | 158 | 2022-09-02 | Facility Study | ERCOT | Current status |
| Stargazer Solar | Brazoria | Solar+Battery | 158 | 2023-10-30 | Facility Study | ERCOT | Current status |
| Pecan BESS | Leon | Battery | 157 | 2023-10-25 | Facility Study | ERCOT | Current status |
| Otter BESS | Bexar | Battery | 157 | 2024-02-27 | Facility Study | ERCOT | Current status |
| Cartwheel BESS 2 | Hopkins | Battery | 157 | 2022-06-02 | Facility Study | ERCOT | Current status |
| Strawberry Acres Storage | Wilson | Battery | 157 | 2022-11-23 | Facility Study | ERCOT | Current status |
| Coyote Den Storage | Karnes | Battery | 157 | 2024-02-07 | Facility Study | ERCOT | Current status |
| Austin Bayou Storage II | Brazoria | Solar+Battery | 157 | 2023-03-08 | IA Executed | ERCOT | Current status |
| Austin Bayou Storage III | Brazoria | Solar+Battery | 157 | 2023-03-08 | IA Executed | ERCOT | Current status |
| Firefly Fields Storage | Colorado | Solar+Battery | 157 | 2025-03-24 | Facility Study | ERCOT | Current status |
| Purple Sage BESS 1 | Collin | Battery | 156 | 2023-03-08 | IA Executed | ERCOT | Current status |
| Purple Sage BESS 2 | Collin | Battery | 156 | 2023-03-08 | IA Executed | ERCOT | Current status |
| Chimney Rock BESS | Taylor | Battery | 156 | 2025-02-14 | Facility Study | ERCOT | Current status |
| Jackalope Solar | San Patricio | Solar | 156 | 2021-02-09 | IA Executed | ERCOT | Current status |
| Short Creek BESS | Wichita | Solar+Battery | 156 | 2023-04-19 | Facility Study | ERCOT | Current status |
| Antonio Road BESS | Bastrop | Battery | 156 | 2023-10-13 | Facility Study | ERCOT | Current status |
| SOSA Storage | Madison | Battery | 155 | 2022-07-25 | IA Executed | ERCOT | Current status |
| Salt-Lick Storage | Culberson | Solar+Battery | 155 | 2024-10-10 | Facility Study | ERCOT | Current status |
| Winters Glow Storage | Runnels | Solar+Battery | 155 | 2024-10-29 | Facility Study | ERCOT | Current status |
| Ranger BESS | Medina | Battery | 155 | 2025-06-12 | Facility Study | ERCOT | Current status |
| Bowstring BESS | San Patricio | Battery | 155 | 2020-11-18 | IA Executed | ERCOT | Current status |
| Galaxy Storage | Ellis | Solar+Battery | 155 | 2024-03-22 | Facility Study | ERCOT | Current status |
| Dorsey Road BESS | Bexar | Battery | 155 | 2025-03-06 | Facility Study | ERCOT | Current status |
| Berryman Road Storage | Archer | Battery | 155 | 2025-06-05 | Facility Study | ERCOT | Current status |
| Gunnar BESS | Hidalgo | Battery | 155 | 2023-02-09 | IA Executed | ERCOT | Current status |
| SunWave Solar | Nueces | Solar | 154 | 2023-05-26 | Facility Study | ERCOT | Current status |
| Roble BESS | Guadalupe | Battery | 154 | 2024-08-16 | Facility Study | ERCOT | Current status |
| Bastion BESS | Matagorda | Battery | 154 | 2025-07-07 | Facility Study | ERCOT | Current status |
| Valcrest BESS | Galveston | Battery | 154 | 2025-12-17 | Facility Study | ERCOT | Current status |
| Cartwheel BESS 1 | Hopkins | Battery | 154 | 2022-06-02 | IA Executed | ERCOT | Current status |
| Crowned Heron BESS | Fort Bend | Battery | 154 | 2022-07-18 | IA Executed | ERCOT | Current status |
| Crowned Heron BESS 2 | Fort Bend | Battery | 154 | 2022-11-23 | IA Executed | ERCOT | Current status |
| Pavo Creek Storage | Milam | Battery | 154 | 2025-02-25 | Facility Study | ERCOT | Current status |
| Quarter Ranch Solar | Zapata | Solar | 154 | 2021-07-13 | Facility Study | ERCOT | Current status |
| Badger BESS | Upton | Solar+Battery | 154 | 2025-02-12 | Facility Study | ERCOT | Current status |
| Dori BQ BESS | Harris | Solar+Battery | 154 | 2022-02-07 | IA Executed | ERCOT | Current status |
| Maderagemela BESS1 | Waller | Battery | 154 | 2024-02-27 | Facility Study | ERCOT | Current status |
| Pamplona Storage | Austin | Solar+Battery | 154 | 2024-12-19 | Facility Study | ERCOT | Current status |
| Blanco County Behrends Storage | Blanco | Battery | 154 | 2024-12-19 | Facility Study | ERCOT | Current status |
| Whiskey BESS | Van Zandt | Battery | 154 | 2022-12-07 | IA Executed | ERCOT | Current status |
| Leon BESS | Houston | Solar+Battery | 154 | 2024-11-26 | Facility Study | ERCOT | Current status |
| Wichita County Mawson Storage | Wichita | Battery | 154 | 2024-12-19 | Facility Study | ERCOT | Current status |
| Zorro BESS | Van Zandt | Battery | 154 | 2023-03-27 | IA Executed | ERCOT | Current status |
| Bonaparte BESS | Lee | Battery | 154 | 2023-11-14 | Facility Study | ERCOT | Current status |
| Kit Fox Storage | Henderson | Battery | 154 | 2023-03-13 | Facility Study | ERCOT | Current status |
| Anson BAT | Jones | Solar+Battery | 154 | 2020-12-03 | IA Executed | ERCOT | Current status |
| Palisade BESS | Brazoria | Battery | 154 | 2025-09-23 | Facility Study | ERCOT | Current status |
| GRIMES SOLAR | Grimes | Solar | 153 | 2022-03-14 | Facility Study | ERCOT | Current status |
| THUNDER ROAD ENERGY STORAGE | Dallas | Battery | 153 | 2021-10-22 | Facility Study | ERCOT | Current status |
| Bufflehead BESS | Collin | Battery | 153 | 2022-03-07 | IA Executed | ERCOT | Current status |
| Dionysus Solar | Houston | Solar+Battery | 153 | 2023-06-28 | Facility Study | ERCOT | Current status |
| Cairos Solar | Kinney | Solar+Battery | 153 | 2023-10-04 | Facility Study | ERCOT | Current status |
| Pradera Storage | Webb | Solar+Battery | 153 | 2021-01-25 | Facility Study | ERCOT | Current status |
| Senator Aggreko Storage | Maverick | Solar+Battery | 153 | 2023-11-14 | Facility Study | ERCOT | Current status |
| Silver Dollar Storage | Freestone | Solar+Battery | 153 | 2024-06-03 | Facility Study | ERCOT | Current status |
| Eighteenmile Solar SLF | Goliad | Solar+Battery | 153 | 2021-08-18 | Facility Study | ERCOT | Current status |
| Damia Storage | Eastland | Solar+Battery | 153 | 2025-04-01 | Facility Study | ERCOT | Current status |
| Headcamp Energy Storage Plant | Pecos | Battery | 153 | 2021-12-03 | IA Executed | ERCOT | Current status |
| Fluvanna Max Solar SLF | Scurry | Solar+Battery | 153 | 2024-12-19 | Facility Study | ERCOT | Current status |
| Palomino Storage | Hopkins | Solar+Battery | 153 | 2024-11-19 | Facility Study | ERCOT | Current status |
| El Patrimonio Solar | Bexar | Solar | 152 | 2021-03-16 | IA Executed | ERCOT | Current status |
| Tejano Storage | Victoria | Battery | 152 | 2022-03-30 | Facility Study | ERCOT | Current status |
| Jaguarundi Energy Storage | Nolan | Battery | 152 | 2025-06-05 | Facility Study | ERCOT | Current status |
| Palladium Storage | Hidalgo | Battery | 152 | 2022-02-28 | Facility Study | ERCOT | Current status |
| Two Brothers ESS | Victoria | Battery | 152 | 2022-09-15 | IA Executed | ERCOT | Current status |
| Rock N' Roll Solar SLF | Brazoria | Solar+Battery | 152 | 2021-05-10 | Facility Study | ERCOT | Current status |
| Pink Solar | Hunt | Solar | 152 | 2020-01-30 | IA Executed | ERCOT | Current status |
| GEN-2017-146 | Castro | Wind | 152 | 2017-11-27 | IA Executed | SPS | Current status |
| Eliza Solar | Kaufman | Solar | 152 | 2019-06-21 | IA Executed | ERCOT | Current status |
| Kuy Creek Storage 1 SLF | Goliad | Solar+Battery | 151 | 2025-03-24 | Facility Study | ERCOT | Current status |
| Windmill Ridge Storage | Brazoria | Battery | 151 | 2023-11-14 | Facility Study | ERCOT | Current status |
| McGee Storage | Henderson | Battery | 151 | 2022-11-15 | IA Executed | ERCOT | Current status |
| GPlains Solar | Ector | Solar+Battery | 151 | 2025-04-21 | Facility Study | ERCOT | Current status |
| Ulysses Solar | Coke | Solar | 151 | 2019-01-25 | IA Executed | ERCOT | Current status |
| GOTHAM BESS | Nueces | Battery | 151 | 2023-07-31 | Facility Study | ERCOT | Current status |
| Violet Storage | Nueces | Battery | 151 | 2022-05-10 | Facility Study | ERCOT | Current status |
| Rocky Point BESS | Coke | Battery | 151 | 2024-07-30 | Facility Study | ERCOT | Current status |
| Padua Grid BESS Unit 2 | Bexar | Battery | 151 | 2023-06-07 | IA Executed | ERCOT | Current status |
| Bluebonnet Trail Solar | Ellis | Solar | 151 | 2024-12-19 | Facility Study | ERCOT | Current status |
| Maleza Storage | Wharton | Solar+Battery | 151 | 2019-10-31 | Facility Study | ERCOT | Current status |
| Wizard BESS | Galveston | Battery | 151 | 2023-03-27 | IA Executed | ERCOT | Current status |
| New Shepherd Solar | Karnes | Solar | 151 | 2024-01-11 | Facility Study | ERCOT | Current status |
| Pollo Pinto Solar | Palo Pinto | Solar | 151 | 2024-02-27 | Facility Study | ERCOT | Current status |
| Field Marshal Storage | Erath | Battery | 151 | 2025-03-24 | Facility Study | ERCOT | Current status |
| Pecan Ridge | Mcculloch | Battery | 151 | 2025-12-17 | Facility Study | ERCOT | Current status |
| Amerada Storage | Freestone | Solar+Battery | 151 | 2023-05-15 | Facility Study | ERCOT | Current status |
| Goldfinch Solar | Van Zandt | Solar+Battery | 151 | 2023-09-22 | Facility Study | ERCOT | Current status |
| Darkwood Solar | Comanche | Solar+Battery | 151 | 2023-06-28 | Facility Study | ERCOT | Current status |
| Greyhound Solar - Phase E | Ector | Solar | 151 | 2025-04-17 | IA Executed | ERCOT | Current status |
| Pinewood Solar | Brazoria | Solar | 151 | 2022-09-02 | IA Executed | ERCOT | Current status |
| Austin Bayou Storage I | Brazoria | Solar+Battery | 151 | 2023-03-08 | IA Executed | ERCOT | Current status |
| Claxton Solar | Hopkins | Solar | 151 | 2022-09-21 | IA Executed | ERCOT | Current status |
| Stockyard Grid Batt | Tarrant | Battery | 151 | 2020-01-13 | IA Executed | ERCOT | Current status |
| Eastbell Milam Solar II | Milam | Solar | 151 | 2022-03-07 | IA Executed | ERCOT | Current status |
| Bottom Grass BESS II | Colorado | Solar+Battery | 151 | 2022-11-07 | Facility Study | ERCOT | Current status |
| Skipjack Energy Storage | Brazoria | Battery | 151 | 2023-07-31 | IA Executed | ERCOT | Current status |
| Trojan Solar SLF | Cooke | Solar+Battery | 151 | 2021-07-01 | IA Executed | ERCOT | Current status |
| Macho Creek BESS | Starr | Battery | 151 | 2023-06-28 | Facility Study | ERCOT | Current status |
| Driet BESS | Colorado | Battery | 151 | 2023-06-07 | Facility Study | ERCOT | Current status |
| Cape Rich BESS | Navarro | Battery | 151 | 2023-07-10 | IA Executed | ERCOT | Current status |
| Mountain Springs BESS | Cooke | Battery | 151 | 2023-10-04 | Facility Study | ERCOT | Current status |
| Stewart Grady BESS | Martin | Battery | 151 | 2023-05-26 | Facility Study | ERCOT | Current status |
| Darkwood BESS | Comanche | Solar+Battery | 151 | 2023-06-07 | Facility Study | ERCOT | Current status |
| Dunlay Solar | Medina | Solar | 151 | 2024-03-22 | Facility Study | ERCOT | Current status |
| Realitos Solar SLF | Duval | Solar+Battery | 150 | 2023-09-07 | Facility Study | ERCOT | Current status |
| Yorktown BESS | Dewitt | Battery | 150 | 2023-10-25 | Facility Study | ERCOT | Current status |
| Bocanova Power II | Brazoria | Battery | 150 | 2024-10-10 | IA Executed | ERCOT | Current status |
| Cashel BESS | Schleicher | Battery | 150 | 2024-10-29 | Facility Study | ERCOT | Current status |
| Hawkins BESS | Hidalgo | Battery | 150 | 2023-05-03 | Facility Study | ERCOT | Current status |
| Thunderbird Valley Storage | Young | Battery | 150 | 2024-11-19 | Facility Study | ERCOT | Current status |
| Oriole BES | Knox | Solar+Battery | 150 | 2023-05-15 | Facility Study | ERCOT | Current status |
| Solgen Storage | Lampasas | Solar+Battery | 150 | 2025-04-25 | Facility Study | ERCOT | Current status |
| Cherry Sage Storage 1 SLF | Concho | Solar+Battery | 150 | 2025-04-25 | Facility Study | ERCOT | Current status |
| Sf150SB | El Paso | Solar+Battery | 150 | 2024-03-28 | IA Executed | El Paso Electric Company | Current status |
| Ea150B | El Paso | Battery | 150 | 2025-06-04 | In Progress (unknown study) | El Paso Electric Company | Current status |
| J1671 | Walker | Solar | 150 | 2020-06-23 | Construction | ENTERGY TEXAS, INC. | Current status |
| J2314 | Liberty | Solar | 150 | 2021-09-10 | IA Pending | ENTERGY TEXAS, INC. | Current status |
| J2897 | San Jacinto | Solar+Battery | 150 | 2022-09-15 | Cluster Study | ENTERGY TEXAS, INC. | Current status |
| J4103 | Trinity | Battery | 150 | 2025-10-06 | EAST TEXAS ELECTRIC COOPERATIVE, INC. | Current status | |
| GEN-2017-187 | Terry | Solar | 150 | 2017-11-30 | IA Executed | SPS | Current status |
| GEN-2018-003 | Bowie | Solar | 150 | 2018-04-25 | IA Executed | AEP | Current status |
| GEN-2022-111 | Marion | Solar+Battery | 150 | 2023-02-10 | Facility Study | AEP | Current status |
| GEN-2023-GR5 | Lamb | Solar | 150 | 2023-07-18 | IA Executed | Xcel/SPS | Current status |
| Indigo Solar | Fisher | Solar+Battery | 150 | 2018-09-27 | IA Executed | ERCOT | Current status |
| Charolais Storage | Matagorda | Solar+Battery | 150 | 2021-02-09 | Facility Study | ERCOT | Current status |
| PEREGRINE BESS | Goliad | Solar+Battery | 150 | 2021-02-10 | Facility Study | ERCOT | Current status |
| San Perlita BESS 1 | Willacy | Battery | 150 | 2022-06-02 | Facility Study | ERCOT | Current status |
| San Perlita BESS 2 | Willacy | Battery | 150 | 2022-06-02 | Facility Study | ERCOT | Current status |
| Triple B Solar Alt#2 | Lampasas | Solar | 150 | 2021-06-10 | Facility Study | ERCOT | Current status |
| PHOTO BESS 2 | Uvalde | Solar+Battery | 150 | 2021-10-29 | Facility Study | ERCOT | Current status |
| Solara BESS 1 | Jones | Battery | 150 | 2022-07-05 | Facility Study | ERCOT | Current status |
| Solara BESS 2 | Jones | Battery | 150 | 2022-07-05 | Facility Study | ERCOT | Current status |
| ELECTRODE BESS | Upton | Battery | 150 | 2022-07-25 | Facility Study | ERCOT | Current status |
| CATHODE BESS | Upton | Battery | 150 | 2022-08-05 | Facility Study | ERCOT | Current status |
| Peregrine BESS 2 | Goliad | Solar+Battery | 150 | 2022-08-05 | Facility Study | ERCOT | Current status |
| Photo Solar 1 | Uvalde | Solar+Battery | 150 | 2022-09-15 | Facility Study | ERCOT | Current status |
| Nickel Spruce Solar | Leon | Solar | 150 | 2023-01-30 | Facility Study | ERCOT | Current status |
| Marshall Spring Solar | Gillespie | Solar+Battery | 150 | 2023-02-20 | Facility Study | ERCOT | Current status |
| Marshall Spring Storage | Gillespie | Solar+Battery | 150 | 2023-02-20 | Facility Study | ERCOT | Current status |
| Ranchero BESS | Crockett | Battery | 150 | 2023-06-28 | Facility Study | ERCOT | Current status |
| Midfield PV Project SLF | Matagorda | Solar+Battery | 150 | 2023-12-04 | Facility Study | ERCOT | Current status |
| PALO VERDE BESS | San Patricio | Wind+Battery | 150 | 2024-04-15 | Facility Study | ERCOT | Current status |
| Daystar Solar | Karnes | Solar | 150 | 2024-04-15 | Facility Study | ERCOT | Current status |
| Star Grass Renewable Energy Solar SLF | Eastland | Solar+Battery | 150 | 2025-02-14 | Facility Study | ERCOT | Current status |
| Cannibal Draw Solar | Glasscock | Solar+Battery | 150 | 2024-07-01 | IA Executed | ERCOT | Current status |
| Ponferrada Solar | Navarro | Solar | 149 | 2024-10-01 | Facility Study | ERCOT | Current status |
| Rogers Draw BESS | Gillespie | Battery | 149 | 2023-01-03 | IA Executed | ERCOT | Current status |
| La Casa Wind | Stephens | Wind | 148 | 2018-12-28 | IA Executed | ERCOT | Current status |
| Cosper Solar | Bell | Solar | 148 | 2023-01-03 | IA Executed | ERCOT | Current status |
| Galaxy Solar | Ellis | Solar+Battery | 148 | 2024-03-22 | Facility Study | ERCOT | Current status |
| Rain Lily Solar 1 | Hood | Solar+Battery | 148 | 2025-02-25 | Facility Study | ERCOT | Current status |
| John Bull BESS | Nueces | Battery | 147 | 2023-07-31 | Facility Study | ERCOT | Current status |
| Chisme Solar | Brown | Solar+Battery | 147 | 2023-01-17 | Facility Study | ERCOT | Current status |
| Neal Solar | Wharton | Solar+Battery | 147 | 2025-05-27 | Facility Study | ERCOT | Current status |
| Dundee West Wind | Wilbarger | Wind | 146 | 2023-01-03 | IA Executed | ERCOT | Current status |
| Wensowitch Solar | Navarro | Solar | 146 | 2022-01-07 | Facility Study | ERCOT | Current status |
| Chisme Storage | Brown | Solar+Battery | 146 | 2023-01-17 | Facility Study | ERCOT | Current status |
| Moonstone Solar Project | Wilson | Solar | 146 | 2021-10-27 | IA Executed | ERCOT | Current status |
| J2165 | Liberty | Solar | 145 | 2021-11-03 | IA Pending | ENTERGY TEXAS, INC. | Current status |
| Seven Springs Solar | Lampasas | Solar+Battery | 145 | 2023-09-22 | IA Executed | ERCOT | Current status |
| Wang Solar SLF | Falls | Solar+Battery | 145 | 2018-06-14 | Facility Study | ERCOT | Current status |
| Gaia Solar | Navarro | Solar+Battery | 144 | 2021-12-29 | IA Executed | ERCOT | Current status |
| Starling Solar | Gonzales | Solar+Battery | 144 | 2020-06-26 | IA Executed | ERCOT | Current status |
| Starling Solar | Gonzales | Solar+Battery | 144 | 2022-10-06 | Facility Study | ERCOT | Current status |
| FRIENDSWOOD ENERGY GENCO | Harris | Gas | 144 | 2022-12-07 | IA Executed | ERCOT | Current status |
| Rio Star Energy Storage | Wichita | Battery | 144 | 2025-02-14 | Facility Study | ERCOT | Current status |
| City Breeze BESS | Matagorda | Battery | 143 | 2022-12-15 | IA Executed | ERCOT | Current status |
| CH Solterra LLC | Hopkins | Solar | 143 | 2021-03-19 | Facility Study | ERCOT | Current status |
| Summerhill BESS | Taylor | Battery | 143 | 2025-02-14 | Facility Study | ERCOT | Current status |
| GIBSON BRANCH BESS | Lampasas | Battery | 143 | 2024-05-20 | Facility Study | ERCOT | Current status |
| Spindletop Storage | Nacogdoches | Solar+Battery | 143 | 2024-07-30 | IA Executed | ERCOT | Current status |
| Cherry Sage Solar 1 SLF | Concho | Solar+Battery | 143 | 2025-04-25 | Facility Study | ERCOT | Current status |
| GEN-2024-376 | Sabine | Solar | 142 | 2025-03-01 | System Impact Study | ETEC | Current status |
| Monte Alto I | Willacy | Wind | 142 | 2016-11-04 | IA Executed | ERCOT | Current status |
| Rhoda Storage | Milam | Battery | 141 | 2022-04-18 | Facility Study | ERCOT | Current status |
| Blue Jay Solar | Grimes | Solar | 141 | 2017-05-30 | IA Executed | ERCOT | Current status |
| Brizo BESS | Victoria | Battery | 141 | 2021-10-05 | IA Executed | ERCOT | Current status |
| Invictus Energy Storage | Coleman | Battery | 141 | 2024-01-03 | Facility Study | ERCOT | Current status |
| ERAS-2025-036 | Potter | Battery | 140 | 2025-10-02 | In Progress (unknown study) | SPS | Current status |
| Bonham Solar SLF | Limestone | Solar+Battery | 138 | 2022-11-15 | IA Executed | ERCOT | Current status |
| Demeter Storage 2 | Caldwell | Solar+Battery | 138 | 2024-10-01 | Facility Study | ERCOT | Current status |
| Skull Creek Solar | Anderson | Solar | 137 | 2021-05-28 | IA Executed | ERCOT | Current status |
| Sword Solar | Starr | Solar+Battery | 137 | 2024-03-22 | Facility Study | ERCOT | Current status |
| Starr Solar Ranch | Starr | Solar+Battery | 137 | 2018-11-07 | IA Executed | ERCOT | Current status |
| Turtle Rock Storage | Freestone | Battery | 136 | 2024-05-09 | Facility Study | ERCOT | Current status |
| Vial BESS | Hill | Battery | 135 | 2022-07-05 | IA Executed | ERCOT | Current status |
| Stonewall BESS | Stonewall | Solar+Battery | 135 | 2025-02-25 | Facility Study | ERCOT | Current status |
| Giga Texas Data Center | Travis | Battery | 133 | 2024-08-27 | IA Executed | ERCOT | Current status |
| Millers Branch Solar III | Haskell | Solar | 133 | 2024-08-16 | IA Executed | ERCOT | Current status |
| Pham BESS | Anderson | Battery | 133 | 2024-06-13 | Facility Study | ERCOT | Current status |
| Halcon Storage | Starr | Battery | 133 | 2023-05-22 | Facility Study | ERCOT | Current status |
| Double A Solar SLF | Goliad | Solar+Battery | 133 | 2024-06-13 | Facility Study | ERCOT | Current status |
| Kodiak AGR1 | Reeves | Oil | 132 | 2024-02-27 | Facility Study | ERCOT | Current status |
| GEN-2026-PR4 | Hansford | Battery | 132 | 2025-12-19 | In Progress (unknown study) | SPS | Current status |
| Maratua Solar | Grimes | Solar | 131 | 2025-10-03 | Facility Study | ERCOT | Current status |
| Starlight Solar | Mills | Solar+Battery | 131 | 2024-02-27 | Facility Study | ERCOT | Current status |
| Pecan Prairie South | Leon | Solar | 131 | 2019-08-16 | Facility Study | ERCOT | Current status |
| Anagram Solar | Live Oak | Solar | 131 | 2024-04-09 | Facility Study | ERCOT | Current status |
| White Wing Storage | Wilbarger | Solar+Battery | 130 | 2025-08-13 | Facility Study | ERCOT | Current status |
| GEN-2023-120 | Swisher | Solar | 130 | 2023-10-02 | Facility Study | SPS | Current status |
| Rosebud Solar SLF | Falls | Solar+Battery | 130 | 2021-04-13 | Facility Study | ERCOT | Current status |
| Northington Solar | Wharton | Solar | 130 | 2023-02-20 | IA Executed | ERCOT | Current status |
| BRP Octans BESS | Pecos | Battery | 130 | 2020-07-24 | Facility Study | ERCOT | Current status |
| Silverbell Storage | Red River | Solar+Battery | 129 | 2024-08-16 | Facility Study | ERCOT | Current status |
| Norton Solar | Runnels | Solar | 128 | 2017-03-06 | IA Executed | ERCOT | Current status |
| Alamo City BESS | Bexar | Battery | 128 | 2024-02-27 | IA Executed | ERCOT | Current status |
| Salazar BESS | Tarrant | Battery | 128 | 2024-10-01 | Facility Study | ERCOT | Current status |
| San Gabriel Storage | Milam | Solar+Battery | 128 | 2025-01-28 | Facility Study | ERCOT | Current status |
| White Wing Solar | Wilbarger | Solar+Battery | 127 | 2025-08-13 | Facility Study | ERCOT | Current status |
| HILLBORO BESS | Hill | Wind+Battery | 127 | 2024-02-27 | Facility Study | ERCOT | Current status |
| Sandford Solar | Wise | Solar+Battery | 126 | 2024-01-03 | Facility Study | ERCOT | Current status |
| Bunting Solar Project | Frio | Solar | 126 | 2025-10-21 | Facility Study | ERCOT | Current status |
| J1834 | Orange | Gas | 126 | 2021-12-16 | IA Pending | ENTERGY TEXAS, INC. | Current status |
| Solar Star North Herty Storage | Angelina | Battery | 126 | 2022-02-21 | Facility Study | ERCOT | Current status |
| Barrett Solar | Rains | Solar | 126 | 2023-02-27 | IA Executed | ERCOT | Current status |
| Dolomite Storage | Ellis | Battery | 126 | 2023-09-08 | Facility Study | ERCOT | Current status |
| Benitoite Storage | Van Zandt | Battery | 126 | 2024-03-22 | Facility Study | ERCOT | Current status |
| Spinner Energy Storage | Bee | Battery | 126 | 2023-10-13 | Facility Study | ERCOT | Current status |
| Becerra Creek Storage 1 | Webb | Battery | 126 | 2022-09-21 | Facility Study | ERCOT | Current status |
| Becerra Creek Storage 2 | Webb | Battery | 126 | 2022-09-21 | Facility Study | ERCOT | Current status |
| Star Dairy Solar | Lamar | Solar+Battery | 126 | 2022-11-23 | IA Executed | ERCOT | Current status |
| Huisache Solar | Wilson | Solar+Battery | 126 | 2021-12-03 | IA Executed | ERCOT | Current status |
| Silverbell Solar | Red River | Solar+Battery | 126 | 2024-08-16 | Facility Study | ERCOT | Current status |
| Elm Flats Solar SLF | Navarro | Solar+Battery | 126 | 2024-07-30 | Facility Study | ERCOT | Current status |
| Zodiac Storage | Val Verde | Battery | 126 | 2024-11-19 | Facility Study | ERCOT | Current status |
| Three Ranches Solar | Brewster | Solar+Battery | 126 | 2025-02-14 | Facility Study | ERCOT | Current status |
| DMF Sagerton Solar SLF | Haskell | Solar+Battery | 126 | 2023-07-31 | Facility Study | ERCOT | Current status |
| Momentum Stout BESS | Burnet | Battery | 126 | 2023-11-14 | Facility Study | ERCOT | Current status |
| Momentum Hazy Jane BESS | Ector | Battery | 126 | 2023-11-14 | Facility Study | ERCOT | Current status |
| Saluga Ranch Storage | Dimmit | Battery | 125 | 2024-02-02 | Facility Study | ERCOT | Current status |
| Houston County BESS | Houston | Battery | 125 | 2024-02-27 | Facility Study | ERCOT | Current status |
| Momentum Bock | Lamar | Battery | 125 | 2024-09-04 | Facility Study | ERCOT | Current status |
| Jumping Cactus Storage | Duval | Battery | 125 | 2024-01-11 | Facility Study | ERCOT | Current status |
| TE Smith Storage | Rockwall | Battery | 125 | 2021-09-02 | IA Executed | ERCOT | Current status |
| TE Smith Storage 2 | Rockwall | Battery | 125 | 2024-04-15 | Facility Study | ERCOT | Current status |
| Project Lynx BESS | Nueces | Battery | 125 | 2023-03-08 | IA Executed | ERCOT | Current status |
| Forest Creek Wind Repower | Glasscock | Wind | 125 | 2024-01-11 | IA Executed | ERCOT | Current status |
| Journey Solar | Haskell | Solar | 125 | 2024-03-29 | Facility Study | ERCOT | Current status |
| Shaw Solar | Bandera | Solar | 125 | 2020-10-23 | IA Executed | ERCOT | Current status |
| Lupinus Storage 2 | Franklin | Solar+Battery | 125 | 2021-12-13 | IA Executed | ERCOT | Current status |
| Backbone Creek BESS | Burnet | Battery | 124 | 2022-04-18 | IA Executed | ERCOT | Current status |
| EMPower Odessa (TEF - Due Diligence) | Ector | Gas | 123 | 2024-07-22 | Facility Study | ERCOT | Current status |
| Sleepy Hollow BESS | Throckmorton | Battery | 123 | 2023-11-30 | Facility Study | ERCOT | Current status |
| Great Hambino BESS | Atascosa | Battery | 123 | 2025-09-11 | Facility Study | ERCOT | Current status |
| Signal Hill BESS I | Wichita | Battery | 123 | 2024-09-04 | Facility Study | ERCOT | Current status |
| East West BESS | Kerr | Battery | 123 | 2022-10-06 | IA Executed | ERCOT | Current status |
| Prairie Blossom Storage | Howard | Battery | 123 | 2024-12-19 | Facility Study | ERCOT | Current status |
| Arnold Hills Storage | Henderson | Battery | 123 | 2025-03-24 | Facility Study | ERCOT | Current status |
| Dove Wing Storage | Duval | Battery | 122 | 2024-02-07 | Facility Study | ERCOT | Current status |
| Morning Glory Solar | Tom Green | Solar | 122 | 2021-06-16 | Facility Study | ERCOT | Current status |
| Sayle Solar SLF | Jackson | Solar+Battery | 122 | 2024-06-03 | Facility Study | ERCOT | Current status |
| Sayle Storage SLF | Jackson | Solar+Battery | 122 | 2024-06-03 | Facility Study | ERCOT | Current status |
| Grandslam Solar | Atascosa | Solar | 122 | 2019-07-29 | IA Executed | ERCOT | Current status |
| Rock Island Generating (TEF -Due Diligence) | Colorado | Gas | 122 | 2024-07-22 | IA Executed | ERCOT | Current status |
| Bronc Rodeo Solar Project | Falls | Solar | 122 | 2023-05-03 | Facility Study | ERCOT | Current status |
| BRP Ampato BESS | Crane | Battery | 122 | 2020-08-04 | Facility Study | ERCOT | Current status |
| Caney Creek Solar | Van Zandt | Solar | 121 | 2020-09-25 | IA Executed | ERCOT | Current status |
| Nymphaea Solar | Wichita | Solar+Battery | 121 | 2022-09-21 | Facility Study | ERCOT | Current status |
| Pepper Solar Farm | Mclennan | Solar | 121 | 2024-02-27 | IA Executed | ERCOT | Current status |
| Dove Run Solar | Duval | Solar | 121 | 2019-05-07 | IA Executed | ERCOT | Current status |
| Marengo BESS | Cameron | Battery | 121 | 2023-05-15 | Facility Study | ERCOT | Current status |
| Long Point Solar | Brazoria | Solar+Battery | 121 | 2017-03-15 | IA Executed | ERCOT | Current status |
| Iron Cowboy Solar | San Patricio | Solar+Battery | 121 | 2025-06-05 | Facility Study | ERCOT | Current status |
| Sun Cactus Solar | Duval | Solar | 121 | 2022-07-05 | IA Executed | ERCOT | Current status |
| Wagyu BESS SLF | Brazoria | Battery | 121 | 2025-06-19 | Facility Study | ERCOT | Current status |
| Neal Battery | Wharton | Solar+Battery | 121 | 2025-10-21 | Facility Study | ERCOT | Current status |
| Borden Dino Solar | Borden | Solar+Battery | 120 | 2025-04-01 | Facility Study | ERCOT | Current status |
| Fairway Storage | Freestone | Battery | 120 | 2022-11-07 | IA Executed | ERCOT | Current status |
| Buffalo Gap 1 Wind Repower | Nolan | Wind | 120 | 2025-01-28 | IA Executed | ERCOT | Current status |
| GEN-2023-SR12 | Cochran | Battery | 120 | 2023-02-13 | IA Executed | Xcel | Current status |
| GEN-2024-123 | Shelby | Solar | 120 | 2025-03-01 | System Impact Study | AEP | Current status |
| Razorbill Storage | Matagorda | Solar+Battery | 120 | 2020-08-04 | Facility Study | ERCOT | Current status |
| Kalina Solar | San Patricio | Solar | 120 | 2020-08-04 | Facility Study | ERCOT | Current status |
| Big Elm Storage | Bell | Solar+Battery | 120 | 2022-04-18 | IA Executed | ERCOT | Current status |
| Riverwalk BESS | Bexar | Battery | 120 | 2022-07-18 | Facility Study | ERCOT | Current status |
| Rosharon BESS | Brazoria | Battery | 120 | 2024-04-09 | Facility Study | ERCOT | Current status |
| Buckaroo BESS | Parker | Battery | 120 | 2024-05-09 | Facility Study | ERCOT | Current status |
| Rolling Plains BESS | Haskell | Battery | 120 | 2024-08-16 | Facility Study | ERCOT | Current status |
| Wild Horse Desert Solar | Dimmit | Solar+Battery | 120 | 2024-12-19 | Facility Study | ERCOT | Current status |
| Pradera Solar | Webb | Solar+Battery | 118 | 2021-07-08 | Facility Study | ERCOT | Current status |
| Roxton Solar | Lamar | Solar+Battery | 117 | 2024-11-26 | Facility Study | ERCOT | Current status |
| Butcherbird Solar | Bell | Solar | 116 | 2023-12-18 | Facility Study | ERCOT | Current status |
| Pioneer Hutt Solar (Alternative POI) | Midland | Solar | 116 | 2023-06-28 | Facility Study | ERCOT | Current status |
| Marcos BESS | Victoria | Solar+Battery | 116 | 2024-02-07 | Facility Study | ERCOT | Current status |
| Amphion Solar Phase 3 | Atascosa | Solar | 115 | 2025-04-21 | Facility Study | ERCOT | Current status |
| Velado Solar SLF | Dimmit | Solar+Battery | 115 | 2024-11-19 | Facility Study | ERCOT | Current status |
| Velado Storage SLF | Dimmit | Solar+Battery | 115 | 2024-11-19 | Facility Study | ERCOT | Current status |
| Hayrick BESS | Coke | Battery | 114 | 2022-08-16 | Facility Study | ERCOT | Current status |
| Neptune Gas Generation Plant | Reeves | Gas | 114 | 2024-12-19 | Facility Study | ERCOT | Current status |
| LOST PINES GAS RECIP | Bastrop | Gas | 113 | 2025-07-07 | Facility Study | ERCOT | Current status |
| SCHNEIDER GAS RICE | Caldwell | Gas | 113 | 2025-07-29 | Facility Study | ERCOT | Current status |
| LOST PINES GAS RECIP PHASE 2 | Bastrop | Gas | 113 | 2025-07-07 | Facility Study | ERCOT | Current status |
| SCHNEIDER GAS RICE PHASE 2 | Caldwell | Gas | 113 | 2025-07-29 | Facility Study | ERCOT | Current status |
| Alpujarra Solar | Wharton | Solar | 113 | 2024-09-04 | Facility Study | ERCOT | Current status |
| Atria Solar | Chambers | Solar | 112 | 2020-10-23 | Facility Study | ERCOT | Current status |
| Coyote Ridge BESS | Brown | Battery | 111 | 2025-01-28 | Facility Study | ERCOT | Current status |
| Three W Solar | Hill | Solar | 111 | 2022-03-07 | IA Executed | ERCOT | Current status |
| Scrap Iron Solar | Grimes | Solar | 111 | 2024-09-10 | Facility Study | ERCOT | Current status |
| Carpet Tech Solar One | Kent | Solar | 111 | 2025-07-07 | Facility Study | ERCOT | Current status |
| Ophelia Solar | Ector | Solar | 111 | 2022-09-02 | Facility Study | ERCOT | Current status |
| Camp Creek Solar SLF | Robertson | Solar+Battery | 110 | 2021-12-24 | IA Executed | ERCOT | Current status |
| Megacharge BESS | Cameron | Battery | 110 | 2023-06-28 | Facility Study | ERCOT | Current status |
| PHOTON SOLAR 3 SLF | Wharton | Solar | 110 | 2020-10-23 | IA Executed | ERCOT | Current status |
| Georgia-Lynn BESS | Victoria | Battery | 109 | 2024-07-30 | Facility Study | ERCOT | Current status |
| Solheim Solar | Bosque | Solar | 109 | 2023-08-14 | Facility Study | ERCOT | Current status |
| Vault Solar | Palo Pinto | Solar | 109 | 2023-06-28 | Facility Study | ERCOT | Current status |
| Comanche Creek generating station | Pecos | Gas | 107 | 2024-07-01 | Facility Study | ERCOT | Current status |
| Wittig Solar | Wharton | Solar | 107 | 2024-02-27 | Facility Study | ERCOT | Current status |
| Frio Farm | Frio | Solar | 107 | 2021-12-20 | Facility Study | ERCOT | Current status |
| PHOTON SOLAR 4 SLF | Wharton | Solar | 106 | 2024-09-04 | Facility Study | ERCOT | Current status |
| Santa Monica Solar | Navarro | Solar | 106 | 2023-09-07 | Facility Study | ERCOT | Current status |
| Longfellow BESS II | Pecos | Solar+Battery | 106 | 2022-11-07 | IA Executed | ERCOT | Current status |
| McClure Solar | Palo Pinto | Solar | 106 | 2020-06-03 | Facility Study | ERCOT | Current status |
| Waterloo BESS 1 | Bastrop | Solar+Battery | 106 | 2023-05-15 | IA Executed | ERCOT | Current status |
| Rain Lily Storage 1 | Hood | Solar+Battery | 106 | 2025-02-25 | Facility Study | ERCOT | Current status |
| Burgos Solar | Milam | Solar | 106 | 2022-10-18 | Facility Study | ERCOT | Current status |
| Reis Solar | Atascosa | Solar | 105 | 2022-06-02 | Facility Study | ERCOT | Current status |
| Carolina Storage Friendswood | Brazoria | Battery | 105 | 2024-02-02 | Facility Study | ERCOT | Current status |
| Flying Kite Bess | Zavala | Solar+Battery | 105 | 2024-07-30 | Facility Study | ERCOT | Current status |
| Bonham Storage SLF | Limestone | Solar+Battery | 105 | 2025-01-28 | Facility Study | ERCOT | Current status |
| Slate Solar Project | Zapata | Solar | 105 | 2021-12-20 | Facility Study | ERCOT | Current status |
| Starlight Storage | Mills | Solar+Battery | 105 | 2024-02-27 | Facility Study | ERCOT | Current status |
| Happy Dog Storage | Milam | Solar+Battery | 105 | 2023-06-07 | IA Executed | ERCOT | Current status |
| Stargazer BESS | Brazoria | Solar+Battery | 105 | 2023-10-30 | Facility Study | ERCOT | Current status |
| Neutron Storage | Mclennan | Battery | 105 | 2023-09-08 | IA Executed | ERCOT | Current status |
| Carolina Storage Young County | Young | Battery | 105 | 2024-02-27 | Facility Study | ERCOT | Current status |
| Yellow Leaf Solar | Kaufman | Solar+Battery | 105 | 2025-04-25 | Facility Study | ERCOT | Current status |
| Cadet Storage | Brazos | Battery | 104 | 2023-05-22 | Facility Study | ERCOT | Current status |
| Power Lane II Gas | Hunt | Gas | 104 | 2025-06-03 | Facility Study | ERCOT | Current status |
| Big River Solar | Zapata | Solar+Battery | 104 | 2021-05-04 | Facility Study | ERCOT | Current status |
| Hardeman BESS | Hardeman | Battery | 104 | 2024-05-09 | Facility Study | ERCOT | Current status |
| Mineral Springs BESS | Burnet | Battery | 104 | 2024-06-03 | Facility Study | ERCOT | Current status |
| Fudge Ranch BESS | Kaufman | Battery | 104 | 2024-04-15 | Facility Study | ERCOT | Current status |
| Rockpile Storage | Frio | Battery | 104 | 2025-04-21 | Facility Study | ERCOT | Current status |
| Yellow Leaf BESS | Kaufman | Solar+Battery | 104 | 2025-04-25 | Facility Study | ERCOT | Current status |
| Aggie Solar Project SLF | Reeves | Solar+Battery | 104 | 2024-02-02 | Facility Study | ERCOT | Current status |
| Anawa La BESS | Hidalgo | Solar+Battery | 104 | 2024-03-22 | Facility Study | ERCOT | Current status |
| Piedra BESS | Freestone | Solar+Battery | 104 | 2022-09-02 | IA Executed | ERCOT | Current status |
| Bronze Quinta Storage | Hidalgo | Battery | 104 | 2022-01-13 | Facility Study | ERCOT | Current status |
| Diamond Cowboy Storage | San Patricio | Battery | 104 | 2024-04-15 | Facility Study | ERCOT | Current status |
| Post Trail Energy | Matagorda | Battery | 104 | 2024-09-10 | Facility Study | ERCOT | Current status |
| Pequin Energy Storage | Brazoria | Battery | 103 | 2021-01-25 | Facility Study | ERCOT | Current status |
| Shallow Valley Storage | Ward | Battery | 103 | 2024-07-22 | Facility Study | ERCOT | Current status |
| Rio Vista Storage | Pecos | Solar+Battery | 103 | 2025-06-19 | Facility Study | ERCOT | Current status |
| Three Ranches BESS | Brewster | Solar+Battery | 103 | 2025-08-21 | Facility Study | ERCOT | Current status |
| Gatsby Energy Storage | Pecos | Battery | 103 | 2024-02-07 | Facility Study | ERCOT | Current status |
| Hyacinth Storage | Harris | Battery | 103 | 2021-07-02 | Facility Study | ERCOT | Current status |
| Appaloosa Run BESS | Upton | Battery | 103 | 2022-03-07 | Facility Study | ERCOT | Current status |
| Atticus Energy Storage | Sutton | Battery | 103 | 2024-03-29 | Facility Study | ERCOT | Current status |
| Evans Creek Energy Storage | Val Verde | Battery | 103 | 2023-10-25 | Facility Study | ERCOT | Current status |
| BLACK BEAR SOLAR | Crockett | Solar+Battery | 103 | 2023-12-04 | Facility Study | ERCOT | Current status |
| Wisdom BESS SLF | Pecos | Solar+Battery | 103 | 2025-02-12 | Facility Study | ERCOT | Current status |
| Massey Storage | Harris | Battery | 103 | 2024-07-30 | Facility Study | ERCOT | Current status |
| Third Coast BESS | Jackson | Battery | 103 | 2021-08-24 | IA Executed | ERCOT | Current status |
| Louisa Energy Storage | Bexar | Battery | 103 | 2021-11-16 | IA Executed | ERCOT | Current status |
| Seven Flags BESS | Webb | Battery | 103 | 2021-09-01 | IA Executed | ERCOT | Current status |
| Tierra Seca BESS | Val Verde | Battery | 103 | 2021-08-24 | IA Executed | ERCOT | Current status |
| Firebird BESS | Ector | Battery | 103 | 2023-11-14 | Facility Study | ERCOT | Current status |
| Bexar ESS | Bexar | Battery | 103 | 2021-09-21 | IA Executed | ERCOT | Current status |
| Holstein 2 Energy Storage | Nolan | Solar+Battery | 102 | 2019-08-26 | Facility Study | ERCOT | Current status |
| Amador Storage | Van Zandt | Battery | 102 | 2022-11-23 | IA Executed | ERCOT | Current status |
| Roost Energy Storage | Scurry | Battery | 102 | 2023-01-30 | Facility Study | ERCOT | Current status |
| Big Five Storage | Hidalgo | Battery | 102 | 2023-05-26 | Facility Study | ERCOT | Current status |
| Pioneer Path Energy Storage 1 | Robertson | Battery | 102 | 2025-02-03 | Facility Study | ERCOT | Current status |
| Pioneer Path Energy Storage 2 | Robertson | Battery | 102 | 2025-02-03 | Facility Study | ERCOT | Current status |
| Pioneer Path Energy Storage 3 | Robertson | Battery | 102 | 2025-02-03 | Facility Study | ERCOT | Current status |
| Pioneer Path Energy Storage 4 | Robertson | Battery | 102 | 2025-02-03 | Facility Study | ERCOT | Current status |
| Prairie Horizon Energy Storage 1 | Robertson | Battery | 102 | 2025-02-03 | Facility Study | ERCOT | Current status |
| Prairie Horizon Energy Storage 2 | Robertson | Battery | 102 | 2025-02-03 | Facility Study | ERCOT | Current status |
| Prairie Horizon Energy Storage 3 | Robertson | Battery | 102 | 2025-02-03 | Facility Study | ERCOT | Current status |
| Prairie Horizon Energy Storage 4 | Robertson | Battery | 102 | 2025-02-03 | Facility Study | ERCOT | Current status |
| Edgewood BESS 1 | Van Zandt | Battery | 102 | 2024-11-21 | Facility Study | ERCOT | Current status |
| Edgewood BESS 2 | Van Zandt | Battery | 102 | 2025-01-28 | Facility Study | ERCOT | Current status |
| watermelon 1 energy storage | Dallas | Battery | 102 | 2025-01-13 | Facility Study | ERCOT | Current status |
| watermelon 2 energy storage | Dallas | Battery | 102 | 2025-01-13 | Facility Study | ERCOT | Current status |
| watermelon 3 energy storage | Dallas | Battery | 102 | 2025-01-13 | Facility Study | ERCOT | Current status |
| watermelon 4 energy storage | Dallas | Battery | 102 | 2025-01-13 | Facility Study | ERCOT | Current status |
| Blackland Prairie 1 Energy Storage | Travis | Battery | 102 | 2025-03-24 | Facility Study | ERCOT | Current status |
| Blackland Prairie 2 Energy Storage | Travis | Battery | 102 | 2025-03-24 | Facility Study | ERCOT | Current status |
| Blackland Prairie 3 Energy Storage | Travis | Battery | 102 | 2025-03-24 | Facility Study | ERCOT | Current status |
| watermelon 5 energy storage | Dallas | Battery | 102 | 2025-02-14 | Facility Study | ERCOT | Current status |
| watermelon 6 energy storage | Dallas | Battery | 102 | 2025-02-14 | Facility Study | ERCOT | Current status |
| watermelon 7 energy storage | Dallas | Battery | 102 | 2025-02-14 | Facility Study | ERCOT | Current status |
| watermelon 8 energy storage | Dallas | Battery | 102 | 2025-02-14 | Facility Study | ERCOT | Current status |
| Opuntia Solar SLF | Refugio | Solar+Battery | 102 | 2021-08-24 | Facility Study | ERCOT | Current status |
| Remy Jade III Power Station | Harris | Gas | 102 | 2022-07-18 | IA Executed | ERCOT | Current status |
| Roxton Storage | Lamar | Solar+Battery | 102 | 2024-11-26 | Facility Study | ERCOT | Current status |
| Crocus Solar | Stephens | Solar+Battery | 102 | 2025-01-28 | Facility Study | ERCOT | Current status |
| Stoneridge BESS | Milam | Battery | 102 | 2023-03-13 | IA Executed | ERCOT | Current status |
| Kurtz Solar SLF | Atascosa | Solar+Battery | 102 | 2024-09-04 | Facility Study | ERCOT | Current status |
| Pisgah Ridge Solar 2 | Navarro | Solar+Battery | 102 | 2021-07-14 | Facility Study | ERCOT | Current status |
| Pamela Heights I | Harris | Battery | 102 | 2024-09-10 | IA Executed | ERCOT | Current status |
| Lucky 7 Solar | Hopkins | Solar | 102 | 2024-03-22 | IA Executed | ERCOT | Current status |
| Greyhound Solar - Phase F | Ector | Solar | 102 | 2025-04-17 | IA Executed | ERCOT | Current status |
| Myers Solar | Bee | Solar+Battery | 102 | 2023-06-28 | Facility Study | ERCOT | Current status |
| Jayhawk Solar | Mitchell | Solar | 102 | 2019-08-05 | Facility Study | ERCOT | Current status |
| Lamkin Solar | Comanche | Solar | 102 | 2019-06-24 | IA Executed | ERCOT | Current status |
| Kennedy Solar | Navarro | Solar+Battery | 102 | 2022-03-07 | Facility Study | ERCOT | Current status |
| Rose Quartz BESS | Dimmit | Battery | 101 | 2022-09-02 | Facility Study | ERCOT | Current status |
| Raven Storage | Wharton | Battery | 101 | 2022-01-28 | IA Executed | ERCOT | Current status |
| Pisgah Ridge Storage 3 | Navarro | Solar+Battery | 101 | 2021-07-14 | Facility Study | ERCOT | Current status |
| Blanket Ranch South Solar | Brown | Solar+Battery | 101 | 2022-06-10 | Facility Study | ERCOT | Current status |
| Pinnacle Point Energy Storage | Harris | Battery | 101 | 2023-11-14 | Facility Study | ERCOT | Current status |
| Megamouth Energy Storage | Harris | Battery | 101 | 2024-03-22 | IA Executed | ERCOT | Current status |
| Maddox Solar | Grayson | Solar | 101 | 2024-05-09 | Facility Study | ERCOT | Current status |
| Margay Energy Storage | Brazoria | Battery | 101 | 2025-02-25 | Facility Study | ERCOT | Current status |
| Blue Sky Sol | Crockett | Solar+Battery | 101 | 2020-12-03 | IA Executed | ERCOT | Current status |
| Citrus Flatts BESS | Cameron | Battery | 101 | 2022-03-30 | IA Executed | ERCOT | Current status |
| Southside Energy | Brazoria | Battery | 101 | 2023-02-27 | Facility Study | ERCOT | Current status |
| Lyford Energy | Willacy | Battery | 101 | 2023-03-08 | Facility Study | ERCOT | Current status |
| Kinney County Energy | Kinney | Battery | 101 | 2023-03-27 | Facility Study | ERCOT | Current status |
| Hadrian Energy Storage | Wharton | Battery | 101 | 2023-05-15 | Facility Study | ERCOT | Current status |
| Hynes Bay Energy Storage | Wharton | Battery | 101 | 2023-10-25 | Facility Study | ERCOT | Current status |
| Blue Creek Energy Storage | Wharton | Battery | 101 | 2023-10-13 | Facility Study | ERCOT | Current status |
| Strawberry Dunes Solar SLF | Atascosa | Solar+Battery | 101 | 2025-02-14 | Facility Study | ERCOT | Current status |
| Solar Star Frontier BESS | Cameron | Battery | 101 | 2023-06-28 | Facility Study | ERCOT | Current status |
| Matagorda Solar | Matagorda | Solar | 101 | 2020-05-01 | IA Executed | ERCOT | Current status |
| Vaca Storage | Calhoun | Battery | 101 | 2021-03-26 | Facility Study | ERCOT | Current status |
| Las Moras Battery | Kinney | Battery | 101 | 2021-06-07 | Facility Study | ERCOT | Current status |
| Glasgow Storage | Navarro | Solar+Battery | 101 | 2022-02-21 | IA Executed | ERCOT | Current status |
| Glory Bee Storage | Erath | Solar+Battery | 101 | 2022-06-10 | Facility Study | ERCOT | Current status |
| Luthor Solar | Howard | Solar | 101 | 2022-06-27 | Facility Study | ERCOT | Current status |
| Sandford Storage | Wise | Solar+Battery | 101 | 2024-01-03 | Facility Study | ERCOT | Current status |
| Paradiso BESS | Atascosa | Battery | 101 | 2021-03-01 | IA Executed | ERCOT | Current status |
| Carambola BESS | Hidalgo | Battery | 101 | 2022-10-18 | IA Executed | ERCOT | Current status |
| Picadillo BESS | Martin | Battery | 101 | 2022-03-07 | IA Executed | ERCOT | Current status |
| Lupinus Solar 3 | Franklin | Solar+Battery | 101 | 2023-09-23 | IA Executed | ERCOT | Current status |
| Hana Springs BESS | Lampasas | Battery | 101 | 2022-11-23 | Facility Study | ERCOT | Current status |
| Hide Town Energy Storage | Scurry | Battery | 101 | 2023-01-17 | Facility Study | ERCOT | Current status |
| Holstein 2 Solar | Nolan | Solar+Battery | 101 | 2016-12-21 | Facility Study | ERCOT | Current status |
| Goat Mountain BESS 2 | Sterling | Wind+Battery | 101 | 2025-01-28 | Facility Study | ERCOT | Current status |
| Calf Creek Storage | Howard | Battery | 101 | 2025-11-24 | Facility Study | ERCOT | Current status |
| Hondo Arroyo Storage | Medina | Solar+Battery | 101 | 2024-12-19 | Facility Study | ERCOT | Current status |
| Huisache BESS | Wilson | Solar+Battery | 101 | 2022-08-05 | IA Executed | ERCOT | Current status |
| Rutile BESS | Runnels | Battery | 101 | 2023-01-23 | IA Executed | ERCOT | Current status |
| Dolce BESS | Mitchell | Battery | 101 | 2022-09-27 | Facility Study | ERCOT | Current status |
| BRP Diran BESS | Wharton | Battery | 101 | 2020-12-03 | IA Executed | ERCOT | Current status |
| Long Point Storage | Brazoria | Solar+Battery | 101 | 2019-11-01 | IA Executed | ERCOT | Current status |
| Lemma Solar | Knox | Solar | 101 | 2023-04-07 | Facility Study | ERCOT | Current status |
| Mobee Springs BESS | Refugio | Battery | 101 | 2025-06-05 | Facility Study | ERCOT | Current status |
| Musgravite Solar | Henderson | Solar | 101 | 2024-03-22 | Facility Study | ERCOT | Current status |
| Sugarloaf BESS | Dimmit | Battery | 101 | 2024-03-22 | Facility Study | ERCOT | Current status |
| Brahman Renewables Solar | Milam | Solar+Battery | 101 | 2024-10-29 | Facility Study | ERCOT | Current status |
| Ringtail Ridge Storage | Kendall | Battery | 101 | 2021-01-25 | Facility Study | ERCOT | Current status |
| Sagewood BESS | Glasscock | Battery | 101 | 2022-09-21 | Facility Study | ERCOT | Current status |
| Felix Storage | Wilbarger | Solar+Battery | 101 | 2023-01-03 | Facility Study | ERCOT | Current status |
| Firefly Fields Solar | Colorado | Solar+Battery | 101 | 2025-01-13 | Facility Study | ERCOT | Current status |
| BRP Musca BESS | Reagan | Battery | 101 | 2020-07-24 | Facility Study | ERCOT | Current status |
| Guinness BESS | Williamson | Battery | 101 | 2022-07-25 | Facility Study | ERCOT | Current status |
| Timber Cove Solar SLF | Freestone | Solar+Battery | 101 | 2023-05-22 | Facility Study | ERCOT | Current status |
| Mud Cat Solar SLF | Lamar | Solar+Battery | 101 | 2023-10-20 | Facility Study | ERCOT | Current status |
| Timberline Storage | Nacogdoches | Solar+Battery | 101 | 2023-08-14 | Facility Study | ERCOT | Current status |
| AP Greenport | Travis | Battery | 100 | 2022-06-10 | Facility Study | ERCOT | Current status |
| Goldfinch Storage | Van Zandt | Solar+Battery | 100 | 2023-10-04 | Facility Study | ERCOT | Current status |
| Main Horn Solar | Navarro | Solar | 100 | Facility Study | ERCOT | Current status | |
| Hermes Storage | Bell | Solar+Battery | 100 | 2022-07-18 | IA Executed | ERCOT | Current status |
| Lazy Frog Solar SLF | Franklin | Solar+Battery | 100 | 2023-09-22 | Facility Study | ERCOT | Current status |
| Cobra Clean Energy Center | Brazoria | Battery | 100 | 2024-02-02 | Facility Study | ERCOT | Current status |
| Hermes Solar | Bell | Solar+Battery | 100 | 2021-09-21 | IA Executed | ERCOT | Current status |
| Pledgor BESS | Matagorda | Battery | 100 | 2023-05-03 | Facility Study | ERCOT | Current status |
| Rogers Creek BESS | Cherokee | Battery | 100 | 2023-05-15 | Facility Study | ERCOT | Current status |
| Ariji BESS | Howard | Battery | 100 | 2022-09-15 | IA Executed | ERCOT | Current status |
| Jim Wells BESS | Jim Wells | Battery | 100 | 2024-02-07 | Facility Study | ERCOT | Current status |
| DAMAZO (Second Division) SOLAR | Brazoria | Solar | 100 | 2019-03-28 | IA Executed | ERCOT | Current status |
| Diamond Sage BESS 1 | Webb | Solar+Battery | 100 | 2025-01-28 | Facility Study | ERCOT | Current status |
| Diamond Sage BESS 2 | Webb | Solar+Battery | 100 | 2025-01-28 | Facility Study | ERCOT | Current status |
| SS100S | El Paso | Solar | 100 | 2022-09-30 | IA Executed | El Paso Electric Company | Current status |
| Ne100B | El Paso | Battery | 100 | 2024-03-27 | IA Executed | El Paso Electric Company | Current status |
| Ne100S | El Paso | Solar | 100 | 2024-03-27 | IA Executed | El Paso Electric Company | Current status |
| J2952 | Chambers | Solar | 100 | 2022-09-14 | Cluster Study | ENTERGY TEXAS, INC. | Current status |
| J4124 | Trinity | Solar | 100 | 2025-08-25 | ENTERGY TEXAS, INC. | Current status | |
| GEN-2024-241 | Bowie | Solar | 100 | 2025-03-01 | System Impact Study | AEP | Current status |
| Arroyo Solar | Cameron | Solar+Battery | 100 | 2018-05-09 | IA Executed | ERCOT | Current status |
| Independence Trail Storage | Childress | Battery | 100 | 2019-12-03 | Facility Study | ERCOT | Current status |
| SPC Bloom BESS | Victoria | Battery | 100 | 2020-12-03 | Facility Study | ERCOT | Current status |
| GALVANIC BESS | Kinney | Battery | 100 | 2021-02-09 | Facility Study | ERCOT | Current status |
| SUNSETTER BESS | Uvalde | Battery | 100 | 2021-02-09 | Facility Study | ERCOT | Current status |
| Ardesia Storage | Caldwell | Battery | 100 | 2022-06-10 | Facility Study | ERCOT | Current status |
| Photo BESS 3 | Uvalde | Solar+Battery | 100 | 2022-07-25 | Facility Study | ERCOT | Current status |
| PSE Richardson TX Storage | Hidalgo | Battery | 100 | 2022-12-07 | Facility Study | ERCOT | Current status |
| IEP Blackhawk | Galveston | Battery | 100 | 2023-04-07 | Facility Study | ERCOT | Current status |
| Blue Summit Energy Storage | Wilbarger | Wind+Battery | 100 | 2023-10-20 | IA Executed | ERCOT | Current status |
| Callisto ID Energy Center | Harris | Battery | 100 | 2024-10-01 | Facility Study | ERCOT | Current status |
| Erika BESS | Kaufman | Solar+Battery | 100 | 2025-06-19 | Facility Study | ERCOT | Current status |
| Radiant Plains Energy Center BESS | Colorado | Solar+Battery | 100 | 2025-06-12 | Facility Study | ERCOT | Current status |
| Radiant Plains Energy Center Solar | Colorado | Solar+Battery | 100 | 2025-06-12 | Facility Study | ERCOT | Current status |
| J483 | Liberty | Solar | 100 | 2015-09-14 | IA Executed | MISO | Current status |
| Adam Bryant BESS | Medina | Battery | 100 | 2024-02-26 | Facility Study | ERCOT | Current status |
| Cannibal Draw Storage | Glasscock | Solar+Battery | 99 | 2024-07-01 | IA Executed | ERCOT | Current status |
| Leitrim 1 Solar | Hill | Solar | 98 | 2021-01-26 | Facility Study | ERCOT | Current status |
| Midpoint Solar | Hill | Solar | 98 | 2021-10-15 | IA Executed | ERCOT | Current status |
| Rocinante Solar | Gonzales | Solar+Battery | 95 | 2021-04-22 | IA Executed | ERCOT | Current status |
| VISOL 1 SOLAR | Val Verde | Solar | 95 | 2023-10-25 | Facility Study | ERCOT | Current status |
| Timmerman Power Plant Phase 2B | Caldwell | Gas | 94 | 2025-10-21 | IA Executed | ERCOT | Current status |
| High Noon Storage | Hill | Solar+Battery | 94 | 2021-11-03 | IA Executed | ERCOT | Current status |
| PSE Minnesota TX Storage | Hidalgo | Battery | 94 | 2022-11-15 | Facility Study | ERCOT | Current status |
| Trinity Hills BESS SLF | Archer | Battery | 94 | 2023-11-30 | Facility Study | ERCOT | Current status |
| Anawa La Solar | Hidalgo | Solar+Battery | 93 | 2024-03-29 | Facility Study | ERCOT | Current status |
| GEN-2023-241 | Franklin | Solar | 93 | 2023-10-02 | Facility Study | AEP | Current status |
| Rattlesnake Gap Solar SLF | Howard | Solar+Battery | 93 | 2025-09-22 | Facility Study | ERCOT | Current status |
| Basketflower Storage | Eastland | Solar+Battery | 92 | 2024-10-29 | Facility Study | ERCOT | Current status |
| Raghorn Solar SLF | Jim Wells | Solar+Battery | 92 | 2024-05-20 | Facility Study | ERCOT | Current status |
| Rosscommon Solar | Lamar | Solar | 91 | 2021-03-01 | Facility Study | ERCOT | Current status |
| Callan Solar | Menard | Solar | 91 | 2024-06-13 | Facility Study | ERCOT | Current status |
| Camellia Storage | Hidalgo | Battery | 91 | 2022-07-05 | Facility Study | ERCOT | Current status |
| Wild Horse Desert Storage | Dimmit | Solar+Battery | 90 | 2024-12-19 | Facility Study | ERCOT | Current status |
| Demeter Solar | Caldwell | Solar+Battery | 88 | 2022-08-05 | Facility Study | ERCOT | Current status |
| Ratcliff Solar | Freestone | Solar | 86 | 2022-06-27 | Facility Study | ERCOT | Current status |
| HappyDogSolar | Milam | Solar+Battery | 86 | 2023-06-07 | IA Executed | ERCOT | Current status |
| Payne Battlecreek | Hill | Solar | 85 | 2021-08-12 | IA Executed | ERCOT | Current status |
| RedSun BESS | Burnet | Solar+Battery | 84 | 2023-12-04 | Facility Study | ERCOT | Current status |
| Lupinus Storage 1 | Franklin | Solar+Battery | 84 | 2021-12-13 | Facility Study | ERCOT | Current status |
| FLIFER Solar I | Ward | Solar | 84 | 2023-03-08 | Facility Study | ERCOT | Current status |
| Billie Storage | Hidalgo | Battery | 84 | 2024-07-30 | Facility Study | ERCOT | Current status |
| Galaxy I Solar | Ellis | Solar+Battery | 83 | 2025-04-21 | Facility Study | ERCOT | Current status |
| RedSun Solar | Burnet | Solar+Battery | 83 | 2023-12-04 | IA Executed | ERCOT | Current status |
| Harper Energy Storage | Cameron | Battery | 82 | 2021-12-03 | Facility Study | ERCOT | Current status |
| Proving Ground Solar | Schleicher | Solar+Battery | 82 | 2023-07-10 | Facility Study | ERCOT | Current status |
| M-Bar BESS I | Ector | Solar+Battery | 82 | 2024-12-19 | Facility Study | ERCOT | Current status |
| Hector Solar | Navarro | Solar+Battery | 82 | 2022-10-24 | Facility Study | ERCOT | Current status |
| Stegall Solar | Robertson | Solar+Battery | 82 | 2023-08-21 | Facility Study | ERCOT | Current status |
| Sunbelt Solar | Kaufman | Solar+Battery | 82 | 2021-03-16 | Facility Study | ERCOT | Current status |
| Blarney Solar | Hopkins | Solar | 81 | 2022-07-05 | IA Executed | ERCOT | Current status |
| Soluce Bravo Solar | Brown | Solar+Battery | 81 | 2025-01-13 | Facility Study | ERCOT | Current status |
| Flying Kite Solar | Zavala | Solar+Battery | 80 | 2023-04-07 | IA Executed | ERCOT | Current status |
| JUNIPERUSSS | Hopkins | Solar+Battery | 80 | 2024-01-11 | Facility Study | ERCOT | Current status |
| Big Star Storage | Bastrop | Battery | 80 | 2020-01-02 | IA Executed | ERCOT | Current status |
| Gaia Storage | Navarro | Solar+Battery | 79 | 2021-12-29 | IA Executed | ERCOT | Current status |
| Hinkell BESS | La Salle | Battery | 78 | 2023-08-21 | Facility Study | ERCOT | Current status |
| Naduah Solar | Limestone | Solar | 78 | 2021-09-27 | Facility Study | ERCOT | Current status |
| Sherbino II BESS SLF | Pecos | Battery | 77 | 2023-11-30 | IA Executed | ERCOT | Current status |
| Dionysus Storage | Houston | Solar+Battery | 77 | 2023-06-28 | Facility Study | ERCOT | Current status |
| Cairos Storage | Kinney | Solar+Battery | 77 | 2023-10-25 | Facility Study | ERCOT | Current status |
| Eagle Springs Solar | Delta | Solar+Battery | 77 | 2021-10-18 | IA Executed | ERCOT | Current status |
| Knox County Moore Storage | Knox | Battery | 77 | 2024-12-19 | Facility Study | ERCOT | Current status |
| Eytcheson Ranches Solar | Navarro | Solar | 76 | 2021-09-14 | Facility Study | ERCOT | Current status |
| Lytton Springs BESS | Caldwell | Solar+Battery | 76 | 2025-12-02 | Facility Study | ERCOT | Current status |
| SERENGETI SOLAR | Delta | Solar | 76 | 2022-12-07 | Facility Study | ERCOT | Current status |
| Myers Storage | Bee | Solar+Battery | 76 | 2023-06-28 | Facility Study | ERCOT | Current status |
| Donelson Solar SLF | Red River | Solar+Battery | 75 | 2025-03-24 | Facility Study | ERCOT | Current status |
| PaleAle BESS | Hays | Battery | 75 | 2022-07-18 | Facility Study | ERCOT | Current status |
| Lytton Springs Solar | Caldwell | Solar+Battery | 75 | 2025-12-02 | Facility Study | ERCOT | Current status |
| GEN-2024-071 | Cass | Solar+Battery | 75 | 2024-10-30 | System Impact Study | AEP | Current status |
| PHOTO BESS 1 | Uvalde | Solar+Battery | 75 | 2021-10-29 | Facility Study | ERCOT | Current status |
| French Riviera Storage | Kleberg | Battery | 75 | 2023-02-09 | Facility Study | ERCOT | Current status |
| East Blackland Battery Storage SLF | Travis | Solar+Battery | 75 | 2022-11-23 | Facility Study | ERCOT | Current status |
| Proteus Vernon Solar SLF | Wilbarger | Solar+Battery | 75 | 2023-03-27 | Facility Study | ERCOT | Current status |
| VALDIVIAN SOLAR | Hunt | Solar | 75 | 2023-02-27 | Facility Study | ERCOT | Current status |
| Sunbeam Solar | San Patricio | Solar | 74 | 2024-10-29 | Facility Study | ERCOT | Current status |
| Sullivan BESS | Hidalgo | Solar+Battery | 72 | 2024-03-22 | Facility Study | ERCOT | Current status |
| Texas Sun Solar | Jackson | Solar | 72 | 2025-09-22 | Facility Study | ERCOT | Current status |
| 7L Solar SLF | Dimmit | Solar+Battery | 72 | 2025-09-22 | Facility Study | ERCOT | Current status |
| Pato Blanco Storage | Fort Bend | Battery | 71 | 2023-05-15 | Facility Study | ERCOT | Current status |
| Venture Hill Storage | Travis | Battery | 70 | 2021-02-09 | Facility Study | ERCOT | Current status |
| Edens Solar | Hill | Solar | 70 | 2023-10-25 | Facility Study | ERCOT | Current status |
| Kildare | Jackson | Solar | 70 | 2022-01-28 | Facility Study | ERCOT | Current status |
| Blue Jay Solar II | Grimes | Solar | 69 | 2021-04-13 | IA Executed | ERCOT | Current status |
| GEN-2025-SR2 | Hansford | Wind | 67 | 2025-05-05 | IA Pending | SPS | Current status |
| Symank Solar | Bosque | Solar | 67 | 2024-11-19 | Facility Study | ERCOT | Current status |
| Lamar Unit 1 Repower | Lamar | Gas | 66 | 2022-06-02 | Facility Study | ERCOT | Current status |
| Smith Lake Storage DC | Grimes | Solar+Battery | 65 | 2022-03-07 | Facility Study | ERCOT | Current status |
| Demeter Storage | Caldwell | Solar+Battery | 65 | 2022-08-05 | Facility Study | ERCOT | Current status |
| PRI Solar | Howard | Solar | 64 | 2025-07-29 | Facility Study | ERCOT | Current status |
| Starling Storage | Gonzales | Solar+Battery | 64 | 2021-01-25 | IA Executed | ERCOT | Current status |
| Iron Cowboy Storage | San Patricio | Solar+Battery | 63 | 2025-06-05 | Facility Study | ERCOT | Current status |
| Little Star Solar | Bastrop | Solar | 62 | 2024-07-01 | Facility Study | ERCOT | Current status |
| Beaverhead Solar SLF | Jim Wells | Solar+Battery | 62 | 2024-08-16 | Facility Study | ERCOT | Current status |
| Beaverhead Storage SLF | Jim Wells | Solar+Battery | 62 | 2024-08-16 | Facility Study | ERCOT | Current status |
| Honeycomb Solar SLF | Bee | Solar+Battery | 61 | 2021-11-16 | IA Executed | ERCOT | Current status |
| Orange Grove BESS | Jim Wells | Solar+Battery | 61 | 2021-07-15 | IA Executed | ERCOT | Current status |
| Centennial Solar | Menard | Solar | 61 | 2024-01-03 | Facility Study | ERCOT | Current status |
| Nymphaea Storage | Wichita | Solar+Battery | 61 | 2022-09-21 | Facility Study | ERCOT | Current status |
| Fallstone Solar SLF | Falls | Solar+Battery | 61 | 2024-12-19 | Facility Study | ERCOT | Current status |
| Bird Dog Energy Storage | Live Oak | Battery | 60 | 2021-02-04 | IA Executed | ERCOT | Current status |
| Hondo Arroyo Solar | Medina | Solar+Battery | 60 | 2024-06-13 | Facility Study | ERCOT | Current status |
| Oriana BESS | Victoria | Solar+Battery | 60 | 2021-08-25 | IA Executed | ERCOT | Current status |
| Borden Dino BESS | Borden | Solar+Battery | 60 | 2025-04-01 | Facility Study | ERCOT | Current status |
| Lampe Solar | Washington | Solar | 60 | 2021-08-03 | Facility Study | ERCOT | Current status |
| Stonewall Solar | Stonewall | Solar+Battery | 60 | 2024-05-09 | Facility Study | ERCOT | Current status |
| Tipperary Solar | Schleicher | Solar | 60 | 2024-06-13 | Facility Study | ERCOT | Current status |
| Indigo Storage | Fisher | Solar+Battery | 60 | 2022-12-15 | Facility Study | ERCOT | Current status |
| Indigo Storage 2 | Fisher | Solar+Battery | 60 | 2023-09-22 | Facility Study | ERCOT | Current status |
| Indigo Storage 3 | Fisher | Solar+Battery | 60 | 2023-11-14 | Facility Study | ERCOT | Current status |
| Indigo Storage 4 | Fisher | Solar+Battery | 60 | 2023-10-25 | Facility Study | ERCOT | Current status |
| Sol Marina Energy Center BESS | Ellis | Solar+Battery | 57 | 2023-10-25 | IA Executed | ERCOT | Current status |
| Whistle Solar | Navarro | Solar | 56 | 2021-11-23 | Facility Study | ERCOT | Current status |
| Bynum Solar Project | Coryell | Solar | 56 | 2021-12-18 | IA Executed | ERCOT | Current status |
| Longfellow BESS I | Pecos | Solar+Battery | 55 | 2022-11-07 | IA Executed | ERCOT | Current status |
| LUBIO SOLAR | Kaufman | Solar | 54 | 2020-10-07 | IA Executed | ERCOT | Current status |
| Silver Hills Windpower | Howard | Wind | 54 | 2025-04-21 | Facility Study | ERCOT | Current status |
| Donna BESS | Hidalgo | Solar+Battery | 54 | 2024-03-22 | Facility Study | ERCOT | Current status |
| Paloma Energy Center BESS | Colorado | Solar+Battery | 54 | 2024-02-07 | Facility Study | ERCOT | Current status |
| Wagon Timber Storage | Knox | Solar+Battery | 53 | 2025-01-13 | Facility Study | ERCOT | Current status |
| GEN-2026-PR1 | Ochiltree | Wind | 53 | 2025-12-01 | In Progress (unknown study) | OG&E | Current status |
| MRG Goody Storage | Lamar | Solar+Battery | 52 | 2022-05-10 | IA Executed | ERCOT | Current status |
| GEN-2023-135 | Bowie | Solar | 52 | 2023-10-02 | Facility Study | AEP | Current status |
| Sunbelt Storage | Kaufman | Solar+Battery | 52 | 2021-11-12 | Facility Study | ERCOT | Current status |
| Steppe Reserve Storage | Dimmit | Battery | 52 | 2021-01-25 | Facility Study | ERCOT | Current status |
| Orchard Ray BESS | Bee | Battery | 52 | 2023-06-07 | Facility Study | ERCOT | Current status |
| Fluvanna Max BESS SLF | Scurry | Solar+Battery | 52 | 2024-12-19 | Facility Study | ERCOT | Current status |
| Findley BESS | Limestone | Solar+Battery | 52 | 2024-02-07 | Facility Study | ERCOT | Current status |
| Ryan Energy Storage | Coryell | Battery | 52 | 2019-01-15 | IA Executed | ERCOT | Current status |
| Proving Ground BESS | Schleicher | Solar+Battery | 51 | 2023-07-10 | Facility Study | ERCOT | Current status |
| Ayass BESS | Throckmorton | Battery | 51 | 2023-12-04 | Facility Study | ERCOT | Current status |
| GPlains Storage | Ector | Solar+Battery | 51 | 2025-04-21 | Facility Study | ERCOT | Current status |
| Big River BESS | Zapata | Solar+Battery | 51 | 2021-05-04 | Facility Study | ERCOT | Current status |
| BLACK BEAR BESS | Crockett | Solar+Battery | 51 | 2023-12-04 | Facility Study | ERCOT | Current status |
| Crocus Storage | Stephens | Solar+Battery | 51 | 2025-01-28 | Facility Study | ERCOT | Current status |
| Lumberjack Storage | Cherokee | Battery | 51 | 2021-08-12 | IA Executed | ERCOT | Current status |
| Midpoint Storage | Hill | Battery | 51 | 2021-10-15 | IA Executed | ERCOT | Current status |
| Blanket Ranch North Storage | Brown | Solar+Battery | 51 | 2022-06-10 | Facility Study | ERCOT | Current status |
| Lupinus Storage 3 | Franklin | Solar+Battery | 51 | 2023-09-23 | IA Executed | ERCOT | Current status |
| Isaac Solar | Matagorda | Solar | 51 | 2022-11-07 | IA Executed | ERCOT | Current status |
| Volunteer Storage | Caldwell | Battery | 51 | 2019-01-15 | Facility Study | ERCOT | Current status |
| Hooper Solar | Lee | Solar+Battery | 50 | 2022-12-07 | Facility Study | ERCOT | Current status |
| Stegall Storage | Robertson | Solar+Battery | 50 | 2023-08-21 | Facility Study | ERCOT | Current status |
| Dori BQ Solar | Harris | Solar+Battery | 50 | 2020-06-09 | IA Executed | ERCOT | Current status |
| Albatross BESS | Mclennan | Battery | 50 | 2022-05-16 | Facility Study | ERCOT | Current status |
| Findley Solar | Limestone | Solar+Battery | 50 | 2021-10-05 | Facility Study | ERCOT | Current status |
| Surfside Energy Storage | Brazoria | Battery | 50 | 2023-07-19 | Facility Study | ERCOT | Current status |
| Pearl Crescent Storage | Colorado | Solar+Battery | 50 | 2019-12-20 | Facility Study | ERCOT | Current status |
| Fort Chadbourne Cattle BESS | Coke | Battery | 50 | 2023-08-21 | Facility Study | ERCOT | Current status |
| Beeman BESS | Gonzales | Battery | 50 | 2023-04-19 | Facility Study | ERCOT | Current status |
| Marick Rose BESS | Fort Bend | Battery | 50 | 2023-07-10 | Facility Study | ERCOT | Current status |
| MAKALU SOLAR | Hunt | Solar | 50 | 2021-01-21 | Facility Study | ERCOT | Current status |
| Voyager Storage | Wharton | Battery | 50 | 2019-01-14 | Facility Study | ERCOT | Current status |
| SS50S | El Paso | Solar | 50 | 2022-09-30 | IA Executed | El Paso Electric Company | Current status |
| GEN-2023-SR9 | Crosby | Battery | 50 | 2023-02-13 | IA Executed | Xcel | Current status |
| GEN-2024-305 | Marion | Battery | 50 | 2025-03-01 | System Impact Study | AEP | Current status |
| Red Holly Storage 1 | Dawson | Solar+Battery | 50 | 2018-07-11 | IA Executed | ERCOT | Current status |
| Red Holly Storage | Dawson | Solar+Battery | 50 | 2018-09-27 | IA Executed | ERCOT | Current status |
| Chariot Storage | Limestone | Battery | 50 | 2019-03-06 | Facility Study | ERCOT | Current status |
| Edgewater Storage | Ellis | Battery | 50 | 2019-04-08 | Facility Study | ERCOT | Current status |
| Limewood Storage | Bell | Solar+Battery | 50 | 2021-04-30 | IA Executed | ERCOT | Current status |
| Brightside Solar Alt POI | Live Oak | Solar | 50 | 2022-05-16 | IA Executed | ERCOT | Current status |
| Barcelona TxHSR TPSS HN-4 | Harris | Other | 50 | 2019-01-30 | Facility Study | ERCOT | Current status |
| Tokyo TxHSR TPSS EW-1 | Ellis | Other | 50 | 2019-01-30 | Facility Study | ERCOT | Current status |
| Atlanta TxHSR TPSS DS-1 | Dallas | Other | 50 | 2019-01-30 | Facility Study | ERCOT | Current status |
| Turin TxHSR TPSS HN-6 | Grimes | Other | 50 | 2019-09-27 | Facility Study | ERCOT | Current status |
| Dart Energy Storage A1 | Taylor | Battery | 50 | 2025-02-25 | Facility Study | ERCOT | Current status |
| Apogee Wind II | Throckmorton | Wind | 47 | 2021-07-13 | Facility Study | ERCOT | Current status |
| Sword BESS | Starr | Solar+Battery | 44 | 2024-03-22 | Facility Study | ERCOT | Current status |
| Horse13 CallD repower | Taylor | Wind | 44 | 2016-10-03 | IA Executed | ERCOT | Current status |
| HHGT repower Horse13+CallD | Taylor | Wind | 44 | 2016-10-03 | IA Executed | ERCOT | Current status |
| Electric E - West Texas Generation | Loving | Gas | 44 | 2024-10-18 | Facility Study | ERCOT | Current status |
| Graphic Packaging Gas | Mclennan | Gas | 43 | 2024-01-11 | Facility Study | ERCOT | Current status |
| Hector Storage | Navarro | Solar+Battery | 43 | 2022-10-24 | Facility Study | ERCOT | Current status |
| Braswell Solar | Mclennan | Solar | 43 | 2021-08-30 | Facility Study | ERCOT | Current status |
| Pamplona Solar | Austin | Solar+Battery | 42 | 2023-08-14 | Facility Study | ERCOT | Current status |
| La Mancha Solar SLF | Zavala | Solar+Battery | 41 | 2024-11-19 | Facility Study | ERCOT | Current status |
| La Mancha Storage SLF | Zavala | Solar+Battery | 41 | 2024-11-19 | Facility Study | ERCOT | Current status |
| Buck Ranch Solar SLF | Live Oak | Solar+Battery | 41 | 2024-12-19 | Facility Study | ERCOT | Current status |
| Buck Ranch Storage SLF | Live Oak | Solar+Battery | 41 | 2025-01-28 | Facility Study | ERCOT | Current status |
| Paolo Sole Hamilton Solar | Hamilton | Solar | 41 | 2025-05-27 | Facility Study | ERCOT | Current status |
| Paolo Sole Gustine Solar | Comanche | Solar | 40 | 2025-05-27 | Facility Study | ERCOT | Current status |
| Ashra Solar SLF | Uvalde | Solar+Battery | 40 | 2025-04-25 | Facility Study | ERCOT | Current status |
| SP TX-12B Phase III | Upton | Solar | 40 | 2018-09-12 | Facility Study | ERCOT | Current status |
| Lueders Solar | Haskell | Solar | 40 | 2017-07-11 | Facility Study | ERCOT | Current status |
| TAIN SOLAR | Caldwell | Solar | 38 | 2020-12-03 | Facility Study | ERCOT | Current status |
| Delaware Ranch Solar | Culberson | Solar | 36 | 2020-12-22 | IA Executed | ERCOT | Current status |
| Blanket Ranch South Storage | Brown | Solar+Battery | 34 | 2022-06-10 | Facility Study | ERCOT | Current status |
| Rocinante BESS | Gonzales | Solar+Battery | 33 | 2021-04-22 | IA Executed | ERCOT | Current status |
| Eagle Springs Storage | Delta | Solar+Battery | 33 | 2021-10-18 | IA Executed | ERCOT | Current status |
| Capricorn I & III repower | Sterling | Wind | 32 | 2017-03-09 | IA Executed | ERCOT | Current status |
| Meridian BESS | Bosque | Battery | 31 | 2023-03-13 | Facility Study | ERCOT | Current status |
| Lager Storage | Nueces | Battery | 31 | 2022-02-28 | Facility Study | ERCOT | Current status |
| Hooper Storage | Lee | Solar+Battery | 31 | 2022-12-07 | Facility Study | ERCOT | Current status |
| Pitts Dudik II | Hill | Solar | 30 | 2022-07-18 | IA Executed | ERCOT | Current status |
| M-Bar Solar I | Ector | Solar+Battery | 30 | 2024-12-19 | Facility Study | ERCOT | Current status |
| Enchanted Rock NEWPP | Harris | Gas | 30 | 2021-11-10 | IA Executed | ERCOT | Current status |
| HILLBORO WIND | Hill | Wind+Battery | 28 | 2024-07-01 | Facility Study | ERCOT | Current status |
| E291 | Hydro | 27 | 2012-05-15 | IA Executed | MISO | Current status | |
| Zeus Rusk Solar | Rusk | Solar+Battery | 27 | 2024-03-22 | Facility Study | ERCOT | Current status |
| Fowler Ranch Storage | Crane | Battery | 26 | 2021-06-21 | Facility Study | ERCOT | Current status |
| NET Power Demonstration plant | Harris | Gas | 26 | 2023-12-20 | Facility Study | ERCOT | Current status |
| Kennedy Storage | Navarro | Solar+Battery | 25 | 2022-07-18 | Facility Study | ERCOT | Current status |
| Burro Loco Energy Storage | Cameron | Battery | 25 | 2022-07-18 | Facility Study | ERCOT | Current status |
| Hayhurst Texas Solar | Culberson | Solar | 25 | 2020-08-21 | IA Executed | ERCOT | Current status |
| CPS Energy AvR1CT2 Rotor Replacement | Bexar | Gas | 23 | 2023-10-13 | Facility Study | ERCOT | Current status |
| Brazos Wind Repower | Scurry | Wind | 22 | 2020-12-22 | Facility Study | ERCOT | Current status |
| Wise County Power Repower (CT1, CT2) | Wise | Gas | 21 | 2019-07-25 | IA Executed | ERCOT | Current status |
| Shannon Wind Repower | Archer | Wind | 19 | 2024-02-27 | Facility Study | ERCOT | Current status |
| Hays Energy Unit 3 Repower | Hays | Gas | 18 | 2020-10-07 | Facility Study | ERCOT | Current status |
| Midlothian Unit 2 repower | Ellis | Gas | 18 | 2021-01-25 | Facility Study | ERCOT | Current status |
| Midlothian 4 repower | Ellis | Gas | 18 | 2021-04-26 | Facility Study | ERCOT | Current status |
| Midlothian Unit 3 repower | Ellis | Gas | 18 | 2021-05-24 | Facility Study | ERCOT | Current status |
| Hays Energy Unit 2 Repower | Hays | Gas | 18 | 2022-02-21 | Facility Study | ERCOT | Current status |
| Buzzi Maryneal Wind Project | Nolan | Wind | 18 | 2023-10-25 | Facility Study | ERCOT | Current status |
| Greater Bryant G Solar | Midland | Solar | 18 | 2021-06-17 | IA Executed | ERCOT | Current status |
| Anchor Wind III | Eastland | Wind | 16 | 2021-12-03 | IA Executed | ERCOT | Current status |
| Air Products GCA | Galveston | Gas | 14 | 2018-06-07 | IA Executed | ERCOT | Current status |
| Stephens Ranch Wind Repower | Borden | Wind | 12 | 2023-06-28 | Facility Study | ERCOT | Current status |
| CPS AvR CT1 Rotor Replacement | Bexar | Gas | 11 | 2022-10-24 | Facility Study | ERCOT | Current status |
| Panther Creek 1 Repower | Glasscock | Wind | 11 | 2023-06-28 | Facility Study | ERCOT | Current status |
| IEP Orchard BESS | Fort Bend | Battery | 10 | IA Executed | ERCOT | Current status | |
| Damon BESS 2 | Brazoria | Battery | 10 | 2023-05-17 | IA Executed | ERCOT | Current status |
| Carrizo Springs BESS | Dimmit | Battery | 10 | 2024-08-22 | IA Executed | ERCOT | Current status |
| Escondido BESS | Maverick | Battery | 10 | IA Executed | ERCOT | Current status | |
| Lantana BESS | Nueces | Battery | 10 | 2024-04-03 | IA Executed | ERCOT | Current status |
| East Harrison BESS | Cameron | Battery | 10 | IA Executed | ERCOT | Current status | |
| Olmito BESS | Cameron | Battery | 10 | IA Executed | ERCOT | Current status | |
| Beck_Road BESS1 | Bexar | Battery | 10 | 2025-07-11 | IA Executed | ERCOT | Current status |
| Alamo Street BESS | Pecos | Battery | 10 | 2025-04-25 | IA Executed | ERCOT | Current status |
| Downtown BESS | Pecos | Battery | 10 | IA Executed | ERCOT | Current status | |
| Elm Street BESS2 | Reeves | Battery | 10 | IA Executed | ERCOT | Current status | |
| Mesquite BESS2 | Cameron | Battery | 10 | 2025-03-28 | IA Executed | ERCOT | Current status |
| North Edinburg BESS 1 | Hidalgo | Battery | 10 | 2025-05-22 | IA Executed | ERCOT | Current status |
| Harlingen #1 BESS 1 | Cameron | Battery | 10 | 2025-05-22 | IA Executed | ERCOT | Current status |
| Staghorn Gas | Ward | Gas | 10 | 2025-05-29 | IA Executed | ERCOT | Current status |
| DAMON BESS3 | Brazoria | Battery | 10 | IA Executed | ERCOT | Current status | |
| Little York BESS | Harris | Battery | 10 | IA Executed | ERCOT | Current status | |
| COYOTE SPRINGS AGR1 | Reeves | Oil | 10 | IA Executed | ERCOT | Current status | |
| SADDLEBACK AGR1 | Reeves | Oil | 10 | IA Executed | ERCOT | Current status | |
| OLNEY AGR1 | Young | Oil | 10 | IA Executed | ERCOT | Current status | |
| Empire Central BESS | Dallas | Battery | 10 | 2024-01-29 | IA Executed | ERCOT | Current status |
| Poteet BESS | Atascosa | Battery | 10 | 2024-10-17 | IA Executed | ERCOT | Current status |
| Gears BESS2 | Harris | Battery | 10 | IA Executed | ERCOT | Current status | |
| BERRY BESS1 | Harris | Battery | 10 | 2025-02-06 | IA Executed | ERCOT | Current status |
| Knapp BESS | Scurry | Battery | 10 | 2025-03-06 | IA Executed | ERCOT | Current status |
| Meadow Park BESS | Tarrant | Battery | 10 | 2025-06-19 | IA Executed | ERCOT | Current status |
| Cedro Hill Wind Repower | Webb | Wind | 10 | 2023-09-28 | IA Executed | ERCOT | Current status |
| Laureles BESS | Cameron | Battery | 10 | 2022-10-21 | IA Executed | ERCOT | Current status |
| Torrecillas BESS | Webb | Battery | 10 | IA Executed | ERCOT | Current status | |
| Milton BESS | Karnes | Battery | 10 | IA Executed | ERCOT | Current status | |
| Hidden Lakes BESS | Galveston | Battery | 10 | 2023-06-14 | IA Executed | ERCOT | Current status |
| Hidden Valley BESS | Harris | Battery | 10 | IA Executed | ERCOT | Current status | |
| Gears BESS | Harris | Battery | 10 | 2023-06-28 | IA Executed | ERCOT | Current status |
| Palmview BESS | Hidalgo | Battery | 10 | IA Executed | ERCOT | Current status | |
| Cotulla BESS 1 | La Salle | Battery | 10 | IA Executed | ERCOT | Current status | |
| SE Edinburg BESS | Hidalgo | Battery | 10 | IA Executed | ERCOT | Current status | |
| Lyssy BESS | Wilson | Battery | 10 | IA Executed | ERCOT | Current status | |
| Buda BESS | Hays | Battery | 10 | IA Executed | ERCOT | Current status | |
| Elm Street BESS | Reeves | Battery | 10 | IA Executed | ERCOT | Current status | |
| BESS Stadium | Jim Wells | Battery | 10 | IA Executed | ERCOT | Current status | |
| MESQUITE BESS | Cameron | Battery | 10 | IA Executed | ERCOT | Current status | |
| Abilene Elmcreek BESS | Taylor | Battery | 10 | 2024-09-12 | IA Executed | ERCOT | Current status |
| Abilene Industrial Park BESS | Taylor | Battery | 10 | 2024-09-12 | IA Executed | ERCOT | Current status |
| Cedarvale Gas | Ward | Gas | 10 | 2024-10-01 | IA Executed | ERCOT | Current status |
| Pyote Gas | Ward | Gas | 10 | IA Executed | ERCOT | Current status | |
| Hollywood Solar Repower | Wharton | Solar | 10 | IA Executed | ERCOT | Current status | |
| County Road BESS | Reeves | Battery | 10 | IA Executed | ERCOT | Current status | |
| Highway 6 BESS | Brazos | Battery | 10 | IA Executed | ERCOT | Current status | |
| Apple BESS | Ector | Battery | 10 | IA Executed | ERCOT | Current status | |
| Medina Lake BESS | Bandera | Battery | 10 | 2022-11-29 | IA Executed | ERCOT | Current status |
| Utopia BESS | Bandera | Battery | 10 | 2022-11-29 | IA Executed | ERCOT | Current status |
| Indian Mesa repower | Pecos | Wind | 9 | 2018-05-22 | IA Executed | ERCOT | Current status |
| Panther Creek 2 Repower | Glasscock | Wind | 8 | 2023-06-28 | Facility Study | ERCOT | Current status |
| Sweetwater 2 repower | Nolan | Wind | 7 | 2017-10-05 | IA Executed | ERCOT | Current status |
| Desert Sky repower | Pecos | Wind | 7 | 2017-11-08 | IA Executed | ERCOT | Current status |
| Trent repower | Nolan | Wind | 6 | 2017-11-08 | IA Executed | ERCOT | Current status |
| Roadrunner Crossing Wind (Uprate) | Eastland | Wind+Battery | 3 | 2025-12-23 | Facility Study | ERCOT | Current status |
| Rio Nogales CT1 Rotor Replacement | Guadalupe | Gas | 3 | IA Executed | ERCOT | Current status | |
| CPS Rio Nogales CT301 Rotor Replacement | Guadalupe | Gas | 3 | 2023-07-06 | IA Executed | ERCOT | Current status |
| CPS Rio Nogales CT201 Rotor Replacement | Guadalupe | Gas | 3 | IA Executed | ERCOT | Current status | |
| Sweetwater 1 repower | Nolan | Wind | 3 | 2018-02-09 | IA Executed | ERCOT | Current status |
| Ashra Storage SLF | Uvalde | Solar+Battery | 2 | 2025-04-25 | Facility Study | ERCOT | Current status |
| Kickstart Energy Storage I | Ellis | Battery | 1 | 2025-03-24 | Facility Study | ERCOT | Current status |
| Kickstart Energy Storage II | Ellis | Battery | 1 | 2025-03-24 | Facility Study | ERCOT | Current status |
| Kickstart Energy Storage III | Ellis | Battery | 1 | 2025-03-24 | Facility Study | ERCOT | Current status |
| Kickstart Energy Storage IV | Ellis | Battery | 1 | 2025-03-24 | Facility Study | ERCOT | Current status |
| Champion Wind Repower | Nolan | Wind | 0 | 2023-09-25 | IA Executed | ERCOT | Current status |
| Silver Star repower | Eastland | Wind | -7 | 2017-04-05 | IA Executed | ERCOT | Current status |
| Sherbino II Wind repower | Pecos | Wind | -18 | 2017-08-18 | IA Executed | ERCOT | Current status |
| Trinity Hills Wind repower | Young | Wind | -27 | 2017-07-20 | IA Executed | ERCOT | Current status |
| GIGA AUSTIN SOLAR | Travis | Solar | -53 | 2022-07-18 | Facility Study | ERCOT | Current status |
Lawrence Berkeley National Laboratory and GridTracker · Queued Up: Interconnection Queue Data File (Lawrence Berkeley National Laboratory) · data for 2025 · as of May 7, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0 May be out of date. The next release was due by May 7, 2027. Last checked for an update: Oct 31, 2026.