Interconnection queue in Michigan
Data: Lawrence Berkeley National Laboratory and GridTracker, Queued Up, as of Dec 31, 2025.
This is an annual snapshot. A request's status may have changed since. Current status at Interconnection.fyi.
LBNL licenses the file CC BY 4.0, so project rows are shown and the file can be downloaded from our data library.
Statewide
- Active capacity
- 58,466 MW
- Active requests
- 304
- Median years in queue (active)
- 3.3
- Withdrawn, of requests entered by 2020
- 66%
| Type | Active capacity (MW) | Projects |
|---|---|---|
| Solar | 22,231 | 141 |
| Wind | 6,049 | 29 |
| Storage | 14,731 | 85 |
| Gas | 9,742 | 14 |
| Hybrid | 4,992 | 29 |
| Other | 721 | 6 |
By county
| County | Active capacity (MW) | Projects | Solar | Wind | Storage | Gas | Hybrid | Other | Median years in queue (active) | Withdrawn, of requests entered by 2020 |
|---|---|---|---|---|---|---|---|---|---|---|
| Monroe | 4,988 | 10 | 500 | 1,490 | 2,998 | 0.9 | ||||
| Huron | 3,855 | 17 | 550 | 1,475 | 1,830 | 1.7 | 42% of 24 | |||
| Washtenaw | 3,053 | 13 | 884 | 520 | 1,414 | 235 | 3.4 | |||
| Branch | 2,975 | 12 | 800 | 580 | 1,445 | 150 | 1.2 | |||
| Van Buren | 2,493 | 14 | 883 | 725 | 150 | 735 | 3.3 | |||
| Livingston | 2,437 | 7 | 575 | 160 | 1,452 | 250 | 3.3 | |||
| Sanilac | 2,361 | 11 | 1,598 | 513 | 250 | 3.3 | ||||
| Calhoun | 2,327 | 12 | 1,279 | 300 | 748 | 4.4 | ||||
| Ottawa | 2,248 | 7 | 200 | 210 | 1,089 | 749 | 3.3 | |||
| Lenawee | 2,085 | 13 | 970 | 575 | 400 | 150 | -10 | 1.7 | ||
| Saginaw | 2,045 | 12 | 995 | 146 | 904 | 1.8 | ||||
| Genesee | 1,893 | 6 | 175 | 450 | 1,268 | 1.7 | ||||
| Mason | 1,555 | 8 | 885 | 670 | 3.3 | |||||
| Tuscola | 1,533 | 10 | 765 | 217 | 450 | 100 | 1.7 | |||
| Montcalm | 1,347 | 8 | 332 | 300 | 375 | 340 | 3.7 | |||
| Wayne | 1,228 | 8 | 950 | 50 | 220 | 8 | 3.8 | |||
| Shiawassee | 1,170 | 6 | 370 | 480 | 150 | 170 | 1.1 | |||
| Cass | 1,081 | 6 | 731 | 150 | 200 | 3.1 | ||||
| Bay | 1,054 | 7 | 385 | 504 | 165 | 1.7 | ||||
| Muskegon | 950 | 7 | 600 | 200 | 150 | 1.7 | ||||
| Eaton | 928 | 4 | 178 | 750 | 0.5 | |||||
| St. Clair | 920 | 5 | 500 | 420 | 3.3 | |||||
| Gratiot | 880 | 7 | 125 | 375 | 200 | 180 | 3.7 | |||
| Allegan | 820 | 4 | 650 | 170 | 2.5 | |||||
| Ionia | 796 | 4 | 400 | 396 | 4.2 | |||||
| St. Joseph | 682 | 4 | 382 | 300 | 2.0 | |||||
| Isabella | 644 | 4 | 464 | 180 | 2.1 | |||||
| Kalamazoo | 626 | 4 | 220 | 400 | 6 | 3.7 | ||||
| Lapeer | 600 | 3 | 300 | 300 | 1.7 | |||||
| Jackson | 595 | 5 | 225 | 370 | 4.1 | |||||
| Midland | 575 | 4 | 375 | 150 | 50 | 2.5 | ||||
| Presque Isle | 552 | 3 | 300 | 252 | 3.3 | |||||
| Hillsdale | 486 | 4 | 470 | 16 | 2.5 | |||||
| Oceana | 470 | 4 | 230 | 240 | 3.3 | |||||
| Alcona | 452 | 3 | 452 | 1.8 | ||||||
| Clinton | 450 | 2 | 150 | 300 | 2.2 | |||||
| Ogemaw | 436 | 2 | 436 | 1.7 | ||||||
| Ingham | 415 | 3 | 315 | 100 | 2.3 | |||||
| Otsego | 405 | 4 | 350 | 60 | -5 | 4.2 | ||||
| Arenac | 355 | 2 | 355 | 1.8 | ||||||
| Grand Traverse | 335 | 2 | 135 | 200 | 1.1 | |||||
| Marquette | 316 | 4 | 312 | 4 | 3.9 | |||||
| Wexford | 300 | 1 | 300 | 1.7 | ||||||
| Gladwin | 295 | 3 | 270 | 25 | 4.1 | |||||
| Berrien | 280 | 2 | 280 | 3.8 | ||||||
| Macomb | 254 | 3 | 252 | 2 | 3.3 | |||||
| Osceola | 250 | 2 | 250 | 2.5 | ||||||
| Clare | 225 | 1 | 225 | 3.3 | ||||||
| Newaygo | 220 | 1 | 220 | 4.4 | ||||||
| Delta | 205 | 2 | 150 | 55 | 3.5 | |||||
| Cheboygan | 202 | 2 | 202 | 3.0 | ||||||
| Kenosha | 200 | 1 | 200 | 1.7 | ||||||
| Mackinac | 160 | 1 | 160 | 1.7 | ||||||
| Iosco | 155 | 2 | 155 | 3.8 | ||||||
| Barry | 150 | 1 | 150 | 4.3 | ||||||
| Dickinson | 148 | 4 | 148 | 2.3 | ||||||
| Kalkaska | 13 | 1 | 13 | 3.3 | ||||||
| Baraga | 2 | 1 | 2 | 1.7 | ||||||
| Kent | 0 | 0 | ||||||||
| Schoolcraft | 0 | 0 | ||||||||
| Manistee | 0 | 0 | ||||||||
| Missaukee | 0 | 0 | ||||||||
| Ontonagon | 0 | 0 | ||||||||
| Houghton | 0 | 0 | ||||||||
| Antrim | 0 | 0 | ||||||||
| Oakland | 0 | 0 | ||||||||
| Chippewa | 0 | 0 | ||||||||
| Mecosta | 0 | 0 | ||||||||
| Alger | 0 | 0 | ||||||||
| Iron | 0 | 0 | ||||||||
| Leelanau | 0 | 0 | ||||||||
| Roscommon | 0 | 0 | ||||||||
| Crawford | 0 | 0 | ||||||||
| Oscoda | 0 | 0 | ||||||||
| County not given | -8 | 1 | -8 | 20.8 |
Capacity is each request's first-listed capacity, so a hybrid's battery is not added on top. Most requests in a queue never get built.
Active requests
Status is as of Dec 31, 2025. Current status at Interconnection.fyi.
| Project | County | Type | MW | Entered the queue | Study phase | Utility or operator | Live status |
|---|---|---|---|---|---|---|---|
| J4024 | Monroe | Gas | 1,499 | 2025-05-05 | ITC | Current status | |
| J4025 | Monroe | Gas | 1,499 | 2025-05-05 | ITC | Current status | |
| J3799 | Livingston | Gas | 1,452 | 2024-04-18 | MISO | Current status | |
| J3922 | Branch | Gas | 1,445 | 2025-03-04 | METC | Current status | |
| J3923 | Washtenaw | Gas | 1,414 | 2025-02-28 | ITC | Current status | |
| J3935 | Genesee | Gas | 1,268 | 2025-02-28 | METC | Current status | |
| Replacing 749 MW of coal generation with BESS; Campbell 3 | Ottawa | Other+Battery | 749 | 2023-11-09 | METC | Current status | |
| J4040 | Van Buren | Nuclear | 735 | 2025-07-25 | METC | Current status | |
| J4159 | Ottawa | Gas | 664 | 2025-08-13 | METC | Current status | |
| J4102 | Cass | Solar | 539 | 2025-10-10 | METC | Current status | |
| J2590 | Huron | Battery | 500 | 2022-09-15 | Cluster Study | ITC | Current status |
| J1586 | Calhoun | Solar+Battery | 499 | 2020-06-25 | IA Executed | ITC | Current status |
| J3966 | Huron | Wind | 480 | 2025-04-01 | ITC | Current status | |
| Monroe ERAS | Monroe | Battery | 432 | 2025-08-06 | In Progress (unknown study) | DTE Electric | Current status |
| J4160 | Ottawa | Gas | 425 | 2025-08-13 | METC | Current status | |
| J3992 | Eaton | Battery | 400 | 2025-04-17 | METC | Current status | |
| J4093 | Mason | Battery | 400 | 2025-10-06 | METC | Current status | |
| J3994 | Monroe | Battery | 360 | 2025-04-17 | METC | Current status | |
| J3872 | Wayne | Battery | 350 | 2025-01-27 | ITC | Current status | |
| J4203 | Huron | Wind | 350 | 2025-06-06 | ITC | Current status | |
| J2098 | Calhoun | Solar | 309 | 2021-08-22 | Cluster Study | METC | Current status |
| J3723 | Wexford | Solar | 300 | 2024-04-15 | In Progress (unknown study) | METC | Current status |
| J3843 | Saginaw | Solar | 300 | 2024-11-21 | METC | Current status | |
| J3866 | Lapeer | Wind | 300 | 2024-12-06 | ITC | Current status | |
| J3887 | Montcalm | Wind | 300 | 2025-01-10 | METC | Current status | |
| J4016 | Tuscola | Battery | 300 | 2025-05-20 | ITC | Current status | |
| J4094 | Huron | Battery | 300 | 2025-10-06 | ITC | Current status | |
| J4095 | Huron | Battery | 300 | 2025-10-06 | ITC | Current status | |
| J4195 | Clinton | Wind | 300 | 2025-10-09 | MISO | Current status | |
| Three Lakes Solar | St. Joseph | Solar+Battery | 300 | 2019-09-25 | System Impact Study | AEP | Current status |
| J3282 | Mason | Solar | 297 | 2024-04-15 | In Progress (unknown study) | METC | Current status |
| J1557 | Sanilac | Wind | 293 | 2020-06-23 | IA Executed | ITC | Current status |
| J3274 | Ogemaw | Solar | 290 | 2024-04-15 | In Progress (unknown study) | METC | Current status |
| J3313 | Lenawee | Wind | 263 | 2024-04-16 | In Progress (unknown study) | METC | Current status |
| J3050 | Calhoun | Solar | 255 | 2025-07-29 | Cluster Study | METC | Current status |
| J3971 | Huron | Wind | 255 | 2025-04-01 | ITC | Current status | |
| J3361 | Bay | Wind | 254 | 2024-04-12 | In Progress (unknown study) | MISO | Current status |
| J2260 | Presque Isle | Wind | 252 | 2021-10-07 | Cluster Study | METC | Current status |
| J1614 | Muskegon | Solar | 250 | 2020-06-11 | IA Executed | METC | Current status |
| J2100 | Van Buren | Battery | 250 | 2021-08-13 | Cluster Study | METC | Current status |
| J2139 | Livingston | Solar+Battery | 250 | 2021-09-02 | Cluster Study | ITC | Current status |
| J2628 | Huron | Battery | 250 | 2022-09-15 | Cluster Study | ITC | Current status |
| J2921 | Calhoun | Solar | 250 | 2022-09-15 | Cluster Study | ITC | Current status |
| J3438 | Saginaw | Battery | 250 | 2024-03-26 | In Progress (unknown study) | METC | Current status |
| J3656 | Saginaw | Battery | 250 | 2024-03-26 | In Progress (unknown study) | ITC | Current status |
| J3836 | Eaton | Battery | 250 | 2024-10-24 | METC | Current status | |
| J3845 | Monroe | Battery | 250 | 2024-11-27 | ITC | Current status | |
| J3865 | Shiawassee | Wind | 250 | 2024-12-08 | METC | Current status | |
| J3977 | Sanilac | Battery | 250 | 2025-03-31 | ITC | Current status | |
| J4026 | Lenawee | Battery | 250 | 2025-05-21 | METC | Current status | |
| J4058 | Huron | Battery | 250 | 2025-08-22 | ITC | Current status | |
| J4066 | Isabella | Solar | 250 | 2025-09-24 | ITC | Current status | |
| J4167 | Allegan | Battery | 250 | 2025-09-17 | METC | Current status | |
| FERMI Storage Project | Monroe | Battery | 248 | 2025-08-06 | In Progress (unknown study) | DTE Electric | Current status |
| J3945 | Washtenaw | Solar | 245 | 2025-04-07 | ITC | Current status | |
| J2567 | Oceana | Battery | 240 | 2022-09-15 | Cluster Study | METC | Current status |
| J3864 | Shiawassee | Wind | 230 | 2024-12-09 | METC | Current status | |
| J2668 | Mason | Solar | 225 | 2022-09-14 | Cluster Study | WOLVERINE POWER SUPPLY COOPERATIVE | Current status |
| J2673 | Clare | Solar | 225 | 2022-09-14 | Cluster Study | METC | Current status |
| J3696 | Montcalm | Battery | 225 | 2024-04-15 | In Progress (unknown study) | METC | Current status |
| J3838 | Ingham | Solar | 225 | 2024-04-18 | METC | Current status | |
| J2670 | Mason | Solar | 223 | 2022-09-14 | Cluster Study | METC | Current status |
| J2001 | Newaygo | Solar | 220 | 2021-08-16 | Cluster Study | METC | Current status |
| J2444 | Van Buren | Solar | 220 | 2022-09-14 | Cluster Study | METC | Current status |
| J2814 | Kalamazoo | Solar | 220 | 2022-09-07 | Cluster Study | METC | Current status |
| J3496 | Sanilac | Wind | 220 | 2024-04-12 | In Progress (unknown study) | ITC | Current status |
| J3646 | St. Clair | Battery | 220 | 2024-04-17 | In Progress (unknown study) | MISO | Current status |
| Replacing 220 MW of coal generation with BESS; Trenton Channel 9 | Wayne | Other+Battery | 220 | 2023-10-11 | METC | Current status | |
| J2611 | Alcona | Solar | 215 | 2022-09-14 | Cluster Study | METC | Current status |
| J3940 | Isabella | Solar | 214 | 2025-02-14 | METC | Current status | |
| Deckerville Solar Park Project | Sanilac | Solar | 213 | 2025-08-06 | In Progress (unknown study) | DTE Electric | Current status |
| J1062 | Washtenaw | Solar | 200 | 2018-03-12 | IA Executed | ITC MIDWEST | Current status |
| J1196 | Sanilac | Solar | 200 | 2019-04-25 | IA Executed | ITC MIDWEST | Current status |
| J1226 | Lenawee | Solar | 200 | 2019-04-27 | Construction | METC | Current status |
| J1255 | Ionia | Solar | 200 | 2019-04-29 | Construction | METC | Current status |
| J1379 | Montcalm | Solar | 200 | 2019-04-29 | IA Executed | METC | Current status |
| J1525 | Huron | Solar | 200 | 2020-06-12 | IA Executed | ITC | Current status |
| J1550 | Branch | Solar | 200 | 2020-06-22 | IA Executed | METC | Current status |
| J1571 | Lenawee | Solar | 200 | 2021-12-03 | IA Executed | METC | Current status |
| J1603 | Otsego | Solar | 200 | 2021-12-03 | IA Executed | METC | Current status |
| J1663 | Ottawa | Solar | 200 | 2021-12-03 | Construction | METC | Current status |
| J1664 | St. Clair | Solar | 200 | 2020-06-24 | IA Executed | ITC | Current status |
| J1894 | Kalamazoo | Battery | 200 | 2021-10-29 | Cluster Study | METC | Current status |
| J1900 | Wayne | Battery | 200 | 2021-08-13 | Cluster Study | ITC | Current status |
| J1902 | Wayne | Battery | 200 | 2021-08-13 | Cluster Study | ITC | Current status |
| J2061 | Saginaw | Solar | 200 | 2021-08-12 | Cluster Study | METC | Current status |
| J2374 | Sanilac | Solar | 200 | 2022-09-15 | Cluster Study | ITC | Current status |
| J2475 | Monroe | Battery | 200 | 2022-09-15 | Cluster Study | ITC | Current status |
| J2485 | Livingston | Solar | 200 | 2022-09-14 | Cluster Study | ITC | Current status |
| J2486 | Monroe | Solar | 200 | 2022-09-14 | Cluster Study | ITC | Current status |
| J2667 | Sanilac | Solar | 200 | 2022-09-14 | Cluster Study | ITC | Current status |
| J2672 | Shiawassee | Solar | 200 | 2022-09-14 | Cluster Study | METC | Current status |
| J2676 | Huron | Solar | 200 | 2022-09-14 | Cluster Study | ITC | Current status |
| J2677 | St. Clair | Solar | 200 | 2022-09-14 | Cluster Study | ITC | Current status |
| J2684 | St. Clair | Battery | 200 | 2022-09-08 | Cluster Study | MISO | Current status |
| J2799 | Van Buren | Battery | 200 | 2025-10-25 | Cluster Study | METC | Current status |
| J2822 | Van Buren | Battery | 200 | 2022-09-08 | Cluster Study | METC | Current status |
| J2877 | Midland | Solar | 200 | 2022-09-14 | Cluster Study | METC | Current status |
| J2878 | Sanilac | Solar | 200 | 2022-09-14 | Cluster Study | ITC | Current status |
| J2889 | Allegan | Battery | 200 | 2022-09-14 | Cluster Study | METC | Current status |
| J2906 | Kalamazoo | Battery | 200 | 2022-09-15 | Cluster Study | METC | Current status |
| J2991 | Wayne | Battery | 200 | 2022-09-14 | Cluster Study | ITC | Current status |
| J3251 | Genesee | Battery | 200 | 2024-04-15 | In Progress (unknown study) | METC | Current status |
| J3286 | Sanilac | Solar | 200 | 2024-04-15 | In Progress (unknown study) | ITC | Current status |
| J3287 | Osceola | Solar | 200 | 2024-04-15 | In Progress (unknown study) | WOLVERINE POWER SUPPLY COOPERATIVE | Current status |
| J3472 | Lapeer | Solar | 200 | 2024-04-17 | In Progress (unknown study) | MISO | Current status |
| J3545 | Ionia | Solar | 200 | 2024-04-15 | In Progress (unknown study) | METC | Current status |
| J3633 | Sanilac | Solar | 200 | 2024-04-13 | In Progress (unknown study) | ITC | Current status |
| J3785 | Kenosha | Battery | 200 | 2024-04-18 | In Progress (unknown study) | AMERICAN TRANSMISSION COMPANY | Current status |
| J3803 | Monroe | Solar | 200 | 2024-04-18 | In Progress (unknown study) | ITC | Current status |
| J3837 | Van Buren | Solar | 200 | 2024-12-02 | METC | Current status | |
| J3852 | Tuscola | Solar | 200 | 2024-12-31 | ITC | Current status | |
| J3859 | Branch | Solar | 200 | 2024-12-17 | NORTHERN INDIANA PUBLIC SERVICE COMPANY | Current status | |
| J3928 | Bay | Wind | 200 | 2025-01-31 | ITC | Current status | |
| J4019 | Calhoun | Battery | 200 | 2025-05-07 | METC | Current status | |
| J4053 | Grand Traverse | Battery | 200 | 2025-07-28 | METC | Current status | |
| J4120 | Lenawee | Wind | 200 | 2025-09-16 | MISO | Current status | |
| J4123 | Branch | Battery | 200 | 2025-09-19 | METC | Current status | |
| J984 | Gratiot | Wind | 200 | 2018-03-12 | Construction | METC | Current status |
| Cass County Solar | Cass | Solar+Battery | 200 | 2020-03-31 | System Impact Study | AEP | Current status |
| J3480 | Allegan | Battery | 200 | 2024-04-17 | In Progress (unknown study) | METC | Current status |
| J3895 | Muskegon | Wind | 200 | 2025-02-07 | METC | Current status | |
| J1292 | Ionia | Wind | 198 | 2019-04-29 | IA Executed | METC | Current status |
| J4055 | Ionia | Wind | 198 | 2025-08-29 | ITC | Current status | |
| J3908 | St. Joseph | Solar | 196 | 2025-03-10 | METC | Current status | |
| J4044 | Lenawee | Solar | 190 | 2025-08-13 | METC | Current status | |
| J799 | Washtenaw | Solar | 189 | 2017-06-16 | Construction | ITC MIDWEST | Current status |
| J1944 | Sanilac | Solar | 185 | 2021-08-23 | Cluster Study | ITC | Current status |
| AH1-272 | Van Buren | Solar | 185 | 2025-02-06 | System Impact Study | AEP | Current status |
| J1658 | Hillsdale | Solar | 180 | 2025-05-19 | IA Executed | METC | Current status |
| J2578 | Tuscola | Solar | 180 | 2022-09-13 | Cluster Study | METC | Current status |
| J3782 | Saginaw | Battery | 180 | 2024-04-18 | In Progress (unknown study) | METC | Current status |
| AH2-373 | Berrien | Solar+Battery | 180 | 2022-03-10 | Feasibility Study | AEP | Current status |
| Au Gres Solar Project | Arenac | Solar | 180 | 2025-08-06 | In Progress (unknown study) | DTE Electric | Current status |
| J4043 | Eaton | Solar | 178 | 2025-08-13 | METC | Current status | |
| J3743 | Tuscola | Wind | 176 | 2024-04-12 | In Progress (unknown study) | ITC | Current status |
| J2876 | Arenac | Solar | 175 | 2022-09-14 | Cluster Study | METC | Current status |
| J3059 | Midland | Solar | 175 | 2022-09-15 | Cluster Study | MISO | Current status |
| J3909 | Gratiot | Wind | 175 | 2025-02-28 | METC | Current status | |
| J1224 | Washtenaw | Solar | 170 | 2019-04-27 | Construction | ITC MIDWEST | Current status |
| J1297 | Shiawassee | Solar | 170 | 2019-04-29 | Construction | METC | Current status |
| J2675 | Gladwin | Solar | 170 | 2022-09-14 | Cluster Study | METC | Current status |
| J2786 | Allegan | Solar+Battery | 170 | 2022-09-15 | Cluster Study | METC | Current status |
| J3967 | Huron | Wind | 170 | 2025-04-01 | ITC | Current status | |
| Replacing 160 MW of Solar with 80 MW of Solar and 90 MW of BESS; Bell Solar | Shiawassee | Solar+Battery | 170 | 2025-05-09 | METC | Current status | |
| J1917 | Livingston | Solar | 165 | 2021-08-19 | Cluster Study | ITC | Current status |
| J3962 | Bay | Wind+Battery | 165 | 2025-03-12 | METC | Current status | |
| J2997 | Livingston | Battery | 160 | 2022-09-14 | Cluster Study | ITC | Current status |
| J3827 | Mackinac | Solar | 160 | 2024-04-18 | AMERICAN TRANSMISSION COMPANY | Current status | |
| J4047 | Tuscola | Solar | 160 | 2025-08-13 | METC | Current status | |
| J2378 | Macomb | Battery | 152 | 2022-09-15 | Cluster Study | ITC | Current status |
| J1320 | Branch | Solar | 150 | 2019-04-29 | IA Executed | METC | Current status |
| J1553 | Clinton | Solar | 150 | 2021-12-03 | IA Executed | METC | Current status |
| J1914 | Presque Isle | Solar | 150 | 2023-10-05 | Cluster Study | METC | Current status |
| J2129 | Barry | Solar+Battery | 150 | 2021-08-26 | Cluster Study | WOLVERINE POWER SUPPLY COOPERATIVE | Current status |
| J2454 | Montcalm | Battery | 150 | 2022-09-14 | Cluster Study | ITC | Current status |
| J2589 | Jackson | Battery | 150 | 2022-09-15 | Cluster Study | METC | Current status |
| J2678 | Delta | Solar | 150 | 2022-09-14 | Cluster Study | AMERICAN TRANSMISSION COMPANY | Current status |
| J2875 | Presque Isle | Solar | 150 | 2022-09-14 | Cluster Study | WOLVERINE POWER SUPPLY COOPERATIVE | Current status |
| J3009 | Washtenaw | Battery | 150 | 2022-08-25 | Cluster Study | ITC | Current status |
| J3134 | Otsego | Solar | 150 | 2022-09-15 | Cluster Study | WOLVERINE POWER SUPPLY COOPERATIVE | Current status |
| J3419 | Huron | Solar | 150 | 2024-03-18 | In Progress (unknown study) | ITC | Current status |
| J3471 | Branch | Solar | 150 | 2024-04-18 | In Progress (unknown study) | METC | Current status |
| J3473 | Bay | Solar | 150 | 2024-04-18 | In Progress (unknown study) | MISO | Current status |
| J3636 | Tuscola | Battery | 150 | 2024-04-18 | In Progress (unknown study) | ITC | Current status |
| J3644 | Bay | Solar | 150 | 2024-04-18 | In Progress (unknown study) | MISO | Current status |
| J3645 | Huron | Wind | 150 | 2024-04-17 | In Progress (unknown study) | ITC | Current status |
| J3650 | Genesee | Battery | 150 | 2024-04-15 | In Progress (unknown study) | METC | Current status |
| J3651 | Lenawee | Battery | 150 | 2024-04-16 | In Progress (unknown study) | METC | Current status |
| J3654 | Washtenaw | Battery | 150 | 2024-04-05 | In Progress (unknown study) | ITC | Current status |
| J3682 | Muskegon | Solar | 150 | 2024-04-18 | In Progress (unknown study) | METC | Current status |
| J3722 | Hillsdale | Solar | 150 | 2024-03-27 | In Progress (unknown study) | METC | Current status |
| J3776 | Midland | Battery | 150 | 2024-04-18 | In Progress (unknown study) | METC | Current status |
| J3844 | St. Joseph | Solar | 150 | 2024-11-26 | METC | Current status | |
| J4061 | Lenawee | Solar | 150 | 2025-08-07 | METC | Current status | |
| J4122 | Shiawassee | Battery | 150 | 2025-09-19 | MISO | Current status | |
| J875 | Lenawee | Solar | 150 | 2017-06-16 | Construction | METC | Current status |
| Surplus; J1320 | Branch | Other+Battery | 150 | 2024-08-15 | METC | Current status | |
| Surplus; J875 | Lenawee | Other+Battery | 150 | 2024-10-07 | METC | Current status | |
| Surplus; J1062 | Washtenaw | Other+Battery | 150 | 2024-10-02 | ITC | Current status | |
| Gemstone Solar | Cass | Solar | 150 | 2020-01-31 | IA Executed | AEP | Current status |
| AH2-149 | Van Buren | Solar+Battery | 150 | 2022-02-28 | Feasibility Study | AEP | Current status |
| AI1-166 | Cass | Battery | 150 | 2022-09-09 | Feasibility Study | AEP | Current status |
| J1750 | Marquette | Solar | 150 | 2022-04-06 | Construction | AMERICAN TRANSMISSION COMPANY | Current status |
| Surplus; J806 | Calhoun | Other+Battery | 149 | METC | Current status | ||
| J4054 | Saginaw | Wind | 146 | 2025-09-18 | METC | Current status | |
| J3761 | Ogemaw | Solar | 146 | 2024-04-05 | In Progress (unknown study) | METC | Current status |
| J2619 | Montcalm | Solar+Battery | 140 | 2022-09-15 | Cluster Study | METC | Current status |
| J2669 | Mason | Solar | 140 | 2022-09-14 | Cluster Study | WOLVERINE POWER SUPPLY COOPERATIVE | Current status |
| J2812 | Hillsdale | Solar | 140 | 2022-09-14 | Cluster Study | METC | Current status |
| J2815 | Calhoun | Solar | 140 | 2022-08-30 | Cluster Study | METC | Current status |
| J3283 | Grand Traverse | Solar | 135 | 2024-04-15 | In Progress (unknown study) | METC | Current status |
| J1918 | Montcalm | Solar | 132 | 2021-08-24 | Cluster Study | METC | Current status |
| J3835 | Saginaw | Solar | 130 | 2024-07-18 | METC | Current status | |
| J1203 | Genesee | Solar | 125 | 2019-04-25 | Construction | METC | Current status |
| J1310 | Jackson | Solar | 125 | 2019-04-29 | Construction | METC | Current status |
| J1939 | Saginaw | Solar | 125 | 2023-10-18 | Cluster Study | METC | Current status |
| J2490 | Tuscola | Solar | 125 | 2022-09-14 | Cluster Study | ITC | Current status |
| J3792 | Gratiot | Solar | 125 | 2024-04-18 | In Progress (unknown study) | METC | Current status |
| J857 | Calhoun | Solar | 125 | 2017-06-16 | Construction | METC | Current status |
| J1389 | Saginaw | Solar | 120 | 2019-04-29 | IA Executed | METC | Current status |
| J2588 | Jackson | Battery | 120 | 2022-09-15 | Cluster Study | METC | Current status |
| J3124 | Saginaw | Solar | 120 | 2022-09-14 | Cluster Study | METC | Current status |
| J3133 | Saginaw | Battery | 120 | 2022-09-14 | Cluster Study | WOLVERINE POWER SUPPLY COOPERATIVE | Current status |
| J3451 | Alcona | Solar | 120 | 2024-04-05 | In Progress (unknown study) | METC | Current status |
| J3539 | Alcona | Solar | 117 | 2024-03-28 | In Progress (unknown study) | METC | Current status |
| J4126 | Lenawee | Wind | 112 | 2025-09-16 | METC | Current status | |
| J1929 | Cheboygan | Solar | 110 | 2021-08-24 | Cluster Study | METC | Current status |
| J3858 | Livingston | Solar | 110 | 2024-12-18 | MISO | Current status | |
| J4048 | Oceana | Solar | 110 | 2025-08-19 | METC | Current status | |
| J3857 | Iosco | Solar | 105 | 2024-12-26 | METC | Current status | |
| E0004 | Saginaw | Battery | 104 | 2025-08-07 | In Progress (unknown study) | Consumers Energy | Current status |
| Surplus; J199/J202 | Tuscola | Other+Battery | 100 | 2024-07-26 | ITC | Current status | |
| J1071 | Oceana | Solar | 100 | 2018-03-12 | Construction | METC | Current status |
| J1248 | Calhoun | Solar | 100 | 2019-04-29 | IA Executed | METC | Current status |
| J1251 | Marquette | Solar | 100 | 2019-04-29 | Construction | American Transmission Co. | Current status |
| J1331 | St. Clair | Solar | 100 | 2019-04-29 | IA Executed | ITC | Current status |
| J1375 | Muskegon | Solar | 100 | 2019-04-29 | Construction | METC | Current status |
| J1430 | Calhoun | Solar | 100 | 2019-04-29 | IA Executed | METC | Current status |
| J1472 | Jackson | Solar | 100 | 2019-04-29 | IA Executed | METC | Current status |
| J1587 | Muskegon | Solar | 100 | 2020-06-22 | IA Executed | ITC | Current status |
| J1635 | Branch | Battery | 100 | 2020-06-24 | IA Executed | METC | Current status |
| J1659 | Washtenaw | Battery | 100 | 2020-06-25 | Construction | ITC | Current status |
| J1844 | Washtenaw | Battery | 100 | 2020-12-31 | Cluster Study | ITC | Current status |
| J1845 | Calhoun | Battery | 100 | 2020-12-31 | Cluster Study | METC | Current status |
| J1916 | Branch | Solar | 100 | 2023-10-19 | Cluster Study | METC | Current status |
| J1932 | Gladwin | Solar | 100 | 2021-08-24 | Cluster Study | METC | Current status |
| J2026 | Gratiot | Battery | 100 | 2021-11-15 | Cluster Study | ITC | Current status |
| J2057 | Montcalm | Solar+Battery | 100 | 2021-08-25 | Cluster Study | METC | Current status |
| J2064 | Jackson | Battery | 100 | 2021-11-08 | Cluster Study | METC | Current status |
| J2069 | Montcalm | Solar+Battery | 100 | 2021-11-30 | Cluster Study | ITC | Current status |
| J2392 | Mason | Battery | 100 | 2022-09-15 | Cluster Study | METC | Current status |
| J2484 | Monroe | Solar | 100 | 2022-09-14 | Cluster Study | ITC | Current status |
| J2499 | Ottawa | Battery | 100 | 2022-09-12 | Cluster Study | METC | Current status |
| J2555 | Ingham | Battery | 100 | 2023-08-28 | Cluster Study | METC | Current status |
| J2618 | Macomb | Battery | 100 | 2022-09-15 | Cluster Study | ITC | Current status |
| J2679 | Livingston | Solar | 100 | 2022-09-14 | Cluster Study | ITC | Current status |
| J3007 | Mason | Battery | 100 | 2022-08-25 | Cluster Study | METC | Current status |
| J3268 | Gratiot | Battery | 100 | 2024-04-18 | In Progress (unknown study) | METC | Current status |
| J3421 | Huron | Battery | 100 | 2024-04-15 | In Progress (unknown study) | ITC | Current status |
| J3470 | Tuscola | Solar | 100 | 2024-04-16 | In Progress (unknown study) | MISO | Current status |
| J3485 | Huron | Battery | 100 | 2024-04-16 | In Progress (unknown study) | ITC | Current status |
| J3735 | Genesee | Battery | 100 | 2024-04-05 | In Progress (unknown study) | METC | Current status |
| J3828 | Lapeer | Solar | 100 | 2024-04-18 | MISO | Current status | |
| J3861 | Branch | Battery | 100 | 2024-12-13 | METC | Current status | |
| J3973 | Branch | Battery | 100 | 2025-03-05 | METC | Current status | |
| J4128 | Eaton | Battery | 100 | 2025-09-19 | ITC | Current status | |
| Surplus; Polaris Solar | Gratiot | Solar+Other | 100 | 2022-04-25 | IA Executed | METC | Current status |
| Surplus; J758 | Calhoun | Other+Battery | 100 | 2024-08-28 | METC | Current status | |
| Surplus; J1375 | Muskegon | Battery | 100 | 2025-01-13 | METC | Current status | |
| Southwest Michigan Energy Center | Van Buren | Solar | 100 | 2017-12-01 | IA Executed | AEP | Current status |
| AH2-418 | Berrien | Solar+Battery | 100 | 2022-03-10 | Feasibility Study | AEP | Current status |
| J3777 | Cheboygan | Solar | 92 | 2024-04-12 | In Progress (unknown study) | METC | Current status |
| J1399 | Ingham | Solar | 90 | 2019-04-29 | IA Executed | METC | Current status |
| Surplus; J717 | Isabella | Solar+Other | 90 | 2022-08-19 | METC | Current status | |
| Surplus; J728 | Isabella | Solar+Other | 90 | 2022-08-19 | METC | Current status | |
| Surplus; J1224/J1329 | Washtenaw | Other+Battery | 85 | 2024-10-07 | ITC | Current status | |
| J2874 | Bay | Solar | 85 | 2022-08-31 | Cluster Study | METC | Current status |
| Murch Solar | Van Buren | Solar | 85 | 2019-08-30 | IA Executed | AEP | Current status |
| J3653 | Washtenaw | Solar | 80 | 2024-04-05 | In Progress (unknown study) | ITC | Current status |
| J3924 | Branch | Battery | 80 | 2025-03-05 | METC | Current status | |
| J996 | Lenawee | Solar | 80 | 2018-03-12 | Construction | METC | Current status |
| Surplus; Pine River Solar | Gratiot | Solar+Other | 80 | 2022-04-25 | IA Executed | METC | Current status |
| J2316 | Dickinson | Solar | 78 | 2021-09-16 | In Progress (unknown study) | AMERICAN TRANSMISSION COMPANY | Current status |
| J230 | Mason | Other Storage | 70 | 2011-09-27 | IA Executed | MISO | Current status |
| J3970 | Huron | Wind | 70 | 2025-04-01 | ITC | Current status | |
| AI2-358 | Van Buren | Solar | 70 | 2023-03-08 | Feasibility Study | AEP | Current status |
| J2029 | Marquette | Solar | 63 | 2021-11-30 | In Progress (unknown study) | AMERICAN TRANSMISSION COMPANY | Current status |
| J1863 | Otsego | Battery | 60 | 2021-08-16 | Cluster Study | METC | Current status |
| J1880 | Ottawa | Battery | 60 | 2021-08-16 | Cluster Study | METC | Current status |
| Surplus; J928 | Delta | Solar+Other | 55 | 2022-04-11 | AMERICAN TRANSMISSION COMPANY | Current status | |
| J1172 | Genesee | Solar | 50 | 2018-03-12 | Construction | METC | Current status |
| J1210 | Iosco | Solar | 50 | 2019-04-27 | IA Executed | METC | Current status |
| J1984 | Ottawa | Battery | 50 | 2021-08-23 | Cluster Study | METC | Current status |
| J3066 | Osceola | Solar | 50 | 2022-09-15 | Cluster Study | WOLVERINE POWER SUPPLY COOPERATIVE | Current status |
| J4125 | Bay | Wind | 50 | 2025-09-16 | ITC | Current status | |
| Surplus; G905 | Midland | Other+Battery | 50 | 2024-08-01 | METC | Current status | |
| Surplus; J1587 | Muskegon | Battery | 50 | 2025-01-13 | METC | Current status | |
| Decatur Battery Storage | Van Buren | Battery | 50 | 2019-09-20 | IA Executed | AEP | Current status |
| J4085 | Dickinson | Solar | 42 | 2025-10-07 | AMERICAN TRANSMISSION COMPANY | Current status | |
| J3336 | Tuscola | Wind | 42 | 2024-04-05 | In Progress (unknown study) | ITC | Current status |
| AI2-144 | St. Joseph | Solar | 36 | 2023-02-28 | Feasibility Study | AEP | Current status |
| J466 | Huron | Battery | 30 | 2015-05-18 | IA Executed | MISO | Current status |
| J1262 | Wayne | Gas | 25 | 2019-04-29 | IA Executed | ITC MIDWEST | Current status |
| J1798 | Wayne | Gas | 25 | 2020-06-24 | IA Executed | ITC | Current status |
| J1982 | Gladwin | Battery | 25 | 2021-11-30 | Cluster Study | METC | Current status |
| Decatur Battery Storage | Van Buren | Battery | 25 | 2020-08-31 | IA Executed | AEP | Current status |
| AI2-169 | Cass | Solar | 24 | 2023-03-01 | Feasibility Study | AEP | Current status |
| AI2-340 | Van Buren | Solar | 23 | 2023-03-02 | Feasibility Study | AEP | Current status |
| J1814 | Dickinson | Solar | 23 | 2020-06-24 | IA Executed | AMERICAN TRANSMISSION COMPANY | Current status |
| J1329 | Washtenaw | Battery | 20 | 2019-04-29 | Construction | ITC MIDWEST | Current status |
| J3065 | Oceana | Solar | 20 | 2022-09-15 | Cluster Study | METC | Current status |
| AI2-215 | Cass | Solar | 18 | 2023-03-02 | Feasibility Study | AEP | Current status |
| J2283 | Hillsdale | Wind | 16 | 2021-11-19 | Cluster Study | METC | Current status |
| J2969 | Kalkaska | Gas | 13 | 2022-09-12 | Cluster Study | MICHIGAN PUBLIC POWER AGENCY | Current status |
| J3763 | Wayne | Other | 8 | 2024-04-18 | In Progress (unknown study) | ITC | Current status |
| J571 | Kalamazoo | Gas | 6 | 2016-05-06 | IA Executed | MISO | Current status |
| J4169 | Dickinson | Solar | 6 | 2025-10-06 | AMERICAN TRANSMISSION COMPANY | Current status | |
| J3756 | Marquette | Gas | 4 | 2024-04-17 | In Progress (unknown study) | AMERICAN TRANSMISSION COMPANY | Current status |
| J3800 | Baraga | Gas | 2 | 2024-04-17 | In Progress (unknown study) | AMERICAN TRANSMISSION COMPANY | Current status |
| J646 | Macomb | Other | 2 | 2016-06-16 | Construction | ITC MIDWEST | Current status |
| L006 | Otsego | Other | -5 | 2004-09-27 | In Progress (unknown study) | MISO | Current status |
| L010 | Other | -8 | 2005-04-01 | In Progress (unknown study) | MISO | Current status | |
| L003 | Lenawee | Other | -10 | 2004-05-24 | In Progress (unknown study) | MISO | Current status |
Lawrence Berkeley National Laboratory and GridTracker · Queued Up: Interconnection Queue Data File (Lawrence Berkeley National Laboratory) · data for 2025 · as of May 7, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0 May be out of date. The next release was due by May 7, 2027. Last checked for an update: Oct 31, 2026.