gridprims

Interconnection queue

Interconnection queue in Michigan

Data: Lawrence Berkeley National Laboratory and GridTracker, Queued Up, as of Dec 31, 2025.

This is an annual snapshot. A request's status may have changed since. Current status at Interconnection.fyi.

LBNL licenses the file CC BY 4.0, so project rows are shown and the file can be downloaded from our data library.

Statewide

Active capacity
58,466 MW
Active requests
304
Median years in queue (active)
3.3
Withdrawn, of requests entered by 2020
66%
Active capacity by type
TypeActive capacity (MW)Projects
Solar22,231141
Wind6,04929
Storage14,73185
Gas9,74214
Hybrid4,99229
Other7216

By county

Queue requests by county in Michigan, as of Dec 31, 2025
CountyActive capacity (MW)ProjectsSolarWindStorageGasHybridOtherMedian years in queue (active)Withdrawn, of requests entered by 2020
Monroe4,988105001,4902,9980.9
Huron3,855175501,4751,8301.742% of 24
Washtenaw3,053138845201,4142353.4
Branch2,975128005801,4451501.2
Van Buren2,493148837251507353.3
Livingston2,43775751601,4522503.3
Sanilac2,361111,5985132503.3
Calhoun2,327121,2793007484.4
Ottawa2,24872002101,0897493.3
Lenawee2,08513970575400150-101.7
Saginaw2,045129951469041.8
Genesee1,89361754501,2681.7
Mason1,55588856703.3
Tuscola1,533107652174501001.7
Montcalm1,34783323003753403.7
Wayne1,22889505022083.8
Shiawassee1,17063704801501701.1
Cass1,08167311502003.1
Bay1,05473855041651.7
Muskegon95076002001501.7
Eaton92841787500.5
St. Clair92055004203.3
Gratiot88071253752001803.7
Allegan82046501702.5
Ionia79644003964.2
St. Joseph68243823002.0
Isabella64444641802.1
Kalamazoo626422040063.7
Lapeer60033003001.7
Jackson59552253704.1
Midland5754375150502.5
Presque Isle55233002523.3
Hillsdale4864470162.5
Oceana47042302403.3
Alcona45234521.8
Clinton45021503002.2
Ogemaw43624361.7
Ingham41533151002.3
Otsego405435060-54.2
Arenac35523551.8
Grand Traverse33521352001.1
Marquette316431243.9
Wexford30013001.7
Gladwin2953270254.1
Berrien28022803.8
Macomb254325223.3
Osceola25022502.5
Clare22512253.3
Newaygo22012204.4
Delta2052150553.5
Cheboygan20222023.0
Kenosha20012001.7
Mackinac16011601.7
Iosco15521553.8
Barry15011504.3
Dickinson14841482.3
Kalkaska131133.3
Baraga2121.7
Kent00
Schoolcraft00
Manistee00
Missaukee00
Ontonagon00
Houghton00
Antrim00
Oakland00
Chippewa00
Mecosta00
Alger00
Iron00
Leelanau00
Roscommon00
Crawford00
Oscoda00
County not given-81-820.8

Capacity is each request's first-listed capacity, so a hybrid's battery is not added on top. Most requests in a queue never get built.

Active requests

Status is as of Dec 31, 2025. Current status at Interconnection.fyi.

Active interconnection requests in Michigan
ProjectCountyTypeMWEntered the queueStudy phaseUtility or operatorLive status
J4024MonroeGas1,4992025-05-05ITCCurrent status
J4025MonroeGas1,4992025-05-05ITCCurrent status
J3799LivingstonGas1,4522024-04-18MISOCurrent status
J3922BranchGas1,4452025-03-04METCCurrent status
J3923WashtenawGas1,4142025-02-28ITCCurrent status
J3935GeneseeGas1,2682025-02-28METCCurrent status
Replacing 749 MW of coal generation with BESS; Campbell 3OttawaOther+Battery7492023-11-09METCCurrent status
J4040Van BurenNuclear7352025-07-25METCCurrent status
J4159OttawaGas6642025-08-13METCCurrent status
J4102CassSolar5392025-10-10METCCurrent status
J2590HuronBattery5002022-09-15Cluster StudyITCCurrent status
J1586CalhounSolar+Battery4992020-06-25IA ExecutedITCCurrent status
J3966HuronWind4802025-04-01ITCCurrent status
Monroe ERASMonroeBattery4322025-08-06In Progress (unknown study)DTE ElectricCurrent status
J4160OttawaGas4252025-08-13METCCurrent status
J3992EatonBattery4002025-04-17METCCurrent status
J4093MasonBattery4002025-10-06METCCurrent status
J3994MonroeBattery3602025-04-17METCCurrent status
J3872WayneBattery3502025-01-27ITCCurrent status
J4203HuronWind3502025-06-06ITCCurrent status
J2098CalhounSolar3092021-08-22Cluster StudyMETCCurrent status
J3723WexfordSolar3002024-04-15In Progress (unknown study)METCCurrent status
J3843SaginawSolar3002024-11-21METCCurrent status
J3866LapeerWind3002024-12-06ITCCurrent status
J3887MontcalmWind3002025-01-10METCCurrent status
J4016TuscolaBattery3002025-05-20ITCCurrent status
J4094HuronBattery3002025-10-06ITCCurrent status
J4095HuronBattery3002025-10-06ITCCurrent status
J4195ClintonWind3002025-10-09MISOCurrent status
Three Lakes SolarSt. JosephSolar+Battery3002019-09-25System Impact StudyAEPCurrent status
J3282MasonSolar2972024-04-15In Progress (unknown study)METCCurrent status
J1557SanilacWind2932020-06-23IA ExecutedITCCurrent status
J3274OgemawSolar2902024-04-15In Progress (unknown study)METCCurrent status
J3313LenaweeWind2632024-04-16In Progress (unknown study)METCCurrent status
J3050CalhounSolar2552025-07-29Cluster StudyMETCCurrent status
J3971HuronWind2552025-04-01ITCCurrent status
J3361BayWind2542024-04-12In Progress (unknown study)MISOCurrent status
J2260Presque IsleWind2522021-10-07Cluster StudyMETCCurrent status
J1614MuskegonSolar2502020-06-11IA ExecutedMETCCurrent status
J2100Van BurenBattery2502021-08-13Cluster StudyMETCCurrent status
J2139LivingstonSolar+Battery2502021-09-02Cluster StudyITCCurrent status
J2628HuronBattery2502022-09-15Cluster StudyITCCurrent status
J2921CalhounSolar2502022-09-15Cluster StudyITCCurrent status
J3438SaginawBattery2502024-03-26In Progress (unknown study)METCCurrent status
J3656SaginawBattery2502024-03-26In Progress (unknown study)ITCCurrent status
J3836EatonBattery2502024-10-24METCCurrent status
J3845MonroeBattery2502024-11-27ITCCurrent status
J3865ShiawasseeWind2502024-12-08METCCurrent status
J3977SanilacBattery2502025-03-31ITCCurrent status
J4026LenaweeBattery2502025-05-21METCCurrent status
J4058HuronBattery2502025-08-22ITCCurrent status
J4066IsabellaSolar2502025-09-24ITCCurrent status
J4167AlleganBattery2502025-09-17METCCurrent status
FERMI Storage ProjectMonroeBattery2482025-08-06In Progress (unknown study)DTE ElectricCurrent status
J3945WashtenawSolar2452025-04-07ITCCurrent status
J2567OceanaBattery2402022-09-15Cluster StudyMETCCurrent status
J3864ShiawasseeWind2302024-12-09METCCurrent status
J2668MasonSolar2252022-09-14Cluster StudyWOLVERINE POWER SUPPLY COOPERATIVECurrent status
J2673ClareSolar2252022-09-14Cluster StudyMETCCurrent status
J3696MontcalmBattery2252024-04-15In Progress (unknown study)METCCurrent status
J3838InghamSolar2252024-04-18METCCurrent status
J2670MasonSolar2232022-09-14Cluster StudyMETCCurrent status
J2001NewaygoSolar2202021-08-16Cluster StudyMETCCurrent status
J2444Van BurenSolar2202022-09-14Cluster StudyMETCCurrent status
J2814KalamazooSolar2202022-09-07Cluster StudyMETCCurrent status
J3496SanilacWind2202024-04-12In Progress (unknown study)ITCCurrent status
J3646St. ClairBattery2202024-04-17In Progress (unknown study)MISOCurrent status
Replacing 220 MW of coal generation with BESS; Trenton Channel 9WayneOther+Battery2202023-10-11METCCurrent status
J2611AlconaSolar2152022-09-14Cluster StudyMETCCurrent status
J3940IsabellaSolar2142025-02-14METCCurrent status
Deckerville Solar Park ProjectSanilacSolar2132025-08-06In Progress (unknown study)DTE ElectricCurrent status
J1062WashtenawSolar2002018-03-12IA ExecutedITC MIDWESTCurrent status
J1196SanilacSolar2002019-04-25IA ExecutedITC MIDWESTCurrent status
J1226LenaweeSolar2002019-04-27ConstructionMETCCurrent status
J1255IoniaSolar2002019-04-29ConstructionMETCCurrent status
J1379MontcalmSolar2002019-04-29IA ExecutedMETCCurrent status
J1525HuronSolar2002020-06-12IA ExecutedITCCurrent status
J1550BranchSolar2002020-06-22IA ExecutedMETCCurrent status
J1571LenaweeSolar2002021-12-03IA ExecutedMETCCurrent status
J1603OtsegoSolar2002021-12-03IA ExecutedMETCCurrent status
J1663OttawaSolar2002021-12-03ConstructionMETCCurrent status
J1664St. ClairSolar2002020-06-24IA ExecutedITCCurrent status
J1894KalamazooBattery2002021-10-29Cluster StudyMETCCurrent status
J1900WayneBattery2002021-08-13Cluster StudyITCCurrent status
J1902WayneBattery2002021-08-13Cluster StudyITCCurrent status
J2061SaginawSolar2002021-08-12Cluster StudyMETCCurrent status
J2374SanilacSolar2002022-09-15Cluster StudyITCCurrent status
J2475MonroeBattery2002022-09-15Cluster StudyITCCurrent status
J2485LivingstonSolar2002022-09-14Cluster StudyITCCurrent status
J2486MonroeSolar2002022-09-14Cluster StudyITCCurrent status
J2667SanilacSolar2002022-09-14Cluster StudyITCCurrent status
J2672ShiawasseeSolar2002022-09-14Cluster StudyMETCCurrent status
J2676HuronSolar2002022-09-14Cluster StudyITCCurrent status
J2677St. ClairSolar2002022-09-14Cluster StudyITCCurrent status
J2684St. ClairBattery2002022-09-08Cluster StudyMISOCurrent status
J2799Van BurenBattery2002025-10-25Cluster StudyMETCCurrent status
J2822Van BurenBattery2002022-09-08Cluster StudyMETCCurrent status
J2877MidlandSolar2002022-09-14Cluster StudyMETCCurrent status
J2878SanilacSolar2002022-09-14Cluster StudyITCCurrent status
J2889AlleganBattery2002022-09-14Cluster StudyMETCCurrent status
J2906KalamazooBattery2002022-09-15Cluster StudyMETCCurrent status
J2991WayneBattery2002022-09-14Cluster StudyITCCurrent status
J3251GeneseeBattery2002024-04-15In Progress (unknown study)METCCurrent status
J3286SanilacSolar2002024-04-15In Progress (unknown study)ITCCurrent status
J3287OsceolaSolar2002024-04-15In Progress (unknown study)WOLVERINE POWER SUPPLY COOPERATIVECurrent status
J3472LapeerSolar2002024-04-17In Progress (unknown study)MISOCurrent status
J3545IoniaSolar2002024-04-15In Progress (unknown study)METCCurrent status
J3633SanilacSolar2002024-04-13In Progress (unknown study)ITCCurrent status
J3785KenoshaBattery2002024-04-18In Progress (unknown study)AMERICAN TRANSMISSION COMPANYCurrent status
J3803MonroeSolar2002024-04-18In Progress (unknown study)ITCCurrent status
J3837Van BurenSolar2002024-12-02METCCurrent status
J3852TuscolaSolar2002024-12-31ITCCurrent status
J3859BranchSolar2002024-12-17NORTHERN INDIANA PUBLIC SERVICE COMPANYCurrent status
J3928BayWind2002025-01-31ITCCurrent status
J4019CalhounBattery2002025-05-07METCCurrent status
J4053Grand TraverseBattery2002025-07-28METCCurrent status
J4120LenaweeWind2002025-09-16MISOCurrent status
J4123BranchBattery2002025-09-19METCCurrent status
J984GratiotWind2002018-03-12ConstructionMETCCurrent status
Cass County SolarCassSolar+Battery2002020-03-31System Impact StudyAEPCurrent status
J3480AlleganBattery2002024-04-17In Progress (unknown study)METCCurrent status
J3895MuskegonWind2002025-02-07METCCurrent status
J1292IoniaWind1982019-04-29IA ExecutedMETCCurrent status
J4055IoniaWind1982025-08-29ITCCurrent status
J3908St. JosephSolar1962025-03-10METCCurrent status
J4044LenaweeSolar1902025-08-13METCCurrent status
J799WashtenawSolar1892017-06-16ConstructionITC MIDWESTCurrent status
J1944SanilacSolar1852021-08-23Cluster StudyITCCurrent status
AH1-272Van BurenSolar1852025-02-06System Impact StudyAEPCurrent status
J1658HillsdaleSolar1802025-05-19IA ExecutedMETCCurrent status
J2578TuscolaSolar1802022-09-13Cluster StudyMETCCurrent status
J3782SaginawBattery1802024-04-18In Progress (unknown study)METCCurrent status
AH2-373BerrienSolar+Battery1802022-03-10Feasibility StudyAEPCurrent status
Au Gres Solar ProjectArenacSolar1802025-08-06In Progress (unknown study)DTE ElectricCurrent status
J4043EatonSolar1782025-08-13METCCurrent status
J3743TuscolaWind1762024-04-12In Progress (unknown study)ITCCurrent status
J2876ArenacSolar1752022-09-14Cluster StudyMETCCurrent status
J3059MidlandSolar1752022-09-15Cluster StudyMISOCurrent status
J3909GratiotWind1752025-02-28METCCurrent status
J1224WashtenawSolar1702019-04-27ConstructionITC MIDWESTCurrent status
J1297ShiawasseeSolar1702019-04-29ConstructionMETCCurrent status
J2675GladwinSolar1702022-09-14Cluster StudyMETCCurrent status
J2786AlleganSolar+Battery1702022-09-15Cluster StudyMETCCurrent status
J3967HuronWind1702025-04-01ITCCurrent status
Replacing 160 MW of Solar with 80 MW of Solar and 90 MW of BESS; Bell SolarShiawasseeSolar+Battery1702025-05-09METCCurrent status
J1917LivingstonSolar1652021-08-19Cluster StudyITCCurrent status
J3962BayWind+Battery1652025-03-12METCCurrent status
J2997LivingstonBattery1602022-09-14Cluster StudyITCCurrent status
J3827MackinacSolar1602024-04-18AMERICAN TRANSMISSION COMPANYCurrent status
J4047TuscolaSolar1602025-08-13METCCurrent status
J2378MacombBattery1522022-09-15Cluster StudyITCCurrent status
J1320BranchSolar1502019-04-29IA ExecutedMETCCurrent status
J1553ClintonSolar1502021-12-03IA ExecutedMETCCurrent status
J1914Presque IsleSolar1502023-10-05Cluster StudyMETCCurrent status
J2129BarrySolar+Battery1502021-08-26Cluster StudyWOLVERINE POWER SUPPLY COOPERATIVECurrent status
J2454MontcalmBattery1502022-09-14Cluster StudyITCCurrent status
J2589JacksonBattery1502022-09-15Cluster StudyMETCCurrent status
J2678DeltaSolar1502022-09-14Cluster StudyAMERICAN TRANSMISSION COMPANYCurrent status
J2875Presque IsleSolar1502022-09-14Cluster StudyWOLVERINE POWER SUPPLY COOPERATIVECurrent status
J3009WashtenawBattery1502022-08-25Cluster StudyITCCurrent status
J3134OtsegoSolar1502022-09-15Cluster StudyWOLVERINE POWER SUPPLY COOPERATIVECurrent status
J3419HuronSolar1502024-03-18In Progress (unknown study)ITCCurrent status
J3471BranchSolar1502024-04-18In Progress (unknown study)METCCurrent status
J3473BaySolar1502024-04-18In Progress (unknown study)MISOCurrent status
J3636TuscolaBattery1502024-04-18In Progress (unknown study)ITCCurrent status
J3644BaySolar1502024-04-18In Progress (unknown study)MISOCurrent status
J3645HuronWind1502024-04-17In Progress (unknown study)ITCCurrent status
J3650GeneseeBattery1502024-04-15In Progress (unknown study)METCCurrent status
J3651LenaweeBattery1502024-04-16In Progress (unknown study)METCCurrent status
J3654WashtenawBattery1502024-04-05In Progress (unknown study)ITCCurrent status
J3682MuskegonSolar1502024-04-18In Progress (unknown study)METCCurrent status
J3722HillsdaleSolar1502024-03-27In Progress (unknown study)METCCurrent status
J3776MidlandBattery1502024-04-18In Progress (unknown study)METCCurrent status
J3844St. JosephSolar1502024-11-26METCCurrent status
J4061LenaweeSolar1502025-08-07METCCurrent status
J4122ShiawasseeBattery1502025-09-19MISOCurrent status
J875LenaweeSolar1502017-06-16ConstructionMETCCurrent status
Surplus; J1320BranchOther+Battery1502024-08-15METCCurrent status
Surplus; J875LenaweeOther+Battery1502024-10-07METCCurrent status
Surplus; J1062WashtenawOther+Battery1502024-10-02ITCCurrent status
Gemstone SolarCassSolar1502020-01-31IA ExecutedAEPCurrent status
AH2-149Van BurenSolar+Battery1502022-02-28Feasibility StudyAEPCurrent status
AI1-166CassBattery1502022-09-09Feasibility StudyAEPCurrent status
J1750MarquetteSolar1502022-04-06ConstructionAMERICAN TRANSMISSION COMPANYCurrent status
Surplus; J806CalhounOther+Battery149METCCurrent status
J4054SaginawWind1462025-09-18METCCurrent status
J3761OgemawSolar1462024-04-05In Progress (unknown study)METCCurrent status
J2619MontcalmSolar+Battery1402022-09-15Cluster StudyMETCCurrent status
J2669MasonSolar1402022-09-14Cluster StudyWOLVERINE POWER SUPPLY COOPERATIVECurrent status
J2812HillsdaleSolar1402022-09-14Cluster StudyMETCCurrent status
J2815CalhounSolar1402022-08-30Cluster StudyMETCCurrent status
J3283Grand TraverseSolar1352024-04-15In Progress (unknown study)METCCurrent status
J1918MontcalmSolar1322021-08-24Cluster StudyMETCCurrent status
J3835SaginawSolar1302024-07-18METCCurrent status
J1203GeneseeSolar1252019-04-25ConstructionMETCCurrent status
J1310JacksonSolar1252019-04-29ConstructionMETCCurrent status
J1939SaginawSolar1252023-10-18Cluster StudyMETCCurrent status
J2490TuscolaSolar1252022-09-14Cluster StudyITCCurrent status
J3792GratiotSolar1252024-04-18In Progress (unknown study)METCCurrent status
J857CalhounSolar1252017-06-16ConstructionMETCCurrent status
J1389SaginawSolar1202019-04-29IA ExecutedMETCCurrent status
J2588JacksonBattery1202022-09-15Cluster StudyMETCCurrent status
J3124SaginawSolar1202022-09-14Cluster StudyMETCCurrent status
J3133SaginawBattery1202022-09-14Cluster StudyWOLVERINE POWER SUPPLY COOPERATIVECurrent status
J3451AlconaSolar1202024-04-05In Progress (unknown study)METCCurrent status
J3539AlconaSolar1172024-03-28In Progress (unknown study)METCCurrent status
J4126LenaweeWind1122025-09-16METCCurrent status
J1929CheboyganSolar1102021-08-24Cluster StudyMETCCurrent status
J3858LivingstonSolar1102024-12-18MISOCurrent status
J4048OceanaSolar1102025-08-19METCCurrent status
J3857IoscoSolar1052024-12-26METCCurrent status
E0004SaginawBattery1042025-08-07In Progress (unknown study)Consumers EnergyCurrent status
Surplus; J199/J202TuscolaOther+Battery1002024-07-26ITCCurrent status
J1071OceanaSolar1002018-03-12ConstructionMETCCurrent status
J1248CalhounSolar1002019-04-29IA ExecutedMETCCurrent status
J1251MarquetteSolar1002019-04-29ConstructionAmerican Transmission Co.Current status
J1331St. ClairSolar1002019-04-29IA ExecutedITCCurrent status
J1375MuskegonSolar1002019-04-29ConstructionMETCCurrent status
J1430CalhounSolar1002019-04-29IA ExecutedMETCCurrent status
J1472JacksonSolar1002019-04-29IA ExecutedMETCCurrent status
J1587MuskegonSolar1002020-06-22IA ExecutedITCCurrent status
J1635BranchBattery1002020-06-24IA ExecutedMETCCurrent status
J1659WashtenawBattery1002020-06-25ConstructionITCCurrent status
J1844WashtenawBattery1002020-12-31Cluster StudyITCCurrent status
J1845CalhounBattery1002020-12-31Cluster StudyMETCCurrent status
J1916BranchSolar1002023-10-19Cluster StudyMETCCurrent status
J1932GladwinSolar1002021-08-24Cluster StudyMETCCurrent status
J2026GratiotBattery1002021-11-15Cluster StudyITCCurrent status
J2057MontcalmSolar+Battery1002021-08-25Cluster StudyMETCCurrent status
J2064JacksonBattery1002021-11-08Cluster StudyMETCCurrent status
J2069MontcalmSolar+Battery1002021-11-30Cluster StudyITCCurrent status
J2392MasonBattery1002022-09-15Cluster StudyMETCCurrent status
J2484MonroeSolar1002022-09-14Cluster StudyITCCurrent status
J2499OttawaBattery1002022-09-12Cluster StudyMETCCurrent status
J2555InghamBattery1002023-08-28Cluster StudyMETCCurrent status
J2618MacombBattery1002022-09-15Cluster StudyITCCurrent status
J2679LivingstonSolar1002022-09-14Cluster StudyITCCurrent status
J3007MasonBattery1002022-08-25Cluster StudyMETCCurrent status
J3268GratiotBattery1002024-04-18In Progress (unknown study)METCCurrent status
J3421HuronBattery1002024-04-15In Progress (unknown study)ITCCurrent status
J3470TuscolaSolar1002024-04-16In Progress (unknown study)MISOCurrent status
J3485HuronBattery1002024-04-16In Progress (unknown study)ITCCurrent status
J3735GeneseeBattery1002024-04-05In Progress (unknown study)METCCurrent status
J3828LapeerSolar1002024-04-18MISOCurrent status
J3861BranchBattery1002024-12-13METCCurrent status
J3973BranchBattery1002025-03-05METCCurrent status
J4128EatonBattery1002025-09-19ITCCurrent status
Surplus; Polaris SolarGratiotSolar+Other1002022-04-25IA ExecutedMETCCurrent status
Surplus; J758CalhounOther+Battery1002024-08-28METCCurrent status
Surplus; J1375MuskegonBattery1002025-01-13METCCurrent status
Southwest Michigan Energy CenterVan BurenSolar1002017-12-01IA ExecutedAEPCurrent status
AH2-418BerrienSolar+Battery1002022-03-10Feasibility StudyAEPCurrent status
J3777CheboyganSolar922024-04-12In Progress (unknown study)METCCurrent status
J1399InghamSolar902019-04-29IA ExecutedMETCCurrent status
Surplus; J717IsabellaSolar+Other902022-08-19METCCurrent status
Surplus; J728IsabellaSolar+Other902022-08-19METCCurrent status
Surplus; J1224/J1329WashtenawOther+Battery852024-10-07ITCCurrent status
J2874BaySolar852022-08-31Cluster StudyMETCCurrent status
Murch SolarVan BurenSolar852019-08-30IA ExecutedAEPCurrent status
J3653WashtenawSolar802024-04-05In Progress (unknown study)ITCCurrent status
J3924BranchBattery802025-03-05METCCurrent status
J996LenaweeSolar802018-03-12ConstructionMETCCurrent status
Surplus; Pine River SolarGratiotSolar+Other802022-04-25IA ExecutedMETCCurrent status
J2316DickinsonSolar782021-09-16In Progress (unknown study)AMERICAN TRANSMISSION COMPANYCurrent status
J230MasonOther Storage702011-09-27IA ExecutedMISOCurrent status
J3970HuronWind702025-04-01ITCCurrent status
AI2-358Van BurenSolar702023-03-08Feasibility StudyAEPCurrent status
J2029MarquetteSolar632021-11-30In Progress (unknown study)AMERICAN TRANSMISSION COMPANYCurrent status
J1863OtsegoBattery602021-08-16Cluster StudyMETCCurrent status
J1880OttawaBattery602021-08-16Cluster StudyMETCCurrent status
Surplus; J928DeltaSolar+Other552022-04-11AMERICAN TRANSMISSION COMPANYCurrent status
J1172GeneseeSolar502018-03-12ConstructionMETCCurrent status
J1210IoscoSolar502019-04-27IA ExecutedMETCCurrent status
J1984OttawaBattery502021-08-23Cluster StudyMETCCurrent status
J3066OsceolaSolar502022-09-15Cluster StudyWOLVERINE POWER SUPPLY COOPERATIVECurrent status
J4125BayWind502025-09-16ITCCurrent status
Surplus; G905MidlandOther+Battery502024-08-01METCCurrent status
Surplus; J1587MuskegonBattery502025-01-13METCCurrent status
Decatur Battery StorageVan BurenBattery502019-09-20IA ExecutedAEPCurrent status
J4085DickinsonSolar422025-10-07AMERICAN TRANSMISSION COMPANYCurrent status
J3336TuscolaWind422024-04-05In Progress (unknown study)ITCCurrent status
AI2-144St. JosephSolar362023-02-28Feasibility StudyAEPCurrent status
J466HuronBattery302015-05-18IA ExecutedMISOCurrent status
J1262WayneGas252019-04-29IA ExecutedITC MIDWESTCurrent status
J1798WayneGas252020-06-24IA ExecutedITCCurrent status
J1982GladwinBattery252021-11-30Cluster StudyMETCCurrent status
Decatur Battery StorageVan BurenBattery252020-08-31IA ExecutedAEPCurrent status
AI2-169CassSolar242023-03-01Feasibility StudyAEPCurrent status
AI2-340Van BurenSolar232023-03-02Feasibility StudyAEPCurrent status
J1814DickinsonSolar232020-06-24IA ExecutedAMERICAN TRANSMISSION COMPANYCurrent status
J1329WashtenawBattery202019-04-29ConstructionITC MIDWESTCurrent status
J3065OceanaSolar202022-09-15Cluster StudyMETCCurrent status
AI2-215CassSolar182023-03-02Feasibility StudyAEPCurrent status
J2283HillsdaleWind162021-11-19Cluster StudyMETCCurrent status
J2969KalkaskaGas132022-09-12Cluster StudyMICHIGAN PUBLIC POWER AGENCYCurrent status
J3763WayneOther82024-04-18In Progress (unknown study)ITCCurrent status
J571KalamazooGas62016-05-06IA ExecutedMISOCurrent status
J4169DickinsonSolar62025-10-06AMERICAN TRANSMISSION COMPANYCurrent status
J3756MarquetteGas42024-04-17In Progress (unknown study)AMERICAN TRANSMISSION COMPANYCurrent status
J3800BaragaGas22024-04-17In Progress (unknown study)AMERICAN TRANSMISSION COMPANYCurrent status
J646MacombOther22016-06-16ConstructionITC MIDWESTCurrent status
L006OtsegoOther-52004-09-27In Progress (unknown study)MISOCurrent status
L010Other-82005-04-01In Progress (unknown study)MISOCurrent status
L003LenaweeOther-102004-05-24In Progress (unknown study)MISOCurrent status

Lawrence Berkeley National Laboratory and GridTracker · Queued Up: Interconnection Queue Data File (Lawrence Berkeley National Laboratory) · data for 2025 · as of May 7, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0