Interconnection queue in Illinois
Data: Lawrence Berkeley National Laboratory and GridTracker, Queued Up, as of Dec 31, 2025.
This is an annual snapshot. A request's status may have changed since. Current status at Interconnection.fyi.
LBNL licenses the file CC BY 4.0, so project rows are shown and the file can be downloaded from our data library.
Statewide
- Active capacity
- 74,081 MW
- Active requests
- 418
- Median years in queue (active)
- 3.3
- Withdrawn, of requests entered by 2020
- 65%
| Type | Active capacity (MW) | Projects |
|---|---|---|
| Solar | 28,754 | 175 |
| Wind | 15,186 | 74 |
| Storage | 16,718 | 102 |
| Gas | 1,771 | 6 |
| Hybrid | 10,689 | 56 |
| Other | 963 | 5 |
By county
| County | Active capacity (MW) | Projects | Solar | Wind | Storage | Gas | Hybrid | Other | Median years in queue (active) | Withdrawn, of requests entered by 2020 |
|---|---|---|---|---|---|---|---|---|---|---|
| Mclean | 3,260 | 18 | 474 | 1,401 | 850 | 535 | 2.9 | 71% of 31 | ||
| Christian | 2,589 | 12 | 1,359 | 450 | 280 | 500 | 5.7 | |||
| Lee | 2,531 | 16 | 1,880 | 203 | 410 | 38 | 3.8 | 70% of 63 | ||
| Peoria | 2,474 | 8 | 1,552 | 600 | 322 | 1.6 | ||||
| Sangamon | 2,428 | 10 | 598 | 450 | 1,165 | 215 | 2.5 | |||
| Tazewell | 2,143 | 12 | 650 | 575 | 918 | 1.7 | ||||
| Kankakee | 1,921 | 11 | 871 | 850 | 200 | 5.9 | 60% of 25 | |||
| Perry | 1,850 | 9 | 907 | 443 | 500 | 3.3 | ||||
| Iroquois | 1,778 | 8 | 589 | 789 | 400 | 2.5 | ||||
| Fulton | 1,721 | 6 | 1,151 | 200 | 370 | 3.4 | ||||
| Livingston | 1,712 | 7 | 300 | 255 | 750 | 407 | 3.8 | 70% of 23 | ||
| Macon | 1,600 | 8 | 360 | 200 | 500 | 340 | 200 | 3.3 | ||
| Clark | 1,599 | 9 | 840 | 350 | 409 | 4.4 | ||||
| Mchenry | 1,566 | 9 | 466 | 1,050 | 50 | 3.5 | ||||
| Clay | 1,500 | 8 | 1,000 | 500 | 2.5 | |||||
| Rock Island | 1,348 | 7 | 260 | 300 | 660 | 128 | 1.7 | |||
| Whiteside | 1,299 | 6 | 655 | 491 | 153 | 3.8 | ||||
| Shelby | 1,275 | 7 | 165 | 850 | 260 | 1.7 | ||||
| Champaign | 1,265 | 8 | 341 | 288 | 500 | 135 | 2.5 | |||
| Will | 1,139 | 9 | 812 | 125 | 72 | 130 | 2.6 | 63% of 41 | ||
| Saline | 1,135 | 8 | 810 | 325 | 5.5 | |||||
| Stark | 1,130 | 4 | 630 | 200 | 300 | 3.6 | ||||
| Fayette | 1,070 | 9 | 803 | 67 | 200 | 1.8 | ||||
| Washington | 1,050 | 4 | 400 | 150 | 500 | 5.0 | ||||
| Franklin | 1,050 | 3 | 500 | 550 | 3.3 | |||||
| Mason | 1,042 | 5 | 320 | 400 | 322 | 3.3 | ||||
| Scott | 1,002 | 4 | 1,002 | 0.7 | ||||||
| Coles | 986 | 5 | 386 | 200 | 100 | 300 | 3.3 | |||
| Grundy | 983 | 7 | 140 | 380 | 103 | 360 | 3.8 | 48% of 25 | ||
| Edgar | 916 | 5 | 341 | 400 | 175 | 0.7 | ||||
| Adams | 910 | 7 | 410 | 350 | 150 | 3.3 | ||||
| Cumberland | 910 | 4 | 400 | 510 | 2.4 | |||||
| Kendall | 903 | 6 | 559 | 172 | 172 | 3.8 | ||||
| Knox | 900 | 4 | 300 | 500 | 100 | 2.5 | ||||
| Ford | 885 | 4 | 500 | 250 | 135 | 2.2 | ||||
| Montgomery | 875 | 5 | 631 | 200 | 44 | 3.3 | ||||
| Jasper | 874 | 6 | 597 | 277 | 3.3 | |||||
| Dekalb | 872 | 9 | 772 | 100 | 3.3 | 90% of 20 | ||||
| Woodford | 855 | 5 | 55 | 800 | 6.8 | |||||
| Johnson | 800 | 5 | 600 | 200 | 3.3 | |||||
| Pulaski | 775 | 4 | 400 | 375 | 1.7 | |||||
| Lasalle | 774 | 7 | 300 | 150 | 150 | 174 | 5.8 | 52% of 21 | ||
| Vermilion | 743 | 5 | 643 | 100 | 1.7 | |||||
| Wabash | 735 | 2 | 235 | 500 | 2.2 | |||||
| Lake | 732 | 3 | 732 | 2.6 | ||||||
| Bureau | 674 | 5 | 405 | 269 | 2.8 | |||||
| Stephenson | 662 | 6 | 16 | 200 | 328 | 118 | 3.6 | |||
| Putnam | 647 | 6 | 320 | 193 | 110 | 24 | 2.2 | |||
| St. Clair | 645 | 4 | 150 | 350 | 145 | 3.3 | ||||
| Jefferson | 600 | 3 | 400 | 200 | 3.3 | |||||
| Marion | 549 | 4 | 199 | 200 | 150 | 3.3 | ||||
| Henry | 541 | 3 | 41 | 500 | 2.9 | |||||
| Hamilton | 540 | 3 | 140 | 200 | 200 | 1.7 | ||||
| Morgan | 520 | 4 | 170 | 350 | 7.6 | |||||
| Greene | 514 | 3 | 514 | 1.8 | ||||||
| Crawford | 500 | 2 | 250 | 250 | 0.9 | |||||
| Logan | 486 | 6 | 268 | 78 | 140 | 3.1 | ||||
| Piatt | 471 | 2 | 171 | 300 | 4.2 | |||||
| Dewitt | 463 | 4 | 350 | 92 | 21 | 0.8 | ||||
| Ogle | 448 | 5 | 210 | 150 | 88 | 6.3 | ||||
| Mercer | 446 | 2 | 196 | 250 | 1.7 | |||||
| Macoupin | 444 | 1 | 444 | 1.7 | ||||||
| Williamson | 440 | 2 | 190 | 250 | 2.7 | |||||
| Cook | 435 | 6 | 435 | 3.8 | 81% of 21 | |||||
| Winnebago | 430 | 3 | 280 | 150 | 0.9 | |||||
| Menard | 420 | 2 | 220 | 200 | 3.0 | |||||
| Mcdonough | 416 | 3 | 416 | 4.1 | ||||||
| White | 400 | 2 | 250 | 150 | 4.4 | |||||
| County not given | 375 | 2 | 225 | 150 | 1.3 | |||||
| Randolph | 318 | 2 | 250 | 68 | 5.0 | |||||
| Edwards | 238 | 2 | 238 | 5.0 | ||||||
| Madison | 225 | 1 | 225 | 1.7 | ||||||
| Marshall | 213 | 2 | 35 | 178 | 3.5 | |||||
| Kane | 210 | 2 | 210 | 3.2 | ||||||
| Clinton | 175 | 1 | 175 | 0.5 | ||||||
| Jackson | 150 | 1 | 150 | 6.7 | ||||||
| Effingham | 150 | 1 | 150 | 3.3 | ||||||
| Cass | 150 | 1 | 150 | 8.5 | ||||||
| Hancock | 127 | 1 | 127 | 1.7 | ||||||
| Pike | 100 | 1 | 100 | 1.7 | ||||||
| Warren | 35 | 1 | 35 | 3.3 | ||||||
| Wayne | 21 | 1 | 21 | 0.7 | ||||||
| Moultrie | 0 | 0 | ||||||||
| Carroll | 0 | 0 | ||||||||
| Douglas | 0 | 0 | ||||||||
| Jersey | 0 | 0 | ||||||||
| Bond | 0 | 0 | ||||||||
| Lawrence | 0 | 0 | ||||||||
| Jo Daviess | 0 | 0 | ||||||||
| Monroe | 0 | 0 | ||||||||
| Massac | 0 | 0 | ||||||||
| Gallatin | 0 | 0 | ||||||||
| Brown | 0 | 0 | ||||||||
| Boone | 0 | 0 | ||||||||
| Dupage | 0 | 0 |
Capacity is each request's first-listed capacity, so a hybrid's battery is not added on top. Most requests in a queue never get built.
Active requests
Status is as of Dec 31, 2025. Current status at Interconnection.fyi.
| Project | County | Type | MW | Entered the queue | Study phase | Utility or operator | Live status |
|---|---|---|---|---|---|---|---|
| J955 | Sangamon | Gas | 1,165 | 2018-03-08 | Construction | AMEREN TRANSMISSION COMPANY OF ILLINOIS | Current status |
| Heritage Prairie Wind | Kankakee | Wind | 850 | 2017-09-22 | IA Executed | ComEd | Current status |
| J2186 | Fulton | Solar | 821 | 2022-06-22 | Cluster Study | AMEREN TRANSMISSION COMPANY OF ILLINOIS | Current status |
| IP17 | Franklin | Coal | 550 | 2001-12-02 | IA Executed | MISO | Current status |
| J2171 | Perry | Solar+Wind | 500 | 2022-03-25 | Cluster Study | AMEREN ILLINOIS | Current status |
| J2690 | Washington | Wind+Battery | 500 | 2022-09-15 | Cluster Study | AMEREN ILLINOIS | Current status |
| J2694 | Christian | Solar+Wind+Battery | 500 | 2022-09-15 | Cluster Study | AMEREN ILLINOIS | Current status |
| J3076 | Wabash | Solar+Battery | 500 | 2022-09-15 | Cluster Study | DUKE ENERGY INDIANA | Current status |
| J3860 | Peoria | Wind | 500 | 2025-01-27 | AMEREN ILLINOIS | Current status | |
| AH2-416 | Livingston | Battery | 450 | 2022-03-10 | Feasibility Study | ComEd | Current status |
| J3730 | Macoupin | Wind | 444 | 2024-04-18 | In Progress (unknown study) | AMEREN ILLINOIS | Current status |
| J1263 | Clark | Solar+Battery | 409 | 2019-04-29 | IA Executed | AMEREN ILLINOIS | Current status |
| J3015 | Iroquois | Wind+Battery | 400 | 2022-09-14 | Cluster Study | AMEREN ILLINOIS | Current status |
| J3712 | Peoria | Wind | 400 | 2024-04-18 | In Progress (unknown study) | AMEREN TRANSMISSION COMPANY OF ILLINOIS | Current status |
| Surplus; G876/G877 | Mclean | Wind+Other | 400 | 2022-09-09 | GREAT RIVER ENERGY | Current status | |
| AG2-545 | Mchenry | Battery | 400 | 2025-03-06 | System Impact Study | ComEd | Current status |
| Surplus; Glacier Moraine | Cumberland | Solar+Other | 360 | 2024-07-15 | AMEREN ILLINOIS | Current status | |
| AJ1-012 | Lake | Battery | 354 | 2023-05-24 | Feasibility Study | ComEd | Current status |
| J2390 | Fulton | Solar+Battery | 350 | 2022-09-15 | Cluster Study | AMEREN TRANSMISSION COMPANY OF ILLINOIS | Current status |
| J3521 | Shelby | Wind | 350 | 2024-04-18 | In Progress (unknown study) | AMEREN ILLINOIS | Current status |
| Panther Grove Wind | Woodford | Wind | 350 | 2018-09-24 | IA Executed | ComEd | Current status |
| AH2-340 | Stark | Solar | 350 | 2022-03-10 | Feasibility Study | ComEd | Current status |
| J4000 | Scott | Solar | 343 | 2025-04-29 | AMEREN TRANSMISSION COMPANY OF ILLINOIS | Current status | |
| J1839 | Macon | Gas | 340 | 2020-06-25 | IA Pending | AMEREN ILLINOIS | Current status |
| J3950 | Clark | Solar | 340 | 2025-02-20 | AMEREN ILLINOIS | Current status | |
| J3991 | Mclean | Wind | 340 | 2025-04-17 | MISO | Current status | |
| AJ1-011 | Lake | Battery | 328 | 2023-05-24 | Feasibility Study | ComEd | Current status |
| Replacing 106 MW Coal with 106 MW BESS; Edwards Unit 3 | Peoria | Other+Battery | 322 | 2024-07-12 | AMEREN ILLINOIS | Current status | |
| J2603 | Mason | Solar | 320 | 2022-09-15 | Cluster Study | AMEREN ILLINOIS | Current status |
| J1360 | Piatt | Wind | 300 | 2019-04-29 | IA Executed | AMEREN ILLINOIS | Current status |
| J1712 | Perry | Solar | 300 | 2020-06-23 | IA Pending | AMEREN ILLINOIS | Current status |
| J2128 | Coles | Wind+Battery | 300 | 2021-08-13 | Cluster Study | AMEREN ILLINOIS | Current status |
| J2377 | Peoria | Battery | 300 | 2024-11-07 | Cluster Study | AMEREN ILLINOIS | Current status |
| J2556 | Whiteside | Solar | 300 | 2022-09-14 | Cluster Study | MIDAMERICAN ENERGY CO. | Current status |
| J2647 | Franklin | Battery | 300 | 2022-09-14 | Cluster Study | AMEREN ILLINOIS | Current status |
| J3027 | Stark | Wind+Battery | 300 | 2022-09-14 | Cluster Study | AMEREN TRANSMISSION COMPANY OF ILLINOIS | Current status |
| J3216 | Peoria | Battery | 300 | 2022-09-15 | Cluster Study | AMEREN ILLINOIS | Current status |
| J3412 | Ford | Solar | 300 | 2024-03-18 | In Progress (unknown study) | AMEREN ILLINOIS | Current status |
| J3417 | Macon | Battery | 300 | 2024-04-17 | In Progress (unknown study) | AMEREN ILLINOIS | Current status |
| J3498 | Knox | Solar | 300 | 2024-04-13 | In Progress (unknown study) | AMEREN TRANSMISSION COMPANY OF ILLINOIS | Current status |
| J3525 | Rock Island | Battery | 300 | 2024-04-17 | In Progress (unknown study) | MIDAMERICAN ENERGY CO. | Current status |
| J3558 | Champaign | Battery | 300 | 2024-04-18 | In Progress (unknown study) | AMEREN TRANSMISSION COMPANY OF ILLINOIS | Current status |
| J3681 | Mclean | Wind | 300 | 2024-04-18 | In Progress (unknown study) | AMEREN ILLINOIS | Current status |
| J3699 | Henry | Wind | 300 | 2024-04-18 | In Progress (unknown study) | MIDAMERICAN ENERGY CO. | Current status |
| J3853 | Iroquois | Wind | 300 | 2024-12-26 | AMEREN ILLINOIS | Current status | |
| J3901 | Shelby | Wind | 300 | 2025-01-17 | AMEREN ILLINOIS | Current status | |
| J3946 | Tazewell | Battery | 300 | 2025-03-31 | MISO | Current status | |
| J4112 | Rock Island | Wind | 300 | 2025-10-07 | MIDAMERICAN ENERGY CO. | Current status | |
| J844 | Knox | Wind | 300 | 2017-06-16 | Construction | AMEREN TRANSMISSION COMPANY OF ILLINOIS | Current status |
| Panther Grove 2 | Woodford | Wind | 300 | 2018-09-14 | IA Executed | ComEd | Current status |
| Steward Creek Solar | Lee | Solar | 300 | 2019-12-09 | System Impact Study | ComEd | Current status |
| South Dixon Solar | Lee | Solar | 300 | 2020-03-21 | Feasibility Study | ComEd | Current status |
| Pleasant Grove Solar | Mchenry | Solar | 300 | 2020-03-31 | System Impact Study | ComEd | Current status |
| Burr Oak Solar | Dekalb | Solar | 300 | 2020-08-31 | Feasibility Study | ComEd | Current status |
| Dawson Solar | Mclean | Solar | 300 | 2020-09-30 | Feasibility Study | ComEd | Current status |
| AG2-363 | Tazewell | Solar | 300 | 2025-03-04 | System Impact Study | ComEd | Current status |
| AH2-270 | Whiteside | Wind | 300 | 2022-03-10 | Feasibility Study | ComEd | Current status |
| AH2-415 | Livingston | Battery | 300 | 2022-03-10 | Feasibility Study | ComEd | Current status |
| AI1-024 | Mclean | Battery | 300 | 2022-04-01 | Feasibility Study | ComEd | Current status |
| Black Diamond Solar | Christian | Solar | 299 | 2019-03-28 | System Impact Study | ComEd | Current status |
| J3012 | Coles | Solar | 287 | 2022-09-14 | Cluster Study | AMEREN ILLINOIS | Current status |
| AG2-453 | Kendall | Solar | 280 | 2025-02-07 | System Impact Study | ComEd | Current status |
| AH2-342 | Stark | Solar | 280 | 2022-03-10 | Feasibility Study | ComEd | Current status |
| J813 | Clay | Solar | 275 | 2017-06-16 | Construction | AMEREN ILLINOIS | Current status |
| J2565 | Iroquois | Solar | 265 | 2022-09-14 | Cluster Study | AMEREN ILLINOIS | Current status |
| Beacon Solar | Rock Island | Solar | 260 | 2020-09-30 | Feasibility Study | ComEd | Current status |
| AJ1-014 | Will | Battery | 260 | 2023-05-24 | Feasibility Study | ComEd | Current status |
| Livingston Wind | Livingston | Wind | 255 | 2018-09-25 | System Impact Study | ComEd | Current status |
| Gipper Solar Farm | Whiteside | Solar | 255 | 2020-10-01 | Feasibility Study | ComEd | Current status |
| J3078 | Peoria | Wind | 252 | 2022-09-12 | Cluster Study | AMEREN TRANSMISSION COMPANY OF ILLINOIS | Current status |
| J1216 | Washington | Solar | 250 | 2019-04-27 | IA Executed | AMEREN ILLINOIS | Current status |
| J1840 | Dewitt | Solar | 250 | 2020-06-25 | IA Pending | AMEREN ILLINOIS | Current status |
| J2267 | Williamson | Solar+Battery | 250 | 2022-03-24 | Cluster Study | AMEREN ILLINOIS | Current status |
| J2275 | Peoria | Wind | 250 | 2022-03-22 | Cluster Study | AMEREN TRANSMISSION COMPANY OF ILLINOIS | Current status |
| J2662 | Cumberland | Solar | 250 | 2022-09-15 | Cluster Study | AMEREN ILLINOIS | Current status |
| J2793 | Saline | Solar | 250 | 2022-09-14 | Cluster Study | AMEREN ILLINOIS | Current status |
| J2922 | Jasper | Solar | 250 | 2022-09-14 | Cluster Study | AMEREN ILLINOIS | Current status |
| J2973 | Christian | Solar | 250 | 2022-09-15 | Cluster Study | AMEREN TRANSMISSION COMPANY OF ILLINOIS | Current status |
| J3074 | Randolph | Solar | 250 | 2022-09-15 | Cluster Study | AMEREN ILLINOIS | Current status |
| J3556 | Montgomery | Solar | 250 | 2024-04-18 | In Progress (unknown study) | AMEREN TRANSMISSION COMPANY OF ILLINOIS | Current status |
| J3750 | Mercer | Wind | 250 | 2024-04-18 | In Progress (unknown study) | MIDAMERICAN ENERGY CO. | Current status |
| J3805 | Fayette | Solar | 250 | 2024-03-27 | In Progress (unknown study) | AMEREN ILLINOIS | Current status |
| J3882 | Crawford | Solar | 250 | 2025-02-10 | AMEREN ILLINOIS | Current status | |
| J3883 | Crawford | Battery | 250 | 2025-02-10 | AMEREN ILLINOIS | Current status | |
| J3954 | Christian | Solar | 250 | 2025-04-09 | AMEREN TRANSMISSION COMPANY OF ILLINOIS | Current status | |
| J4018 | Ford | Wind | 250 | 2025-05-02 | AMEREN ILLINOIS | Current status | |
| J4118 | Mclean | Battery | 250 | 2025-09-24 | MISO | Current status | |
| J4198 | Christian | Battery | 250 | 2025-09-03 | MISO | Current status | |
| J800 | White | Solar | 250 | 2017-06-16 | Construction | AMEREN ILLINOIS | Current status |
| J815 | Christian | Solar | 250 | 2017-06-16 | Construction | AMEREN ILLINOIS | Current status |
| J848 | Christian | Wind | 250 | 2017-06-16 | Construction | AMEREN TRANSMISSION COMPANY OF ILLINOIS | Current status |
| AH2-113 | Livingston | Solar+Battery | 250 | 2022-02-22 | Feasibility Study | ComEd | Current status |
| AI1-149 | Mchenry | Battery | 250 | 2022-09-09 | Feasibility Study | ComEd | Current status |
| AI1-172 | Grundy | Solar+Battery | 250 | 2022-09-10 | Feasibility Study | ComEd | Current status |
| AJ1-013 | Will | Battery | 250 | 2023-05-24 | Feasibility Study | ComEd | Current status |
| J3949 | Scott | Solar | 245 | 2025-04-07 | AMEREN TRANSMISSION COMPANY OF ILLINOIS | Current status | |
| J4031 | Scott | Solar | 245 | 2025-05-12 | AMEREN TRANSMISSION COMPANY OF ILLINOIS | Current status | |
| J3856 | Wabash | Wind | 235 | 2024-12-26 | DUKE ENERGY INDIANA | Current status | |
| AH2-421 | Grundy | Battery | 230 | 2022-03-10 | Feasibility Study | ComEd | Current status |
| AI1-154 | Will | Battery | 230 | 2022-09-09 | Feasibility Study | ComEd | Current status |
| J3528 | Jasper | Solar+Battery | 225 | 2024-04-15 | In Progress (unknown study) | AMEREN ILLINOIS | Current status |
| J3727 | Madison | Battery | 225 | 2024-04-16 | In Progress (unknown study) | AMEREN ILLINOIS | Current status |
| J3830 | Wind | 225 | 2024-04-16 | In Progress (unknown study) | AMEREN ILLINOIS | Current status | |
| J2554 | Putnam | Solar | 220 | 2022-09-14 | Cluster Study | AMEREN ILLINOIS | Current status |
| J3418 | Sangamon | Solar | 220 | 2024-04-17 | In Progress (unknown study) | AMEREN TRANSMISSION COMPANY OF ILLINOIS | Current status |
| J4041 | Menard | Solar | 220 | 2025-06-12 | AMEREN ILLINOIS | Current status | |
| Bluejacket Solar | Bureau | Solar | 205 | 2025-11-06 | In Progress (unknown study) | Hoosier Energy | Current status |
| Pumpkin Patch | Greene | Solar | 204 | 2025-11-06 | In Progress (unknown study) | Hoosier Energy | Current status |
| J3391 | Coles | Wind | 200 | 2024-04-10 | In Progress (unknown study) | AMEREN TRANSMISSION COMPANY OF ILLINOIS | Current status |
| J1115 | Macon | Wind | 200 | 2018-03-12 | Construction | AMEREN ILLINOIS | Current status |
| J1241 | Jefferson | Solar | 200 | 2019-04-29 | IA Executed | AMEREN ILLINOIS | Current status |
| J1289 | Morgan | Wind | 200 | 2019-04-29 | IA Executed | AMEREN ILLINOIS | Current status |
| J1306 | Perry | Solar | 200 | 2019-04-29 | IA Executed | AMEREN ILLINOIS | Current status |
| J1701 | Mcdonough | Wind | 200 | 2021-12-03 | IA Pending | AMEREN ILLINOIS | Current status |
| J1831 | Menard | Wind | 200 | 2020-06-25 | IA Pending | AMEREN ILLINOIS | Current status |
| J1926 | Tazewell | Wind | 200 | 2022-03-23 | Cluster Study | AMEREN ILLINOIS | Current status |
| J2033 | Clay | Solar | 200 | 2021-08-26 | Cluster Study | AMEREN ILLINOIS | Current status |
| J2049 | Shelby | Wind | 200 | 2022-03-25 | Cluster Study | AMEREN ILLINOIS | Current status |
| J2379 | Clay | Battery | 200 | 2022-09-14 | Cluster Study | AMEREN ILLINOIS | Current status |
| J2388 | Macon | Solar+Battery | 200 | 2022-09-15 | Cluster Study | AMEREN TRANSMISSION COMPANY OF ILLINOIS | Current status |
| J2402 | Johnson | Battery | 200 | 2022-09-15 | Cluster Study | AMEREN ILLINOIS | Current status |
| J2403 | Johnson | Solar | 200 | 2022-09-15 | Cluster Study | AMEREN ILLINOIS | Current status |
| J2532 | Sangamon | Battery | 200 | 2022-09-15 | Cluster Study | AMEREN ILLINOIS | Current status |
| J2587 | Edgar | Battery | 200 | 2022-09-15 | Cluster Study | DUKE ENERGY INDIANA | Current status |
| J2607 | Montgomery | Battery | 200 | 2022-09-15 | Cluster Study | AMEREN ILLINOIS | Current status |
| J2614 | Henry | Wind | 200 | 2022-09-15 | Cluster Study | Southern Indiana Gas & Electric Company d/b/a Centerpoint Energy Indiana South | Current status |
| J2938 | Knox | Wind | 200 | 2022-09-15 | Cluster Study | AMEREN ILLINOIS | Current status |
| J2963 | Mason | Wind | 200 | 2022-09-14 | Cluster Study | AMEREN ILLINOIS | Current status |
| J2998 | St. Clair | Battery | 200 | 2022-09-14 | Cluster Study | AMEREN ILLINOIS | Current status |
| J3031 | Jefferson | Battery | 200 | 2022-09-14 | Cluster Study | AMEREN ILLINOIS | Current status |
| J3080 | Pulaski | Solar+Battery | 200 | 2022-09-15 | Cluster Study | AMEREN ILLINOIS | Current status |
| J3095 | Ford | Solar | 200 | 2022-09-13 | Cluster Study | AMEREN ILLINOIS | Current status |
| J3256 | Clark | Solar | 200 | 2024-04-13 | In Progress (unknown study) | AMEREN ILLINOIS | Current status |
| J3296 | Hamilton | Battery | 200 | 2024-04-17 | In Progress (unknown study) | Southern Illinois Power Cooperative | Current status |
| J3298 | Tazewell | Battery | 200 | 2024-04-17 | In Progress (unknown study) | AMEREN ILLINOIS | Current status |
| J3493 | Mcdonough | Wind | 200 | 2024-04-17 | In Progress (unknown study) | AMEREN TRANSMISSION COMPANY OF ILLINOIS | Current status |
| J3497 | Pulaski | Battery | 200 | 2024-04-17 | In Progress (unknown study) | AMEREN ILLINOIS | Current status |
| J3660 | Rock Island | Battery | 200 | 2024-04-18 | In Progress (unknown study) | MIDAMERICAN ENERGY CO. | Current status |
| J3718 | Greene | Solar | 200 | 2024-03-20 | In Progress (unknown study) | AMEREN ILLINOIS | Current status |
| J3729 | Franklin | Battery | 200 | 2024-04-18 | In Progress (unknown study) | AMEREN ILLINOIS | Current status |
| J3811 | Clay | Solar | 200 | 2024-04-18 | In Progress (unknown study) | AMEREN ILLINOIS | Current status |
| J3847 | Jefferson | Solar | 200 | 2025-01-03 | MISO | Current status | |
| J3880 | Clay | Solar | 200 | 2025-02-10 | AMEREN ILLINOIS | Current status | |
| J3881 | Clay | Battery | 200 | 2025-02-10 | AMEREN ILLINOIS | Current status | |
| J3907 | Stark | Wind | 200 | 2025-03-11 | AMEREN ILLINOIS | Current status | |
| J3944 | Bureau | Solar | 200 | 2025-02-20 | AMEREN ILLINOIS | Current status | |
| J3947 | Shelby | Battery | 200 | 2025-03-25 | AMEREN TRANSMISSION COMPANY OF ILLINOIS | Current status | |
| J4002 | Edgar | Battery | 200 | 2025-04-30 | AMEREN TRANSMISSION COMPANY OF ILLINOIS | Current status | |
| J4003 | Edgar | Solar | 200 | 2025-04-30 | AMEREN TRANSMISSION COMPANY OF ILLINOIS | Current status | |
| J4137 | Pulaski | Battery | 200 | 2025-09-29 | GridUnity | Current status | |
| J4199 | Fulton | Battery | 200 | 2025-09-29 | ENTERGY MISSISSIPPI, LLC. | Current status | |
| J4204 | Marion | Battery | 200 | MISO | Current status | ||
| Surplus; J1712 | Perry | Battery | 200 | 2025-04-22 | AMEREN TRANSMISSION COMPANY OF ILLINOIS | Current status | |
| Blooming Grove Solar Energy Center | Livingston | Solar | 200 | 2018-09-26 | IA Executed | ComEd | Current status |
| Rolling Farms Wind Project | Christian | Wind | 200 | 2019-08-30 | IA Executed | ComEd | Current status |
| South Dixon Solar | Lee | Solar | 200 | 2019-09-10 | System Impact Study | ComEd | Current status |
| Steward Creek Solar | Lee | Solar | 200 | 2020-03-24 | System Impact Study | ComEd | Current status |
| Riverbank Energy | Cook | Battery | 200 | 2020-03-31 | Feasibility Study | ComEd | Current status |
| AG2-364 | Tazewell | Solar | 200 | 2025-03-04 | System Impact Study | ComEd | Current status |
| AG2-544 | Mchenry | Battery | 200 | 2025-03-06 | System Impact Study | ComEd | Current status |
| AH1-044 | Lee | Solar | 200 | 2025-02-04 | System Impact Study | ComEd | Current status |
| AH1-150 | Lee | Solar | 200 | 2025-02-04 | System Impact Study | ComEd | Current status |
| AH1-151 | Lee | Solar | 200 | 2025-02-04 | System Impact Study | ComEd | Current status |
| AH2-363 | Kankakee | Solar+Battery | 200 | 2022-03-10 | Feasibility Study | ComEd | Current status |
| AI1-023 | Mclean | Battery | 200 | 2022-04-01 | Feasibility Study | ComEd | Current status |
| AI1-191 | Stephenson | Wind | 200 | 2022-09-09 | Feasibility Study | ComEd | Current status |
| J3338 | Hamilton | Wind | 200 | 2024-04-18 | In Progress (unknown study) | AMEREN ILLINOIS | Current status |
| J3515 | Sangamon | Battery | 200 | 2024-04-17 | In Progress (unknown study) | CITY WATER LIGHT & POWER | Current status |
| J3519 | Mason | Wind | 200 | 2024-04-17 | In Progress (unknown study) | AMEREN ILLINOIS | Current status |
| J2575 | Tazewell | Battery | 198 | 2022-09-15 | Cluster Study | AMEREN ILLINOIS | Current status |
| J3566 | Mclean | Wind | 198 | 2024-04-18 | In Progress (unknown study) | AMEREN ILLINOIS | Current status |
| J3801 | Mercer | Solar | 196 | 2024-04-18 | In Progress (unknown study) | MIDAMERICAN ENERGY CO. | Current status |
| J3753 | Iroquois | Wind | 196 | 2024-04-18 | In Progress (unknown study) | AMEREN TRANSMISSION COMPANY OF ILLINOIS | Current status |
| J2334 | Montgomery | Solar | 195 | 2022-09-14 | Cluster Study | AMEREN ILLINOIS | Current status |
| J3353 | Champaign | Solar | 191 | 2024-04-18 | In Progress (unknown study) | AMEREN TRANSMISSION COMPANY OF ILLINOIS | Current status |
| J2136 | Iroquois | Solar | 191 | 2022-03-23 | Cluster Study | AMEREN ILLINOIS | Current status |
| Gipper Wind Farm | Whiteside | Wind | 191 | 2019-09-30 | System Impact Study | ComEd | Current status |
| J3517 | Williamson | Battery | 190 | 2024-04-19 | AMEREN ILLINOIS | Current status | |
| J3686 | Christian | Solar | 190 | 2024-04-17 | In Progress (unknown study) | AMEREN ILLINOIS | Current status |
| Surplus; AMIL.TILT1-4 | Vermilion | Solar | 188 | 2025-05-23 | AMEREN ILLINOIS | Current status | |
| J2937 | Montgomery | Solar | 186 | 2022-09-15 | Cluster Study | AMEREN ILLINOIS | Current status |
| J1677 | Macon | Solar | 180 | 2020-06-24 | IA Pending | AMEREN ILLINOIS | Current status |
| J2656 | Macon | Solar | 180 | 2022-09-15 | Cluster Study | AMEREN ILLINOIS | Current status |
| J3003 | Mason | Solar+Battery | 180 | 2022-09-15 | Cluster Study | AMEREN ILLINOIS | Current status |
| J3167 | Fulton | Solar | 180 | 2022-09-15 | Cluster Study | AMEREN TRANSMISSION COMPANY OF ILLINOIS | Current status |
| J3342 | Vermilion | Solar | 180 | 2024-04-18 | In Progress (unknown study) | AMEREN ILLINOIS | Current status |
| AH1-338 | Lee | Solar | 180 | 2025-02-13 | System Impact Study | ComEd | Current status |
| J2247 | Marshall | Wind | 178 | 2022-03-25 | Cluster Study | AMEREN ILLINOIS | Current status |
| J2258 | Adams | Solar | 175 | 2022-03-28 | Cluster Study | AMEREN ILLINOIS | Current status |
| J2266 | Edgar | Solar+Battery | 175 | 2025-06-09 | Cluster Study | AMEREN ILLINOIS | Current status |
| J2273 | Clinton | Solar+Battery | 175 | 2025-07-03 | Cluster Study | AMEREN ILLINOIS | Current status |
| J3254 | Pulaski | Solar+Battery | 175 | 2024-04-15 | In Progress (unknown study) | AMEREN TRANSMISSION COMPANY OF ILLINOIS | Current status |
| J3340 | Vermilion | Solar | 175 | 2024-03-18 | In Progress (unknown study) | AMEREN ILLINOIS | Current status |
| J3732 | Saline | Solar+Battery | 175 | 2024-04-15 | In Progress (unknown study) | AMEREN ILLINOIS | Current status |
| J3904 | Tazewell | Battery | 175 | 2025-03-12 | AMEREN ILLINOIS | Current status | |
| J3905 | Tazewell | Wind | 175 | 2025-03-12 | AMEREN ILLINOIS | Current status | |
| AH1-714 | Lasalle | Nuclear | 174 | 2025-04-09 | System Impact Study | ComEd | Current status |
| AH2-258 | Kendall | Solar+Battery | 172 | 2022-03-09 | Feasibility Study | ComEd | Current status |
| AH2-259 | Kendall | Battery | 172 | 2022-03-09 | Feasibility Study | ComEd | Current status |
| J3382 | Piatt | Solar | 171 | 2024-04-18 | In Progress (unknown study) | AMEREN ILLINOIS | Current status |
| AH2-204 | Stephenson | Battery | 170 | 2022-03-09 | Feasibility Study | ComEd | Current status |
| AI1-156 | Kane | Battery | 170 | 2022-09-09 | Feasibility Study | ComEd | Current status |
| Surplus; J291 | Scott | Solar | 169 | 2025-08-19 | AMEREN ILLINOIS | Current status | |
| AI1-148 | Kankakee | Solar | 164 | 2022-09-09 | Feasibility Study | ComEd | Current status |
| AH2-338 | Winnebago | Solar | 160 | 2022-03-10 | Feasibility Study | ComEd | Current status |
| AH1-543 | Livingston | Solar+Battery | 157 | 2025-02-03 | System Impact Study | ComEd | Current status |
| J3064 | Perry | Solar | 157 | 2022-09-15 | Cluster Study | AMEREN ILLINOIS | Current status |
| AH2-376 | Whiteside | Battery | 153 | 2022-03-10 | Feasibility Study | ComEd | Current status |
| J1094 | Washington | Solar | 150 | 2018-03-12 | Construction | AMEREN ILLINOIS | Current status |
| J1096 | Saline | Solar | 150 | 2018-03-12 | Construction | AMEREN ILLINOIS | Current status |
| J1139 | Champaign | Solar | 150 | 2018-03-12 | IA Executed | AMEREN ILLINOIS | Current status |
| J1302 | Saline | Solar | 150 | 2019-04-29 | IA Executed | AMEREN ILLINOIS | Current status |
| J1303 | Jackson | Solar | 150 | 2019-04-29 | IA Executed | Southern Illinois Power Cooperative | Current status |
| J1311 | St. Clair | Solar | 150 | 2019-04-29 | IA Executed | AMEREN ILLINOIS | Current status |
| J1382 | Clark | Solar | 150 | 2019-04-29 | IA Executed | AMEREN ILLINOIS | Current status |
| J1383 | Fulton | Solar | 150 | 2019-04-29 | IA Executed | AMEREN ILLINOIS | Current status |
| J1422 | Edwards | Solar+Battery | 150 | 2019-04-29 | IA Executed | AMEREN ILLINOIS | Current status |
| J1626 | Fayette | Solar | 150 | 2020-06-23 | IA Pending | AMEREN ILLINOIS | Current status |
| J1653 | Tazewell | Solar | 150 | 2021-12-03 | IA Pending | AMEREN ILLINOIS | Current status |
| J1967 | Champaign | Wind | 150 | 2022-03-24 | Cluster Study | AMEREN ILLINOIS | Current status |
| J2131 | Jasper | Solar | 150 | 2021-08-16 | Cluster Study | AMEREN ILLINOIS | Current status |
| J2151 | Saline | Solar+Battery | 150 | 2021-08-12 | Cluster Study | AMEREN ILLINOIS | Current status |
| J2156 | Johnson | Solar | 150 | 2022-06-28 | Cluster Study | AMEREN ILLINOIS | Current status |
| J2170 | Clark | Battery | 150 | 2022-04-05 | Cluster Study | AMEREN ILLINOIS | Current status |
| J2203 | Adams | Battery | 150 | 2022-03-25 | Cluster Study | AMEREN ILLINOIS | Current status |
| J2389 | Adams | Solar+Battery | 150 | 2022-09-15 | Cluster Study | AMEREN ILLINOIS | Current status |
| J2401 | Johnson | Solar | 150 | 2022-09-15 | Cluster Study | AMEREN ILLINOIS | Current status |
| J2627 | Adams | Battery | 150 | 2022-09-15 | Cluster Study | AMEREN ILLINOIS | Current status |
| J2659 | Sangamon | Solar | 150 | 2025-10-27 | Cluster Study | AMEREN TRANSMISSION COMPANY OF ILLINOIS | Current status |
| J2797 | White | Solar+Battery | 150 | 2025-10-25 | Cluster Study | AMEREN ILLINOIS | Current status |
| J3185 | Effingham | Solar+Battery | 150 | 2022-09-15 | Cluster Study | AMEREN ILLINOIS | Current status |
| J3224 | Marion | Solar+Battery | 150 | 2022-09-15 | Cluster Study | AMEREN ILLINOIS | Current status |
| J3306 | Perry | Solar | 150 | 2024-04-16 | In Progress (unknown study) | AMEREN TRANSMISSION COMPANY OF ILLINOIS | Current status |
| J3316 | Washington | Battery | 150 | 2024-05-06 | In Progress (unknown study) | AMEREN ILLINOIS | Current status |
| J3695 | Clark | Battery | 150 | 2024-04-18 | In Progress (unknown study) | AMEREN ILLINOIS | Current status |
| J4007 | Peoria | Wind | 150 | 2025-05-15 | AMEREN TRANSMISSION COMPANY OF ILLINOIS | Current status | |
| J750 | Morgan | Wind | 150 | 2017-06-16 | Construction | City of Springfield, IL - CWLP | Current status |
| Surplus; Shelby | Cumberland | Solar+Other | 150 | 2024-06-14 | AMEREN ILLINOIS | Current status | |
| Surplus | St. Clair | Battery | 150 | 2025-01-13 | AMEREN ILLINOIS | Current status | |
| Osagrove Flats Wind | Lasalle | Wind | 150 | 2018-01-22 | IA Executed | ComEd | Current status |
| Leaf River Wind | Ogle | Wind | 150 | 2018-09-13 | System Impact Study | ComEd | Current status |
| Heritage Prairie Solar | Kankakee | Solar | 150 | 2018-09-24 | IA Executed | ComEd | Current status |
| Heritage Prairie Solar | Kankakee | Solar | 150 | 2019-03-04 | IA Executed | ComEd | Current status |
| Bright Stalk Generating Facility | Mclean | Wind | 150 | 2019-03-22 | System Impact Study | ComEd | Current status |
| Plano Skies Energy Center | Kendall | Solar | 150 | 2019-03-31 | System Impact Study | ComEd | Current status |
| Otter Creek Solar | Lasalle | Solar | 150 | 2020-03-12 | System Impact Study | ComEd | Current status |
| Osagrove Flats Solar | Lasalle | Solar | 150 | 2020-03-12 | System Impact Study | ComEd | Current status |
| Bright Stalk Generating Facility | Mclean | Solar | 150 | 2020-03-26 | System Impact Study | ComEd | Current status |
| AH1-196 | Mchenry | Solar | 150 | 2025-03-03 | System Impact Study | ComEd | Current status |
| AH1-341 | Ogle | Solar | 150 | 2025-03-04 | System Impact Study | ComEd | Current status |
| Aurora Battery Storage II | Battery | 150 | 2025-02-26 | System Impact Study | ComEd | Current status | |
| AH1-564 | Winnebago | Battery | 150 | 2025-03-12 | System Impact Study | ComEd | Current status |
| AH2-377 | Grundy | Battery | 150 | 2022-03-10 | Feasibility Study | ComEd | Current status |
| J859 | Cass | Solar | 150 | 2017-06-16 | Construction | AMEREN ILLINOIS | Current status |
| J1651 | Logan | Solar | 150 | 2020-06-23 | IA Pending | AMEREN ILLINOIS | Current status |
| J1744 | Cumberland | Solar | 150 | 2022-04-05 | IA Pending | AMEREN ILLINOIS | Current status |
| J1755 | Bureau | Wind | 147 | 2020-06-25 | IA Pending | AMEREN ILLINOIS | Current status |
| J3754 | Iroquois | Wind | 147 | 2024-04-18 | In Progress (unknown study) | AMEREN TRANSMISSION COMPANY OF ILLINOIS | Current status |
| J3755 | Iroquois | Wind | 147 | 2024-04-18 | In Progress (unknown study) | AMEREN TRANSMISSION COMPANY OF ILLINOIS | Current status |
| AH2-085 | Dekalb | Solar | 145 | 2022-01-28 | Feasibility Study | ComEd | Current status |
| J2311 | Putnam | Wind | 145 | 2024-10-18 | Cluster Study | AMEREN ILLINOIS | Current status |
| J3184 | St. Clair | Solar+Battery | 145 | 2022-09-15 | Cluster Study | AMEREN ILLINOIS | Current status |
| Kankakee Solar | Kankakee | Solar | 144 | 2020-02-13 | System Impact Study | ComEd | Current status |
| J3063 | Perry | Battery | 143 | 2022-09-15 | Cluster Study | AMEREN ILLINOIS | Current status |
| J3004 | Mason | Solar+Battery | 142 | 2022-09-15 | Cluster Study | AMEREN ILLINOIS | Current status |
| J3797 | Edgar | Solar | 141 | 2024-04-18 | In Progress (unknown study) | AMEREN TRANSMISSION COMPANY OF ILLINOIS | Current status |
| J2972 | Adams | Solar | 140 | 2022-09-15 | Cluster Study | AMEREN ILLINOIS | Current status |
| J3611 | Hamilton | Solar | 140 | 2024-04-18 | In Progress (unknown study) | AMEREN ILLINOIS | Current status |
| J641 | Morgan | Solar | 140 | 2016-05-09 | IA Executed | MISO | Current status |
| J3918 | Champaign | Wind | 138 | 2025-02-06 | AMEREN ILLINOIS | Current status | |
| J2648 | Champaign | Solar+Battery | 135 | 2022-09-15 | Cluster Study | AMEREN ILLINOIS | Current status |
| Surplus; J734 | Mclean | Solar+Other | 135 | 2022-12-16 | AMEREN ILLINOIS | Current status | |
| Surplus; J33/J734 | Ford | Solar+Other | 135 | 2023-05-19 | AMEREN ILLINOIS | Current status | |
| AI2-390 | Mclean | Wind | 134 | 2023-03-04 | Feasibility Study | ComEd | Current status |
| J2809 | Iroquois | Solar | 133 | 2022-09-14 | Cluster Study | AMEREN ILLINOIS | Current status |
| AH1-698 | Will | Nuclear | 130 | 2025-04-08 | System Impact Study | ComEd | Current status |
| J2738 | Rock Island | Solar+Battery | 128 | 2022-09-15 | Cluster Study | MIDAMERICAN ENERGY CO. | Current status |
| Lincoln Capital Land LLC Solar Project | Sangamon | Solar | 128 | 2025-08-06 | In Progress (unknown study) | City Water Light & Power (CWLP) | Current status |
| J3820 | Hancock | Wind | 127 | 2024-04-16 | In Progress (unknown study) | AMEREN ILLINOIS | Current status |
| J1679 | Clay | Solar | 125 | 2020-06-24 | IA Pending | AMEREN ILLINOIS | Current status |
| J2384 | Shelby | Solar | 125 | 2022-09-15 | Cluster Study | AMEREN ILLINOIS | Current status |
| Jackson Generation | Will | Gas | 120 | 2018-03-31 | IA Executed | ComEd | Current status |
| AG2-516 | Winnebago | Solar | 120 | 2025-02-18 | System Impact Study | ComEd | Current status |
| AI1-174 | Stephenson | Solar+Battery | 118 | 2022-09-09 | Feasibility Study | ComEd | Current status |
| Buffalo Solar | Grundy | Solar | 116 | 2018-03-01 | IA Executed | ComEd | Current status |
| J2886 | Sangamon | Solar+Battery | 115 | 2022-09-15 | Cluster Study | AMEREN ILLINOIS | Current status |
| J3687 | Fayette | Solar | 113 | 2024-04-16 | In Progress (unknown study) | MISO | Current status |
| J2551 | Putnam | Battery | 110 | 2022-09-14 | Cluster Study | AMEREN ILLINOIS | Current status |
| J3602 | Mclean | Wind | 110 | 2024-04-17 | In Progress (unknown study) | AMEREN ILLINOIS | Current status |
| J644 | Greene | Solar | 110 | 2016-05-09 | IA Executed | MISO | Current status |
| AG2-524 | Grundy | Solar+Battery | 110 | 2025-03-03 | System Impact Study | ComEd | Current status |
| AH2-015 | Lee | Battery | 110 | 2021-10-20 | Feasibility Study | ComEd | Current status |
| AI1-155 | Cook | Battery | 110 | 2022-09-09 | Feasibility Study | ComEd | Current status |
| AH2-375 | Stephenson | Battery | 106 | 2022-03-10 | Feasibility Study | ComEd | Current status |
| Shady Oaks Wind Power Project | Lee | Wind | 106 | 2018-03-25 | IA Executed | ComEd | Current status |
| Three Rivers Energy Center | Grundy | Gas | 103 | 2017-07-29 | IA Executed | ComEd | Current status |
| J1610 | Sangamon | Solar | 100 | 2020-06-16 | IA Pending | CITY WATER LIGHT & POWER | Current status |
| J1714 | Fayette | Solar | 100 | 2020-06-25 | IA Pending | AMEREN ILLINOIS | Current status |
| J1725 | Tazewell | Wind | 100 | 2020-06-23 | IA Pending | AMEREN ILLINOIS | Current status |
| J1777 | Perry | Solar | 100 | 2020-06-25 | IA Pending | AMEREN ILLINOIS | Current status |
| J2124 | Champaign | Battery | 100 | 2021-08-06 | Cluster Study | AMEREN TRANSMISSION COMPANY OF ILLINOIS | Current status |
| J2195 | Fayette | Battery | 100 | 2025-01-10 | Cluster Study | AMEREN ILLINOIS | Current status |
| J2197 | Clay | Battery | 100 | 2025-01-10 | Cluster Study | AMEREN ILLINOIS | Current status |
| J2233 | Vermilion | Solar | 100 | 2022-06-14 | Cluster Study | AMEREN ILLINOIS | Current status |
| J2375 | Macon | Battery | 100 | 2022-09-15 | Cluster Study | AMEREN TRANSMISSION COMPANY OF ILLINOIS | Current status |
| J2383 | Macon | Battery | 100 | 2022-09-15 | Cluster Study | AMEREN TRANSMISSION COMPANY OF ILLINOIS | Current status |
| J2474 | Sangamon | Solar+Battery | 100 | 2022-09-15 | Cluster Study | AMEREN ILLINOIS | Current status |
| J2808 | Fayette | Solar | 100 | 2022-09-14 | Cluster Study | AMEREN ILLINOIS | Current status |
| J3130 | Marion | Solar | 100 | 2022-09-09 | Cluster Study | AMEREN ILLINOIS | Current status |
| J3181 | Logan | Solar+Battery | 100 | 2022-09-15 | Cluster Study | AMEREN ILLINOIS | Current status |
| J3341 | Vermilion | Wind | 100 | 2024-04-18 | In Progress (unknown study) | AMEREN ILLINOIS | Current status |
| J3344 | Knox | Battery | 100 | 2024-04-13 | In Progress (unknown study) | AMEREN TRANSMISSION COMPANY OF ILLINOIS | Current status |
| J3379 | Johnson | Solar | 100 | 2024-04-18 | In Progress (unknown study) | AMEREN ILLINOIS | Current status |
| J3456 | Tazewell | Wind | 100 | 2024-04-18 | In Progress (unknown study) | AMEREN ILLINOIS | Current status |
| J3565 | Champaign | Battery | 100 | 2024-04-18 | In Progress (unknown study) | AMEREN TRANSMISSION COMPANY OF ILLINOIS | Current status |
| J3674 | Jasper | Solar | 100 | 2024-04-17 | In Progress (unknown study) | AMEREN ILLINOIS | Current status |
| J3685 | Pike | Solar | 100 | 2024-04-17 | In Progress (unknown study) | AMEREN ILLINOIS | Current status |
| J3899 | Putnam | Solar | 100 | 2024-12-03 | AMEREN ILLINOIS | Current status | |
| J3916 | Saline | Solar | 100 | 2024-10-25 | AMEREN ILLINOIS | Current status | |
| J3968 | Coles | Battery | 100 | 2025-03-14 | AMEREN ILLINOIS | Current status | |
| J3990 | Mclean | Wind | 100 | 2025-04-17 | MISO | Current status | |
| J4158 | Dewitt | Solar | 100 | 2025-10-02 | AMEREN ILLINOIS | Current status | |
| J912 | Christian | Solar | 100 | 2017-06-16 | Construction | AMEREN TRANSMISSION COMPANY OF ILLINOIS | Current status |
| Surplus | Perry | Battery | 100 | 2025-06-17 | AMEREN ILLINOIS | Current status | |
| Surplus | Fayette | Battery | 100 | 2025-07-28 | AMEREN ILLINOIS | Current status | |
| Panther Grove 2 | Woodford | Wind | 100 | 2019-03-26 | IA Executed | ComEd | Current status |
| Plano Skies Energy Center | Kendall | Solar | 100 | 2019-05-17 | System Impact Study | ComEd | Current status |
| Steward Creek Solar | Lee | Solar | 100 | 2020-03-24 | System Impact Study | ComEd | Current status |
| Grand Marsh Solar | Kankakee | Solar | 100 | 2020-03-31 | System Impact Study | ComEd | Current status |
| AG2-114 | Livingston | Solar | 100 | 2025-02-14 | System Impact Study | ComEd | Current status |
| AH2-120 | Mchenry | Battery | 100 | 2022-02-26 | Feasibility Study | ComEd | Current status |
| AH2-121 | Mchenry | Battery | 100 | 2022-02-26 | Feasibility Study | ComEd | Current status |
| AH2-122 | Lee | Battery | 100 | 2022-02-26 | Feasibility Study | ComEd | Current status |
| AH2-123 | Lee | Battery | 100 | 2022-02-26 | Feasibility Study | ComEd | Current status |
| AH2-124 | Lee | Battery | 100 | 2022-02-26 | Feasibility Study | ComEd | Current status |
| AI1-170 | Dekalb | Solar+Battery | 100 | 2022-09-10 | Feasibility Study | ComEd | Current status |
| AI1-171 | Whiteside | Solar | 100 | 2022-09-10 | Feasibility Study | ComEd | Current status |
| J1232 | Coles | Solar | 99 | 2019-04-29 | IA Executed | AMEREN ILLINOIS | Current status |
| J1266 | Marion | Solar | 99 | 2019-04-29 | IA Executed | AMEREN ILLINOIS | Current status |
| AI2-487 | Bureau | Wind | 97 | 2023-03-10 | Feasibility Study | ComEd | Current status |
| AI2-488 | Lee | Wind | 97 | 2023-03-10 | Feasibility Study | ComEd | Current status |
| J2918 | Jasper | Solar | 97 | 2022-09-14 | Cluster Study | AMEREN ILLINOIS | Current status |
| Red Maple Solar | Dekalb | Solar | 95 | 2020-08-31 | Feasibility Study | ComEd | Current status |
| Red Maple Solar | Adams | Solar | 95 | 2020-03-31 | IA Executed | ComEd | Current status |
| AH1-541 | Dewitt | Solar+Battery | 92 | 2025-02-20 | System Impact Study | ComEd | Current status |
| J2794 | Fayette | Solar | 90 | 2022-08-23 | Cluster Study | AMEREN ILLINOIS | Current status |
| J3223 | Edwards | Solar+Battery | 88 | 2022-09-15 | Cluster Study | AMEREN ILLINOIS | Current status |
| AH1-702 | Ogle | Nuclear | 88 | 2025-04-07 | System Impact Study | ComEd | Current status |
| AH1-673 | Cook | Battery | 85 | 2025-02-18 | System Impact Study | ComEd | Current status |
| J1208 | Saline | Solar | 80 | 2019-04-27 | IA Executed | AMEREN ILLINOIS | Current status |
| J1209 | Saline | Solar | 80 | 2019-04-27 | IA Executed | AMEREN ILLINOIS | Current status |
| J2552 | Rock Island | Battery | 80 | 2022-09-14 | Cluster Study | MIDAMERICAN ENERGY CO. | Current status |
| AG2-675 | Rock Island | Battery | 80 | 2025-02-07 | System Impact Study | ComEd | Current status |
| AI2-167 | Logan | Wind | 78 | 2023-03-01 | Feasibility Study | ComEd | Current status |
| J1180 | Clark | Solar | 75 | 2018-03-12 | Construction | AMEREN ILLINOIS | Current status |
| J1475 | Clark | Solar | 75 | 2019-04-29 | IA Executed | AMEREN ILLINOIS | Current status |
| AH1-165 | Will | Battery | 72 | 2025-02-18 | System Impact Study | ComEd | Current status |
| AI2-409 | Dekalb | Solar | 72 | 2023-03-02 | Feasibility Study | ComEd | Current status |
| J1102 | Logan | Solar | 70 | 2018-03-12 | Construction | AMEREN ILLINOIS | Current status |
| AI2-163 | Mclean | Wind | 69 | 2023-03-01 | Feasibility Study | ComEd | Current status |
| J1202 | Randolph | Solar+Battery | 68 | 2019-04-25 | IA Executed | AMEREN ILLINOIS | Current status |
| J3976 | Fayette | Wind | 67 | 2025-03-25 | AMEREN ILLINOIS | Current status | |
| AI1-147 | Dekalb | Solar | 64 | 2022-09-09 | Feasibility Study | ComEd | Current status |
| J2376 | Shelby | Battery | 60 | 2022-09-15 | Cluster Study | AMEREN ILLINOIS | Current status |
| AI2-245 | Woodford | Solar | 55 | 2023-03-02 | Feasibility Study | ComEd | Current status |
| AG2-585 | Kankakee | Solar | 55 | 2025-03-05 | System Impact Study | ComEd | Current status |
| AH2-372 | Stephenson | Battery | 52 | 2022-03-10 | Feasibility Study | ComEd | Current status |
| J1198 | Jasper | Solar+Battery | 52 | 2019-04-25 | IA Executed | AMEREN ILLINOIS | Current status |
| AH2-199 | Will | Solar+Battery | 52 | 2022-03-08 | Feasibility Study | ComEd | Current status |
| J2159 | Clark | Battery | 50 | 2021-08-24 | Cluster Study | AMEREN ILLINOIS | Current status |
| J2974 | Adams | Battery | 50 | 2022-09-15 | Cluster Study | AMEREN ILLINOIS | Current status |
| J3892 | Sangamon | Battery | 50 | 2025-01-29 | CITY WATER LIGHT & POWER | Current status | |
| Staley Solar | Kankakee | Solar | 50 | 2017-03-29 | IA Executed | ComEd | Current status |
| Panther Grove Wind | Woodford | Wind | 50 | 2019-03-29 | IA Executed | ComEd | Current status |
| Zion Energy Center - BESS | Lake | Battery | 50 | 2019-11-15 | IA Executed | ComEd | Current status |
| Top Crop Generating Facility | Lasalle | Battery | 50 | 2020-03-26 | System Impact Study | ComEd | Current status |
| Twin Groves Storage I | Mclean | Battery | 50 | 2020-03-27 | IA Executed | ComEd | Current status |
| Top Crop Generating Facility | Lasalle | Battery | 50 | 2020-03-30 | System Impact Study | ComEd | Current status |
| Twin Groves Storage II | Mclean | Battery | 50 | 2020-03-31 | IA Executed | ComEd | Current status |
| AG2-061 | Lasalle | Battery | 50 | 2025-03-14 | System Impact Study | ComEd | Current status |
| AH2-197 | Mchenry | Solar+Battery | 50 | 2022-03-08 | Feasibility Study | ComEd | Current status |
| AI2-151 | Logan | Solar | 48 | 2023-02-28 | Feasibility Study | ComEd | Current status |
| AI2-417 | Dekalb | Solar | 48 | 2023-03-02 | Feasibility Study | ComEd | Current status |
| J2312 | Putnam | Wind | 48 | 2024-10-18 | Cluster Study | AMEREN ILLINOIS | Current status |
| J1882 | Tazewell | Battery | 45 | 2022-03-28 | Cluster Study | AMEREN ILLINOIS | Current status |
| J1201 | Montgomery | Solar+Battery | 44 | 2019-04-25 | IA Executed | AMEREN ILLINOIS | Current status |
| AI2-060 | Henry | Solar | 41 | 2023-02-23 | Feasibility Study | ComEd | Current status |
| J3818 | Shelby | Solar | 40 | 2024-06-07 | In Progress (unknown study) | AMEREN ILLINOIS | Current status |
| Surplus; J1102 | Logan | Other+Battery | 40 | 2023-10-30 | AMEREN ILLINOIS | Current status | |
| Rochelle Solar | Ogle | Solar | 40 | 2017-04-06 | IA Executed | ComEd | Current status |
| AI2-007 | Kane | Battery | 40 | 2022-11-10 | Feasibility Study | ComEd | Current status |
| AH1-718 | Lee | Gas | 38 | 2025-04-07 | System Impact Study | ComEd | Current status |
| AI2-014 | Kankakee | Solar | 38 | 2022-11-30 | Feasibility Study | ComEd | Current status |
| J2982 | Warren | Solar | 35 | 2022-09-14 | Cluster Study | AMEREN ILLINOIS | Current status |
| J3188 | Marshall | Solar | 35 | 2022-09-14 | Cluster Study | AMEREN ILLINOIS | Current status |
| J2908 | Morgan | Solar | 30 | 2022-07-27 | Cluster Study | AMEREN ILLINOIS | Current status |
| Black Diamond Solar | Christian | Battery | 30 | 2020-09-30 | System Impact Study | ComEd | Current status |
| AI1-119 | Kendall | Solar | 29 | 2022-09-06 | Feasibility Study | ComEd | Current status |
| AI2-410 | Dekalb | Solar | 29 | 2023-03-02 | Feasibility Study | ComEd | Current status |
| AI2-400 | Bureau | Wind | 25 | 2023-03-02 | Feasibility Study | ComEd | Current status |
| J1200 | Putnam | Solar+Battery | 24 | 2019-04-25 | IA Executed | AMEREN ILLINOIS | Current status |
| AI2-013 | Grundy | Solar | 24 | 2022-11-30 | Feasibility Study | ComEd | Current status |
| AI2-135 | Mclean | Solar | 24 | 2023-02-28 | Feasibility Study | ComEd | Current status |
| J3993 | Wayne | Solar | 21 | 2025-04-29 | MISO | Current status | |
| J4010 | Dewitt | Nuclear | 21 | 2025-04-30 | AMEREN ILLINOIS | Current status | |
| J1199 | Fulton | Solar+Battery | 20 | 2019-04-25 | IA Executed | AMEREN ILLINOIS | Current status |
| Staley Solar | Kankakee | Solar | 20 | 2018-02-21 | IA Executed | ComEd | Current status |
| Rochelle Solar | Ogle | Solar | 20 | 2019-09-30 | IA Executed | ComEd | Current status |
| Calumet BESS | Cook | Battery | 20 | 2019-10-28 | IA Executed | ComEd | Current status |
| Kincaid PV | Christian | Solar | 20 | 2019-10-28 | IA Executed | ComEd | Current status |
| Wilmington Solar Energy Project | Will | Solar+Battery | 20 | 2020-09-30 | IA Executed | ComEd | Current status |
| AI2-403 | Dekalb | Solar | 20 | 2023-03-02 | Feasibility Study | ComEd | Current status |
| AI1-173 | Stephenson | Solar | 16 | 2022-09-10 | Feasibility Study | ComEd | Current status |
| AI1-077 | Mchenry | Solar | 16 | 2022-07-15 | Feasibility Study | ComEd | Current status |
| J2189 | Mcdonough | Wind | 16 | 2021-08-17 | Cluster Study | AMEREN ILLINOIS | Current status |
| AH2-205 | Cook | Battery | 10 | 2022-03-09 | Feasibility Study | ComEd | Current status |
| AH2-206 | Cook | Battery | 10 | 2022-03-09 | Feasibility Study | ComEd | Current status |
| AH1-567 | Will | Gas | 5 | 2025-03-05 | System Impact Study | ComEd | Current status |
Lawrence Berkeley National Laboratory and GridTracker · Queued Up: Interconnection Queue Data File (Lawrence Berkeley National Laboratory) · data for 2025 · as of May 7, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0 May be out of date. The next release was due by May 7, 2027. Last checked for an update: Oct 31, 2026.