Interconnection queue in California
Data: Lawrence Berkeley National Laboratory and GridTracker, Queued Up, as of Dec 31, 2025.
This is an annual snapshot. A request's status may have changed since. Current status at Interconnection.fyi.
LBNL licenses the file CC BY 4.0, so project rows are shown and the file can be downloaded from our data library.
Statewide
- Active capacity
- 130,576 MW
- Active requests
- 460
- Median years in queue (active)
- 4.7
- Withdrawn, of requests entered by 2020
- 78%
| Type | Active capacity (MW) | Projects |
|---|---|---|
| Solar | 5,524 | 21 |
| Wind | 2,281 | 11 |
| Storage | 53,570 | 196 |
| Gas | 691 | 2 |
| Hybrid | 65,651 | 217 |
| Other | 2,859 | 13 |
By county
| County | Active capacity (MW) | Projects | Solar | Wind | Storage | Gas | Hybrid | Other | Median years in queue (active) | Withdrawn, of requests entered by 2020 |
|---|---|---|---|---|---|---|---|---|---|---|
| Kern | 18,732 | 72 | 2,376 | 100 | 3,575 | 656 | 12,025 | 5.7 | 74% of 369 | |
| Los Angeles | 18,636 | 42 | 9,477 | 8,813 | 346 | 4.7 | 81% of 116 | |||
| San Bernardino | 15,968 | 45 | 964 | 9,453 | 5,550 | 2.7 | 84% of 149 | |||
| Fresno | 13,581 | 43 | 2,289 | 11,292 | 4.7 | 84% of 188 | ||||
| Riverside | 9,968 | 30 | 1,044 | 3,014 | 4,529 | 1,380 | 4.7 | 75% of 124 | ||
| Imperial | 7,462 | 37 | 150 | 1,745 | 35 | 5,107 | 425 | 3.3 | 72% of 53 | |
| Kings | 5,373 | 15 | 5,373 | 4.7 | 71% of 83 | |||||
| Merced | 4,325 | 18 | 80 | 1,077 | 3,167 | 4.7 | 78% of 40 | |||
| San Diego | 3,749 | 23 | 400 | 3,006 | 343 | 5.7 | 79% of 171 | |||
| San Joaquin | 3,606 | 14 | 2,695 | 912 | 4.7 | 79% of 47 | ||||
| Sacramento | 3,589 | 15 | 1,114 | 1,825 | 650 | 3.5 | ||||
| Monterey | 2,637 | 4 | 1,112 | 1,525 | 4.7 | |||||
| Alameda | 2,288 | 12 | 266 | 1,921 | 101 | 6.2 | 71% of 42 | |||
| Contra Costa | 2,276 | 6 | 2,276 | 4.7 | 77% of 39 | |||||
| Solano | 2,146 | 10 | 200 | 1,830 | 116 | 4.7 | 77% of 35 | |||
| Orange | 2,117 | 7 | 2,117 | 4.7 | ||||||
| Tulare | 1,970 | 9 | 162 | 1,808 | 4.7 | 65% of 31 | ||||
| Ventura | 1,926 | 4 | 1,926 | 5.2 | ||||||
| Santa Clara | 1,337 | 9 | 1,217 | 120 | 6.7 | |||||
| Stanislaus | 1,041 | 5 | 468 | 573 | 4.7 | 81% of 21 | ||||
| San Luis Obispo | 1,029 | 1 | 1,029 | 5.7 | 74% of 35 | |||||
| Colusa | 972 | 5 | 219 | 753 | 7.7 | |||||
| Madera | 956 | 5 | 753 | 203 | 4.7 | 85% of 20 | ||||
| Calaveras | 949 | 4 | 949 | 2.7 | ||||||
| Inyo | 759 | 2 | 759 | 5.2 | ||||||
| Lassen | 550 | 2 | 550 | 1.9 | ||||||
| Sutter | 515 | 3 | 414 | 101 | 4.7 | |||||
| Butte | 400 | 2 | 400 | 4.4 | ||||||
| San Mateo | 351 | 2 | 351 | 4.7 | ||||||
| Shasta | 331 | 2 | 206 | 125 | 5.9 | |||||
| San Francisco | 250 | 1 | 250 | 6.7 | ||||||
| Santa Cruz | 204 | 1 | 204 | 4.7 | ||||||
| Sonoma | 175 | 2 | 122 | 53 | 4.7 | |||||
| Siskiyou | 150 | 1 | 150 | 0.3 | ||||||
| San Benito | 112 | 1 | 112 | 4.7 | ||||||
| Yolo | 85 | 1 | 85 | 5.7 | ||||||
| Modoc | 25 | 1 | 25 | 0.3 | ||||||
| Napa | 25 | 1 | 25 | 6.7 | ||||||
| Lake | 9 | 1 | 9 | 20.3 | ||||||
| Tehama | 5 | 2 | 5 | 13.7 | ||||||
| Placer | 0 | 0 | ||||||||
| El Dorado | 0 | 0 | ||||||||
| Humboldt | 0 | 0 | ||||||||
| Mendocino | 0 | 0 | ||||||||
| Tuolumne | 0 | 0 | ||||||||
| Santa Barbara | 0 | 0 | ||||||||
| Plumas | 0 | 0 | ||||||||
| County not given | 0 | 0 | ||||||||
| Mariposa | 0 | 0 | ||||||||
| Yuba | 0 | 0 | ||||||||
| Marin | 0 | 0 | ||||||||
| San Clara | 0 | 0 | ||||||||
| Tecate Baja California Mexico | 0 | 0 | ||||||||
| Glenn | 0 | 0 | ||||||||
| Amador | 0 | 0 | ||||||||
| Mono | 0 | 0 | ||||||||
| Maricopa | 0 | 0 | ||||||||
| Rosamond | 0 | 0 |
Capacity is each request's first-listed capacity, so a hybrid's battery is not added on top. Most requests in a queue never get built.
Active requests
Status is as of Dec 31, 2025. Current status at Interconnection.fyi.
| Project | County | Type | MW | Entered the queue | Study phase | Utility or operator | Live status |
|---|---|---|---|---|---|---|---|
| Q92 | San Bernardino | Solar+Battery | 1,650 | 2022-06-20 | In Progress (unknown study) | Los Angeles Department of Water and Power | Current status |
| HOLMAN | Monterey | Wind+Battery | 1,525 | 2021-04-15 | IA Executed | PGAE | Current status |
| Q98 | Los Angeles | Solar+Battery | 1,500 | 2023-03-02 | In Progress (unknown study) | Los Angeles Department of Water and Power | Current status |
| Q572 | Riverside | Other | 1,300 | 2024-05-15 | Cluster Study | Arizona Public Service | Current status |
| Q68 | Los Angeles | Solar+Battery | 1,200 | 2019-03-26 | Facility Study | Los Angeles Department of Water and Power | Current status |
| DARDEN | Fresno | Solar+Battery | 1,182 | 2021-04-15 | IA Executed | PGAE | Current status |
| UMBRIEL | Imperial | Solar+Battery | 1,182 | 2021-04-15 | IA Executed | SDGE | Current status |
| WINGTIP SOLAR 1 | Merced | Solar+Battery | 1,176 | 2021-04-15 | IA Executed | PGAE | Current status |
| Muon | Fresno | Solar+Battery | 1,170 | 2023-04-17 | Not Started | PGAE | Current status |
| Pion | Fresno | Battery | 1,168 | 2023-04-17 | Not Started | PG&E | Current status |
| ANGELENO SOLAR FARM | Los Angeles | Solar+Battery | 1,150 | 2019-04-15 | IA Executed | SCE | Current status |
| Hillside Energy Storage | Los Angeles | Battery | 1,065 | 2023-04-17 | Not Started | SCE | Current status |
| PLUM | Kings | Solar+Battery | 1,040 | 2021-04-15 | System Impact Study | PGAE | Current status |
| Crusade | Orange | Battery | 1,029 | 2023-04-17 | Not Started | SCE | Current status |
| Lagoonez | Los Angeles | Battery | 1,029 | 2023-04-17 | Not Started | SCE | Current status |
| WINDWALKER OFFSHORE | San Luis Obispo | Offshore Wind | 1,029 | 2020-04-15 | IA Executed | PGAE | Current status |
| Q100 | Los Angeles | Wind+Battery | 1,000 | 2023-04-14 | In Progress (unknown study) | Los Angeles Department of Water and Power | Current status |
| Q101 | Los Angeles | Wind+Battery | 1,000 | 2023-04-14 | In Progress (unknown study) | Los Angeles Department of Water and Power | Current status |
| Q112 | San Bernardino | Battery | 1,000 | 2024-10-10 | In Progress (unknown study) | Los Angeles Department of Water and Power | Current status |
| Q96 | Los Angeles | Solar+Battery | 1,000 | 2023-03-02 | In Progress (unknown study) | Los Angeles Department of Water and Power | Current status |
| Q97 | Los Angeles | Solar+Battery | 1,000 | 2023-03-02 | In Progress (unknown study) | Los Angeles Department of Water and Power | Current status |
| Ripple | Kings | Solar+Battery | 946 | 2023-04-17 | Not Started | PGAE | Current status |
| Quark | Fresno | Solar+Battery | 869 | 2023-04-17 | Not Started | PGAE | Current status |
| BUTTONBUSH SOLAR HYBRID ENERGY CENTER | Kern | Solar+Battery | 818 | 2019-04-15 | IA Executed | PGAE | Current status |
| Broadview | Fresno | Solar+Battery | 816 | 2023-04-17 | Not Started | WAPA | Current status |
| GI-2022-164 | Imperial | Solar+Battery | 800 | 2022-11-30 | In Progress (unknown study) | Imperial Irrigation District | Current status |
| 2023-G1 | Fresno | Solar+Battery | 800 | 2023-03-01 | In Progress (unknown study) | WAPA Sierra Nevada | Current status |
| 2023-G2 | Fresno | Solar+Battery | 800 | 2023-03-01 | In Progress (unknown study) | WAPA Sierra Nevada | Current status |
| IRVING STORAGE | Monterey | Battery | 783 | 2019-05-07 | IA Executed | PGAE | Current status |
| SANBORN HYBRID 3 | Kern | Solar+Battery | 765 | 2019-04-15 | IA Executed | SCE | Current status |
| Sunflower | San Bernardino | Solar+Battery | 715 | 2023-04-17 | Not Started | SCE | Current status |
| MENIFEE POWER BANK | Riverside | Battery | 680 | 2019-04-15 | IA Executed | SCE | Current status |
| STEEL CITY BATTERY STORAGE | Contra Costa | Battery | 675 | 2020-04-15 | IA Executed | PGAE | Current status |
| SUNRISE POWER IMPROVEMENT | Kern | Gas | 656 | 2020-04-15 | System Impact Study | PGAE | Current status |
| YUHA DESERT BATTERY STORAGE | Imperial | Battery | 633 | 2021-04-15 | System Impact Study | SDGE | Current status |
| EUISMOD | Kern | Solar+Battery | 623 | 2021-04-15 | IA Executed | SCE | Current status |
| Sunvine | Kern | Solar+Battery | 614 | 2023-04-17 | Not Started | SCE | Current status |
| Solstice B | Fresno | Solar+Battery | 606 | 2023-04-17 | Not Started | PG&E | Current status |
| SILVER RIDGE MOUNT SIGNAL | Imperial | Solar+Battery | 600 | 2006-08-22 | IA Executed | SDGE | Current status |
| Aviation | San Bernardino | Gas+Battery | 600 | 2023-04-17 | Not Started | SCE | Current status |
| CPC WEST | Kern | Wind+Battery | 600 | 2006-03-01 | IA Executed | SCE | Current status |
| Soledad Solar | Kern | Solar | 562 | 2023-04-17 | Not Started | SCE | Current status |
| SANBORN 5 HYBRID | Kern | Solar | 560 | 2020-04-15 | IA Executed | SCE | Current status |
| Solstice A | Fresno | Solar+Battery | 556 | 2023-04-17 | Not Started | PG&E | Current status |
| 20 | Sacramento | Solar+Battery | 550 | 2022-07-07 | Facility Study | Sacramento Municipal Utility District | Current status |
| SAGEBRUSH ENERGY STORAGE | Kern | Battery | 528 | 2021-04-15 | System Impact Study | SCE | Current status |
| Musketeers | Tulare | Solar+Battery | 524 | 2023-04-17 | Not Started | SCE | Current status |
| Summit Valley Energy Storage | San Bernardino | Battery | 519 | 2023-04-17 | Not Started | SCE | Current status |
| OBERON | Riverside | Solar+Battery | 518 | 2019-04-15 | IA Executed | SCE | Current status |
| Lupine Energy Center | San Bernardino | Battery | 518 | 2023-04-17 | Not Started | SCE | Current status |
| Chronos Energy Storage | San Bernardino | Other Storage | 517 | 2023-04-17 | Not Started | SCE | Current status |
| ALTA CASA STORAGE | San Joaquin | Battery | 515 | 2021-04-15 | IA Executed | PGAE | Current status |
| Yacht Rock | San Bernardino | Battery | 514 | 2023-04-17 | Not Started | SCE | Current status |
| Dove Cove | San Joaquin | Battery | 514 | 2023-04-17 | Not Started | PGAE | Current status |
| Belterra Energy Storage | Calaveras | Battery | 514 | 2023-04-17 | Not Started | PGAE | Current status |
| Fontus | San Bernardino | Battery | 514 | 2023-04-17 | Not Started | SCE | Current status |
| DESCENDANT RANCH 1 | Colusa | Solar+Battery | 514 | 2018-04-16 | IA Executed | PGAE | Current status |
| GREASEWOOD ENERGY STORAGE | Kern | Battery | 513 | 2021-04-15 | IA Executed | SCE | Current status |
| CONDUIT ENERGY STORAGE | San Bernardino | Battery | 513 | 2021-04-15 | IA Executed | SCE | Current status |
| WILLOW ROCK ENERGY STORAGE | Kern | Other+Battery | 512 | 2020-04-15 | IA Executed | SCE | Current status |
| ROSA STORAGE | Ventura | Battery | 512 | 2021-04-15 | System Impact Study | SCE | Current status |
| GRACE ENERGY CENTER | Riverside | Solar+Battery | 509 | 2020-04-15 | IA Executed | SCE | Current status |
| SUNBAKED SOLAR | Inyo | Solar+Battery | 509 | 2021-04-15 | IA Executed | GLW | Current status |
| LOCK STORAGE | Fresno | Battery | 508 | 2021-04-15 | IA Executed | PGAE | Current status |
| DOUBLE BUTTE STORAGE | Riverside | Battery | 508 | 2019-04-15 | IA Executed | SCE | Current status |
| Torbino Solar | Kern | Solar | 507 | 2023-04-17 | Not Started | SCE | Current status |
| Galicia Storage | San Bernardino | Battery | 506 | 2023-04-17 | Not Started | SCE | Current status |
| Ambar Energy Storage | San Bernardino | Battery | 505 | 2023-04-17 | Not Started | SCE | Current status |
| DRIFTER ENERGY STORAGE | Ventura | Battery | 505 | 2021-04-15 | IA Executed | SCE | Current status |
| DELILAH ENERGY STORAGE | Contra Costa | Battery | 504 | 2021-04-15 | IA Executed | PGAE | Current status |
| SPECTRUM ENERGY STORAGE | Alameda | Battery | 504 | 2021-04-15 | IA Executed | PGAE | Current status |
| GOLDBACK SOLAR CENTER | Ventura | Battery | 500 | 2019-04-15 | IA Executed | SCE | Current status |
| LAKE ELSINORE ADVANCED PUMPED STORAGE PROJECT | Riverside | Other Storage | 500 | 2005-06-21 | IA Executed | SDGE | Current status |
| GI-2023-167 | Imperial | Solar+Battery | 500 | 2023-02-07 | In Progress (unknown study) | Imperial Irrigation District | Current status |
| Q108 | San Bernardino | Battery | 500 | 2024-06-19 | In Progress (unknown study) | Los Angeles Department of Water and Power | Current status |
| Q78 | Kern | Other Storage | 500 | 2020-10-02 | In Progress (unknown study) | Los Angeles Department of Water and Power | Current status |
| Q84 | San Bernardino | Battery | 500 | 2021-10-18 | In Progress (unknown study) | Los Angeles Department of Water and Power | Current status |
| BELLEFIELD SOLAR FARM | Kern | Solar+Battery | 500 | 2018-04-16 | IA Executed | SCE | Current status |
| PELICANS JAW HYBRID SOLAR | Kings | Solar+Battery | 500 | 2019-04-15 | IA Executed | PGAE | Current status |
| BELLEFIELD 2 SOLAR FARM | Kern | Solar+Battery | 500 | 2019-04-15 | IA Executed | SCE | Current status |
| CORBY 2 | Solano | Battery | 476 | 2021-04-15 | System Impact Study | PGAE | Current status |
| SOLSKEN | Tulare | Solar+Battery | 464 | 2021-04-15 | System Impact Study | SCE | Current status |
| Shoals Energy Storage 2 | Los Angeles | Battery | 461 | 2023-04-17 | Not Started | SCE | Current status |
| ATHOS POWER PLANT | Riverside | Solar+Battery | 458 | 2017-05-01 | IA Executed | SCE | Current status |
| INVICTUS | Riverside | Solar+Battery | 430 | 2021-04-15 | System Impact Study | SCE | Current status |
| ANTELOPE SOLAR 2 | Los Angeles | Solar+Battery | 423 | 2015-04-30 | IA Executed | SCE | Current status |
| Amanece | Stanislaus | Solar+Battery | 419 | 2023-04-17 | Not Started | PGAE | Current status |
| TOLENAS | Solano | Battery | 417 | 2021-04-15 | System Impact Study | PGAE | Current status |
| Carissalito Creek | Merced | Solar+Battery | 416 | 2023-04-17 | Not Started | PGAE | Current status |
| Whiskey Diggings | Sutter | Solar | 414 | 2023-04-17 | Not Started | PGAE | Current status |
| ARTEMIS | Kern | Solar+Battery | 412 | 2021-04-15 | System Impact Study | PGAE | Current status |
| DOS PALMAS | San Bernardino | Battery | 411 | 2021-04-15 | IA Executed | SCE | Current status |
| POTENTIA-VIRIDI | San Joaquin | Solar+Wind+Battery | 410 | 2020-04-15 | IA Executed | PGAE | Current status |
| VALLEY SUNLIGHT REFINERY | Kings | Solar+Battery | 410 | 2021-04-15 | System Impact Study | PGAE | Current status |
| SHOALS ENERGY STORAGE | Ventura | Battery | 409 | 2020-04-15 | IA Executed | SCE | Current status |
| HIDALGO ENERGY STORAGE | San Bernardino | Battery | 408 | 2021-04-15 | IA Executed | SCE | Current status |
| Maravillosa 2 | Kern | Solar+Battery | 407 | 2023-04-17 | Not Started | PGAE | Current status |
| GABRIEL STORAGE | Los Angeles | Battery | 406 | 2021-04-15 | IA Executed | SCE | Current status |
| SIMON | Los Angeles | Battery | 406 | 2021-04-15 | System Impact Study | SCE | Current status |
| TROLLEY | San Bernardino | Battery | 406 | 2021-04-15 | IA Executed | SCE | Current status |
| CORAL REEF | Los Angeles | Battery | 406 | 2021-04-15 | System Impact Study | SCE | Current status |
| FLEETWOOD | Los Angeles | Battery | 406 | 2021-04-15 | System Impact Study | SCE | Current status |
| MARICI | Los Angeles | Battery | 406 | 2021-04-15 | IA Executed | SCE | Current status |
| MATTERHORN | Riverside | Solar+Wind+Battery | 405 | 2023-04-17 | Not Started | SCE | Current status |
| Tea Leaf Energy Storage | Alameda | Battery | 404 | 2023-04-17 | Not Started | PGAE | Current status |
| DIRAC | San Bernardino | Battery | 403 | 2021-04-15 | In Progress (unknown study) | SCE | Current status |
| MOUNT LAGUNA WIND 2 | San Diego | Wind | 400 | 2017-05-01 | IA Executed | SDGE | Current status |
| BRUSHY | Solano | Battery | 400 | 2021-04-15 | System Impact Study | PGAE | Current status |
| SC1Q31 | Sacramento | Other | 400 | 2025-07-14 | Cluster Study | Sacramento Municipal Utility District | Current status |
| SCARLET | Fresno | Solar+Battery | 400 | 2015-04-30 | IA Executed | PGAE | Current status |
| CALYPSO SOLAR | Riverside | Solar+Battery | 400 | 2019-04-15 | IA Executed | SCE | Current status |
| LYCAN SOLAR | Riverside | Solar+Battery | 400 | 2019-04-15 | IA Executed | SCE | Current status |
| Q76 | Kern | Solar+Battery | 400 | 2020-03-11 | System Impact Study | Los Angeles Department of Water and Power | Current status |
| GI-2023-168 | Imperial | Battery | 387 | 2023-04-04 | In Progress (unknown study) | Imperial Irrigation District | Current status |
| Stable | Fresno | Solar+Battery | 377 | 2023-04-17 | Not Started | PG&E | Current status |
| SOLEIL CANTIL | Kern | Solar+Battery | 372 | 2021-04-15 | System Impact Study | SCE | Current status |
| Sunglow | Kings | Solar+Battery | 372 | 2023-04-17 | Not Started | PG&E | Current status |
| East Wonder | Kern | Solar+Battery | 367 | 2023-04-17 | Not Started | PGAE | Current status |
| GOLDEN FLATS | Stanislaus | Battery | 365 | 2021-04-15 | IA Executed | PGAE | Current status |
| NORTHEAST CENTRAL VALLEY | San Joaquin | Battery | 365 | 2021-04-15 | System Impact Study | PGAE | Current status |
| ESPRESSO | Alameda | Battery | 365 | 2021-04-15 | IA Executed | PGAE | Current status |
| KINGSLEY SOLAR FARM | Imperial | Solar+Battery | 360 | 2019-04-15 | IA Executed | SDGE | Current status |
| BUTTONBUSH SOLAR 2 | Kern | Solar+Battery | 358 | 2021-04-15 | IA Executed | PGAE | Current status |
| PRESIDIO | San Joaquin | Solar+Battery | 357 | 2021-04-15 | IA Executed | PGAE | Current status |
| JEWELFLOWER STORAGE | Santa Clara | Battery | 355 | 2019-04-15 | IA Executed | PGAE | Current status |
| ALLEGHENY ENERGY STORAGE | Contra Costa | Battery | 353 | 2021-04-15 | IA Executed | PGAE | Current status |
| Bajada | Riverside | Solar | 353 | 2023-04-17 | Not Started | SCE | Current status |
| Moonraker | Kern | Battery | 353 | 2023-04-17 | Not Started | SCE | Current status |
| Zama | Kern | Battery | 353 | 2023-04-17 | Not Started | SCE | Current status |
| Argos Solar | San Bernardino | Solar | 352 | 2023-04-17 | Not Started | SCE | Current status |
| Q80 | Kern | Solar+Battery | 350 | 2021-04-07 | In Progress (unknown study) | Los Angeles Department of Water and Power | Current status |
| Q91 | Los Angeles | Hydrogen | 346 | 2022-06-16 | In Progress (unknown study) | Los Angeles Department of Water and Power | Current status |
| 8 | Sacramento | Solar+Battery | 344 | 2021-01-25 | Facility Study | Sacramento Municipal Utility District | Current status |
| SANBORN SOLAR 2 | Kern | Solar+Battery | 334 | 2018-04-16 | IA Executed | SCE | Current status |
| BIG SKY SOLAR | Los Angeles | Solar+Battery | 320 | 2011-03-31 | IA Executed | SCE | Current status |
| Galadriel | Madera | Battery | 318 | 2023-04-17 | Not Started | PGAE | Current status |
| DAGGETT SOLAR 3 | San Bernardino | Solar+Battery | 314 | 2016-05-02 | IA Executed | SCE | Current status |
| CORBY | Solano | Battery | 314 | 2016-05-02 | IA Executed | PGAE | Current status |
| ROADHOUSE STORAGE | San Bernardino | Battery | 313 | 2020-04-15 | IA Executed | SCE | Current status |
| EAST FIELD ENERGY STORAGE | San Diego | Battery | 313 | 2020-04-15 | IA Executed | SDGE | Current status |
| HAVEN STORAGE | Los Angeles | Battery | 313 | 2021-04-15 | IA Executed | SCE | Current status |
| BELL BLUFF STORAGE | San Diego | Battery | 313 | 2021-04-15 | System Impact Study | SDGE | Current status |
| CARGO STORAGE | San Diego | Battery | 313 | 2021-04-15 | System Impact Study | SDGE | Current status |
| CADY SOLAR | San Bernardino | Solar+Battery | 313 | 2021-04-15 | IA Executed | SCE | Current status |
| DAYLIGHT | Kings | Solar+Battery | 311 | 2016-05-02 | IA Executed | PGAE | Current status |
| CHERRY LANE HYBRID | Kern | Solar+Battery | 311 | 2021-04-15 | System Impact Study | PGAE | Current status |
| KEY STORAGE 1 | Fresno | Battery | 309 | 2018-04-16 | IA Executed | PGAE | Current status |
| HARMONY STORAGE 2 | Contra Costa | Battery | 308 | 2021-04-15 | System Impact Study | PGAE | Current status |
| MidBishop | Kings | Solar+Battery | 308 | 2023-04-17 | Not Started | PGAE | Current status |
| Jackrabbit Power Bank | Santa Clara | Battery | 308 | 2023-04-17 | Not Started | PGAE | Current status |
| AUSTRALIS | Merced | Solar+Battery | 307 | 2021-04-15 | IA Executed | PGAE | Current status |
| Green Palms | Riverside | Solar | 307 | 2023-04-17 | Not Started | SCE | Current status |
| Blue Star | Kings | Solar+Battery | 306 | 2023-04-17 | Not Started | PGAE | Current status |
| HUMIDOR STORAGE 1 | Los Angeles | Battery | 305 | 2019-04-15 | IA Executed | SCE | Current status |
| Maestro | Fresno | Solar+Battery | 305 | 2023-04-17 | Not Started | PGAE | Current status |
| Gosford Solar Storage | Kern | Solar | 305 | 2023-04-17 | Not Started | PGAE | Current status |
| GNARLY OSAGE | San Diego | Battery | 304 | 2021-04-15 | System Impact Study | SDGE | Current status |
| Twinkle | San Bernardino | Battery | 304 | 2023-04-17 | Not Started | SCE | Current status |
| Brown Bear | Kings | Solar+Battery | 304 | 2023-04-17 | Not Started | PGAE | Current status |
| CORNUCOPIA HYBRID | Fresno | Solar+Battery | 304 | 2021-04-15 | IA Executed | PGAE | Current status |
| ELION ENERGY STORAGE | Los Angeles | Battery | 302 | 2021-04-15 | IA Executed | SCE | Current status |
| TABLA ENERGY STORAGE | Los Angeles | Battery | 302 | 2021-04-15 | IA Executed | SCE | Current status |
| TYRELL ENERGY STORAGE | Orange | Battery | 302 | 2021-04-15 | IA Executed | SCE | Current status |
| NIGHTHAWK STORAGE | San Diego | Battery | 300 | 2019-04-15 | IA Executed | SDGE | Current status |
| DESERT SANDS | Riverside | Battery | 300 | 2020-04-15 | IA Executed | SCE | Current status |
| ELECTRON | Los Angeles | Battery | 300 | 2021-04-15 | IA Executed | SCE | Current status |
| Q06 | San Bernardino | Solar | 300 | 2008-03-12 | IA Executed | Los Angeles Department of Water and Power | Current status |
| Q107 | Kern | Battery | 300 | 2024-05-17 | In Progress (unknown study) | Los Angeles Department of Water and Power | Current status |
| Q82 | Los Angeles | Battery | 300 | 2021-07-29 | In Progress (unknown study) | Los Angeles Department of Water and Power | Current status |
| 25-00381 | Lassen | Solar | 300 | 2025-07-30 | In Progress (unknown study) | NV Energy | Current status |
| 2019-G1 | Butte | Solar+Battery | 300 | 2019-08-08 | Facility Study | WAPA Sierra Nevada | Current status |
| Duran | San Bernardino | Gas+Battery | 300 | 2023-04-17 | Not Started | SCE | Current status |
| ROSAMOND WEST SOLAR | Kern | Solar+Battery | 300 | 2009-07-31 | IA Executed | SCE | Current status |
| CARMINE | Riverside | Battery | 292 | 2021-04-15 | System Impact Study | SCE | Current status |
| EASLEY | Riverside | Solar+Battery | 290 | 2021-04-15 | IA Executed | SCE | Current status |
| TWIN PALMS SOLAR | Riverside | Solar+Battery | 288 | 2021-04-15 | IA Executed | SCE | Current status |
| Sienna 3 | San Bernardino | Solar+Battery | 288 | 2023-04-17 | Not Started | SCE | Current status |
| 26 | Sacramento | Solar+Battery | 275 | 2022-09-22 | Facility Study | Sacramento Municipal Utility District | Current status |
| REDONDA | Riverside | Solar+Battery | 273 | 2021-04-15 | IA Executed | SCE | Current status |
| GI-2022-162 | Imperial | Solar+Battery | 270 | 2022-09-08 | In Progress (unknown study) | Imperial Irrigation District | Current status |
| PATHFINDER STORAGE | San Joaquin | Battery | 268 | 2021-04-15 | IA Executed | PGAE | Current status |
| OCOTILLO EXPRESS | Imperial | Wind+Battery | 265 | 2009-07-31 | IA Executed | SDGE | Current status |
| J90 ENERGY STORAGE | Los Angeles | Battery | 261 | 2021-04-15 | IA Executed | SCE | Current status |
| Fika | Merced | Battery | 258 | 2023-04-17 | Not Started | PGAE | Current status |
| Zeitgeist K Energy Center | San Joaquin | Battery | 258 | 2023-04-17 | Not Started | PGAE | Current status |
| Annapurna | Merced | Battery | 257 | 2023-04-17 | Not Started | PGAE | Current status |
| CAPTIVA ENERGY STORAGE | Orange | Battery | 257 | 2020-04-15 | IA Executed | SDGE | Current status |
| COBALT | Riverside | Solar+Battery | 256 | 2020-04-15 | IA Executed | SCE | Current status |
| SHERMAN ENERGY STORAGE | Contra Costa | Battery | 256 | 2021-04-15 | System Impact Study | PGAE | Current status |
| ALMANDE ENERGY STORAGE | Merced | Battery | 256 | 2021-04-15 | System Impact Study | PGAE | Current status |
| COMMERCE ENERGY STORAGE 3 | Los Angeles | Battery | 256 | 2021-04-15 | IA Executed | SCE | Current status |
| GATEWAY ENERGY STORAGE 2 | San Diego | Battery | 256 | 2021-04-15 | System Impact Study | SDGE | Current status |
| SANDBAR ENERGY STORAGE | San Diego | Battery | 256 | 2021-04-15 | System Impact Study | SDGE | Current status |
| Bolt | Fresno | Solar+Battery | 255 | 2023-04-17 | Not Started | PG&E | Current status |
| SANDRIFT STORAGE 1 | Riverside | Battery | 255 | 2021-04-15 | IA Executed | SCE | Current status |
| SANDRIFT STORAGE 2 | Riverside | Battery | 255 | 2021-04-15 | IA Executed | SCE | Current status |
| PLUOT | Kings | Solar+Battery | 254 | 2016-05-02 | IA Executed | PGAE | Current status |
| POMEGRANATE | Kings | Solar+Battery | 254 | 2016-05-02 | IA Executed | PGAE | Current status |
| ZORIN STORAGE | Alameda | Battery | 252 | 2021-04-15 | IA Executed | PGAE | Current status |
| GREENWOOD ENERGY STORAGE | Los Angeles | Battery | 252 | 2021-04-15 | IA Executed | SCE | Current status |
| CORMORANT STORAGE | San Francisco | Battery | 250 | 2019-04-15 | IA Executed | PGAE | Current status |
| COMMERCE ENERGY STORAGE | Los Angeles | Battery | 250 | 2019-04-15 | IA Executed | SCE | Current status |
| COMMERCE ENERGY STORAGE 2 | Los Angeles | Battery | 250 | 2020-04-15 | System Impact Study | SCE | Current status |
| BAYLANDS BATTERY | San Mateo | Battery | 250 | 2021-04-15 | IA Executed | PGAE | Current status |
| Q03 | Kern | Solar | 250 | 2007-09-10 | Construction | Los Angeles Department of Water and Power | Current status |
| Q79 | Kern | Battery | 250 | 2020-10-15 | In Progress (unknown study) | Los Angeles Department of Water and Power | Current status |
| Company NR | Lassen | Solar | 250 | 2022-09-07 | IA Executed | NV Energy | Current status |
| 12 | Sacramento | Solar+Battery | 250 | 2021-05-20 | Facility Study | Sacramento Municipal Utility District | Current status |
| 3 | Sacramento | Solar+Battery | 250 | 2020-02-13 | Facility Study | Sacramento Municipal Utility District | Current status |
| SC1Q33 | Sacramento | Other | 250 | 2025-07-14 | Cluster Study | Sacramento Municipal Utility District | Current status |
| HAWKINS SOLAR HYBRID | Kern | Solar+Battery | 250 | 2020-04-15 | In Progress (unknown study) | PGAE | Current status |
| CALVADA SPRINGS SOLAR | Inyo | Solar+Battery | 250 | 2020-04-15 | IA Executed | GLW | Current status |
| Q89 | Kern | Solar+Battery | 250 | 2022-04-01 | In Progress (unknown study) | Los Angeles Department of Water and Power | Current status |
| Cantus | Merced | Solar+Battery | 250 | 2023-04-17 | Not Started | PGAE | Current status |
| MINERAL KING SOLAR | Tulare | Solar+Battery | 215 | 2021-04-15 | System Impact Study | SCE | Current status |
| WESTON STORAGE | San Bernardino | Battery | 214 | 2021-04-15 | System Impact Study | SCE | Current status |
| DORIAN STORAGE | Los Angeles | Battery | 214 | 2021-04-15 | IA Executed | SCE | Current status |
| ZEUS BESS | San Joaquin | Battery | 214 | 2021-04-15 | IA Executed | PGAE | Current status |
| FRIGATEBIRD STORAGE | San Diego | Battery | 214 | 2021-04-15 | System Impact Study | SDGE | Current status |
| Quaking Aspen | Kern | Solar+Battery | 210 | 2023-04-17 | Not Started | PGAE | Current status |
| DESERT JEWEL STORAGE | San Diego | Battery | 206 | 2021-04-15 | IA Executed | SDGE | Current status |
| Rover | Los Angeles | Battery | 206 | 2023-04-17 | Not Started | SCE | Current status |
| ELYSIAN | Fresno | Solar+Battery | 206 | 2021-04-15 | IA Executed | PGAE | Current status |
| FOUNTAIN WIND | Shasta | Wind | 206 | 2015-04-30 | IA Executed | PGAE | Current status |
| Emerita Energy Storage | Alameda | Battery | 206 | 2023-04-17 | Not Started | PGAE | Current status |
| Helios Grid Reliability | Calaveras | Battery | 205 | 2023-04-17 | Not Started | PGAE | Current status |
| Cabrera Reliability | San Bernardino | Battery | 205 | 2023-04-17 | Not Started | SCE | Current status |
| Mt Baldy Energy Storage 2 | San Bernardino | Battery | 205 | 2023-04-17 | Not Started | SCE | Current status |
| Saguaro Energy Storage | San Bernardino | Battery | 205 | 2023-04-17 | Not Started | SCE | Current status |
| Antlia | Monterey | Battery | 205 | 2023-04-17 | Not Started | PGAE | Current status |
| Solstice C | Fresno | Solar+Battery | 205 | 2023-04-17 | Not Started | PG&E | Current status |
| Solstice D | Fresno | Solar+Battery | 204 | 2023-04-17 | Not Started | PG&E | Current status |
| Maravillosa 1 | Kings | Solar+Battery | 204 | 2023-04-17 | Not Started | PGAE | Current status |
| 16 | Sacramento | Battery | 204 | 2022-01-21 | Facility Study | Sacramento Municipal Utility District | Current status |
| LUNA VALLEY SOLAR | Fresno | Solar+Battery | 204 | 2015-04-30 | IA Executed | PGAE | Current status |
| WINSTON HYBRID PV AND BESS | Kern | Solar+Battery | 204 | 2020-04-15 | IA Executed | PGAE | Current status |
| CLARKSON | Fresno | Solar+Battery | 204 | 2021-04-15 | IA Executed | PGAE | Current status |
| SEAHAWK STORAGE | Santa Cruz | Battery | 204 | 2021-04-15 | IA Executed | PGAE | Current status |
| APACHE STORAGE | Fresno | Battery | 204 | 2021-04-15 | IA Executed | PGAE | Current status |
| COUGAR STORAGE | Merced | Battery | 204 | 2021-04-15 | IA Executed | PGAE | Current status |
| PUMA STORAGE | Madera | Battery | 204 | 2021-04-15 | System Impact Study | PGAE | Current status |
| LOTUS SOLAR 2 | Madera | Solar+Battery | 203 | 2021-04-15 | System Impact Study | PGAE | Current status |
| Brundage Energy Storage | Los Angeles | Battery | 202 | 2023-04-17 | Not Started | SCE | Current status |
| EVEREST ENERGY STORAGE | Kern | Battery | 202 | 2021-04-15 | System Impact Study | PGAE | Current status |
| BIG ROCK SOLAR FARM | Imperial | Battery | 200 | 2015-04-30 | IA Executed | SDGE | Current status |
| TANAGER STORAGE | Santa Clara | Battery | 200 | 2019-04-15 | IA Executed | PGAE | Current status |
| AVOCET STORAGE | Los Angeles | Battery | 200 | 2019-04-15 | IA Executed | SCE | Current status |
| KESTREL STORAGE | Los Angeles | Battery | 200 | 2019-04-15 | IA Executed | SCE | Current status |
| SANDPIPER STORAGE | Orange | Battery | 200 | 2019-04-15 | IA Executed | SDGE | Current status |
| MERLIN STORAGE | Los Angeles | Battery | 200 | 2021-04-15 | System Impact Study | SCE | Current status |
| Q81 | Los Angeles | Battery | 200 | 2021-05-11 | In Progress (unknown study) | Los Angeles Department of Water and Power | Current status |
| 11 | Sacramento | Battery | 200 | 2021-04-08 | Facility Study | Sacramento Municipal Utility District | Current status |
| SC1Q32 | Sacramento | Battery | 200 | 2025-07-14 | Cluster Study | Sacramento Municipal Utility District | Current status |
| ARATINA SOLAR CENTER 1 | San Bernardino | Solar+Battery | 200 | 2015-04-30 | IA Executed | SCE | Current status |
| SIENNA SOLAR FARM | San Bernardino | Solar+Battery | 200 | 2015-04-30 | IA Executed | SCE | Current status |
| SONRISA | Fresno | Solar+Battery | 200 | 2017-05-01 | IA Executed | PGAE | Current status |
| DRIFTWOOD STELLA | Kern | Solar+Battery | 200 | 2017-05-01 | IA Executed | PGAE | Current status |
| ARATINA SOLAR CENTER 2 | Kern | Solar+Battery | 200 | 2019-04-15 | IA Executed | SCE | Current status |
| REXFORD 2 SOLAR FARM | Tulare | Solar+Battery | 200 | 2020-04-15 | IA Executed | SCE | Current status |
| SEQUOIA | Tulare | Solar+Battery | 200 | 2020-04-15 | IA Pending | SCE | Current status |
| GAMAY | Kern | Solar+Battery | 200 | 2023-04-17 | Not Started | PGAE | Current status |
| WRIGHT SOLAR | Merced | Solar+Battery | 200 | 2011-03-31 | IA Executed | PGAE | Current status |
| Conduit Energy Storage 2 | San Bernardino | Battery | 199 | 2023-04-17 | Not Started | SCE | Current status |
| Comstock | San Bernardino | Gas+Battery | 199 | 2023-04-17 | Not Started | SCE | Current status |
| Lycan Solar 2 | Riverside | Solar | 192 | 2023-04-17 | Not Started | SCE | Current status |
| Circinus | Merced | Solar+Battery | 186 | 2023-04-17 | Not Started | PGAE | Current status |
| BLACK DIAMOND ES2 | Contra Costa | Battery | 179 | 2021-04-15 | IA Executed | PGAE | Current status |
| GI-2021-149 | Imperial | Solar+Battery | 175 | 2021-11-17 | System Impact Study | Imperial Irrigation District | Current status |
| ARIELLA SOLAR | Tulare | Solar+Battery | 163 | 2021-04-15 | IA Executed | PGAE | Current status |
| 22 | Sacramento | Battery | 160 | 2022-07-15 | Facility Study | Sacramento Municipal Utility District | Current status |
| 2019-G42 | San Bernardino | Solar+Battery | 160 | 2019-06-27 | WAPA Desert Southwest Region | Current status | |
| SPIKES PEAK SOLAR | Merced | Solar+Battery | 159 | 2021-04-15 | IA Executed | PGAE | Current status |
| GI-2023-174 | Imperial | Geothermal | 157 | 2023-04-28 | In Progress (unknown study) | Imperial Irrigation District | Current status |
| GI-2023-176 | Imperial | Geothermal | 157 | 2023-04-28 | In Progress (unknown study) | Imperial Irrigation District | Current status |
| Hacienda | San Bernardino | Solar | 157 | 2023-04-17 | Not Started | SCE | Current status |
| Cowboy | Colusa | Solar+Battery | 156 | 2023-04-17 | Not Started | PGAE | Current status |
| HEARTLAND 2 | Fresno | Solar+Battery | 156 | 2017-05-01 | IA Executed | PGAE | Current status |
| HEARTLAND 1 | Fresno | Solar+Battery | 156 | 2017-05-01 | IA Executed | PGAE | Current status |
| 30 | Sacramento | Solar+Battery | 156 | 2022-12-12 | Facility Study | Sacramento Municipal Utility District | Current status |
| Argenta | San Bernardino | Solar | 156 | 2023-04-17 | Not Started | SCE | Current status |
| Zinfandel Storage Center | San Joaquin | Battery | 154 | 2023-04-17 | Not Started | PGAE | Current status |
| JUNIPER STORAGE | Los Angeles | Solar+Battery | 154 | 2021-04-15 | System Impact Study | SCE | Current status |
| NORTH ROSAMOND SOLAR | Kern | Solar+Battery | 153 | 2010-07-31 | IA Executed | SCE | Current status |
| BOBOR STORAGE | Tulare | Battery | 152 | 2021-04-15 | System Impact Study | SCE | Current status |
| FLORES STORAGE | Madera | Battery | 152 | 2021-04-15 | System Impact Study | PGAE | Current status |
| SALOON ENERGY STORAGE | Colusa | Battery | 150 | 2018-04-16 | IA Executed | PGAE | Current status |
| GI-2023-170 | Imperial | Solar | 150 | 2023-04-21 | In Progress (unknown study) | Imperial Irrigation District | Current status |
| GI-2023-173 | Imperial | Solar+Battery | 150 | 2023-04-28 | In Progress (unknown study) | Imperial Irrigation District | Current status |
| GI-2023-175 | Imperial | Solar+Battery | 150 | 2023-04-28 | In Progress (unknown study) | Imperial Irrigation District | Current status |
| T2-072 | Siskiyou | Battery | 150 | 2025-09-12 | PacifiCorp | Current status | |
| 27 | Sacramento | Battery | 150 | 2022-10-18 | Facility Study | Sacramento Municipal Utility District | Current status |
| BALDY MESA | San Bernardino | Solar+Battery | 150 | 2017-05-01 | IA Executed | SCE | Current status |
| OVERNIGHT SOLAR | San Bernardino | Solar+Battery | 150 | 2020-04-15 | IA Executed | SCE | Current status |
| BELLEFIELD 3 SOLAR FARM | Kern | Solar+Battery | 150 | 2020-04-15 | IA Executed | SCE | Current status |
| Q58 | Kern | Solar+Battery | 150 | 2017-01-19 | System Impact Study | Los Angeles Department of Water and Power | Current status |
| Q75 | Kern | Solar+Battery | 150 | 2020-01-07 | System Impact Study | Los Angeles Department of Water and Power | Current status |
| TRACY COMBINED-CYCLE POWER PLANT | San Joaquin | Gas+Battery | 145 | 2007-10-24 | IA Executed | PGAE | Current status |
| Shoestring | Fresno | Solar+Battery | 135 | 2023-04-17 | Not Started | PG&E | Current status |
| Geras | Stanislaus | Solar+Battery | 134 | 2023-04-17 | Not Started | PGAE | Current status |
| BUTTERCUP HYBRID SOLAR | Merced | Solar+Battery | 131 | 2021-04-15 | System Impact Study | PGAE | Current status |
| Reflex | Riverside | Solar | 129 | 2023-04-17 | Not Started | SCE | Current status |
| Holly Oaks | Calaveras | Battery | 128 | 2023-04-17 | Not Started | PGAE | Current status |
| REDUX SOLAR | Fresno | Solar+Battery | 128 | 2017-05-01 | IA Executed | PGAE | Current status |
| TULE WIND | San Diego | Wind+Battery | 128 | 2004-05-24 | IA Executed | SDGE | Current status |
| CIERVO MOUNTAIN HYBRID | Fresno | Solar+Battery | 128 | 2021-04-15 | IA Executed | PGAE | Current status |
| LECONTE ENERGY STORAGE | Imperial | Battery | 125 | 2015-04-30 | IA Executed | SDGE | Current status |
| GI-2022-163 | Riverside | Solar+Battery | 125 | 2022-09-12 | In Progress (unknown study) | Imperial Irrigation District | Current status |
| GI-2021-145 | Riverside | Battery | 125 | 2021-08-17 | In Progress (unknown study) | Imperial Irrigation District | Current status |
| 2024-G2 | Shasta | Solar+Battery | 125 | 2024-11-01 | Not Started | WAPA Sierra Nevada | Current status |
| GASKELL WEST | Kern | Solar+Battery | 125 | 2014-04-30 | IA Executed | SCE | Current status |
| AJO POWER BANK | Santa Clara | Battery | 124 | 2018-04-16 | IA Executed | PGAE | Current status |
| EL REY POWER BANK | Monterey | Battery | 124 | 2021-04-15 | System Impact Study | PGAE | Current status |
| Bonita Bateria 2 | Orange | Battery | 123 | 2023-04-17 | Not Started | SDGE | Current status |
| AMERICAN KINGS SOLAR | Kings | Solar+Battery | 123 | 2007-11-01 | IA Executed | PGAE | Current status |
| WILDHORSE ENERGY CENTER | Sonoma | Battery | 122 | 2021-04-15 | System Impact Study | PGAE | Current status |
| HIGH WINDS STORAGE | Solano | Battery | 121 | 2021-04-15 | System Impact Study | PGAE | Current status |
| WINDSTAR I ALTERNATE | Kern | Wind+Battery | 120 | 2006-04-05 | IA Executed | SCE | Current status |
| LOS ESTEROS CRITICAL ENERGY FACILITY EXPANSION | Santa Clara | Gas+Battery | 120 | 2008-05-28 | IA Executed | PGAE | Current status |
| MIDWAY PEAKING | Fresno | Gas+Battery | 120 | 2005-01-12 | IA Executed | PGAE | Current status |
| SAPPHIRE SOLAR | Riverside | Solar+Battery | 117 | 2020-04-15 | IA Executed | SCE | Current status |
| RECLAIMED WIND | Alameda | Battery | 114 | 2018-04-16 | IA Executed | PGAE | Current status |
| SERENA STORAGE | Kern | Battery | 114 | 2021-04-15 | IA Executed | PGAE | Current status |
| MULQUEENEY RANCH WIND | Alameda | Wind | 114 | 2016-05-02 | IA Executed | PGAE | Current status |
| ALLIUM HYBRID | San Benito | Solar+Battery | 112 | 2021-04-15 | IA Executed | PGAE | Current status |
| Toland Renewable Energy Park | Solano | Wind | 108 | 2023-04-17 | Not Started | PGAE | Current status |
| PASTORIA SOLAR | Kern | Solar+Battery | 107 | 2016-05-02 | IA Executed | SCE | Current status |
| BOULDER BRUSH HYBRID | San Diego | Wind+Battery | 106 | 2021-04-15 | System Impact Study | SDGE | Current status |
| Voyager Energy Storage | Kern | Battery | 105 | 2023-04-17 | Not Started | SCE | Current status |
| LOCKHART SOLAR 2 | San Bernardino | Solar+Battery | 105 | 2019-04-15 | IA Executed | SCE | Current status |
| Ulua | Los Angeles | Battery | 105 | 2023-04-17 | Not Started | SCE | Current status |
| CRYSTAL FLATS | Kern | Solar+Battery | 103 | 2020-04-15 | IA Executed | PGAE | Current status |
| Octans | Fresno | Solar+Battery | 103 | 2023-04-17 | Not Started | PGAE | Current status |
| Fornax | Fresno | Solar+Battery | 103 | 2023-04-17 | Not Started | PGAE | Current status |
| LITTLE BEAR 4 | Fresno | Solar+Battery | 103 | 2015-04-30 | IA Executed | PGAE | Current status |
| Tioga Pass | San Joaquin | Battery | 103 | 2023-04-17 | Not Started | PGAE | Current status |
| Bonita Bateria | Orange | Battery | 103 | 2023-04-17 | Not Started | SDGE | Current status |
| Telluride | Fresno | Solar+Battery | 103 | 2023-04-17 | Not Started | PGAE | Current status |
| OAKDALE STORAGE | Stanislaus | Battery | 103 | 2021-04-15 | IA Executed | PGAE | Current status |
| LAS CAMAS 1 | Merced | Solar+Battery | 103 | 2017-05-01 | IA Executed | PGAE | Current status |
| LAS CAMAS 3 | Merced | Solar+Battery | 103 | 2018-04-16 | IA Executed | PGAE | Current status |
| LOS NIETOS | Orange | Battery | 102 | 2021-04-15 | IA Executed | SCE | Current status |
| PHAENON | Kern | Solar+Battery | 102 | 2021-04-15 | System Impact Study | PGAE | Current status |
| ARGES BESS | Solano | Battery | 102 | 2021-04-15 | System Impact Study | PGAE | Current status |
| Cassia | San Joaquin | Battery | 102 | 2023-04-17 | Not Started | PGAE | Current status |
| HUASO HYBRID | Fresno | Solar+Battery | 102 | 2021-04-15 | IA Executed | PGAE | Current status |
| PAJARO VALLEY STORAGE | San Diego | Battery | 102 | 2021-04-15 | System Impact Study | SDGE | Current status |
| KYAN SOLAR | Kern | Solar | 102 | 2016-05-02 | IA Executed | PGAE | Current status |
| DENALI ENERGY STORAGE | San Joaquin | Battery | 102 | 2020-04-15 | IA Executed | PGAE | Current status |
| Droga | Merced | Battery | 102 | 2023-04-17 | Not Started | PGAE | Current status |
| TOKAY STORAGE | Santa Clara | Battery | 102 | 2021-04-15 | IA Executed | PGAE | Current status |
| PUFF HYBRID SOLAR | Kern | Solar+Battery | 102 | 2020-04-15 | System Impact Study | PGAE | Current status |
| KINGSROAD HYBRID SOLAR | Kern | Solar+Battery | 102 | 2019-04-15 | IA Executed | PGAE | Current status |
| ARAMIS POWER PLANT | Alameda | Solar+Battery | 101 | 2017-05-01 | IA Executed | PGAE | Current status |
| DOUBLE SPRINGS ENERGY STORAGE | Calaveras | Battery | 101 | 2021-04-15 | IA Executed | PGAE | Current status |
| SUNBEAM STORAGE | San Mateo | Battery | 101 | 2021-04-15 | IA Executed | PGAE | Current status |
| EIGER ENERGY STORAGE | Kern | Battery | 101 | 2021-04-15 | System Impact Study | PGAE | Current status |
| KEYHOLE WIND | Kern | Wind | 100 | 2020-04-15 | IA Executed | SCE | Current status |
| PEACEFUL HOLLOW BESS | Fresno | Battery | 100 | 2021-04-15 | IA Executed | PGAE | Current status |
| GI-2022-153 | Riverside | Battery | 100 | 2022-01-28 | System Impact Study | Imperial Irrigation District | Current status |
| GI-2022-154 | Imperial | Solar+Battery | 100 | 2022-02-22 | System Impact Study | Imperial Irrigation District | Current status |
| GI-2023-166 | Imperial | Battery | 100 | 2023-01-10 | System Impact Study | Imperial Irrigation District | Current status |
| GI-2023-171 | Imperial | Solar+Battery | 100 | 2023-04-27 | In Progress (unknown study) | Imperial Irrigation District | Current status |
| Q109 | Los Angeles | Battery | 100 | 2024-06-19 | In Progress (unknown study) | Los Angeles Department of Water and Power | Current status |
| Q110 | Los Angeles | Battery | 100 | 2024-06-19 | In Progress (unknown study) | Los Angeles Department of Water and Power | Current status |
| 15 | Sacramento | Battery | 100 | 2021-12-10 | Facility Study | Sacramento Municipal Utility District | Current status |
| 25 | Sacramento | Battery | 100 | 2022-08-17 | Facility Study | Sacramento Municipal Utility District | Current status |
| 2023-G4 | Butte | Solar+Battery | 100 | 2023-08-22 | System Impact Study | WAPA Sierra Nevada | Current status |
| SANDRINI SOL 1 | Kern | Solar+Battery | 100 | 2017-05-01 | IA Executed | PGAE | Current status |
| SEGS EXPANSION 2 HYBRID | San Bernardino | Solar+Battery | 100 | 2020-04-15 | IA Executed | SCE | Current status |
| TENDRIL | Kern | Solar+Battery | 100 | 2023-04-17 | Not Started | PGAE | Current status |
| GOLDEN FIELDS SOLAR | Kern | Battery | 100 | 2015-04-30 | IA Executed | SCE | Current status |
| NOOSA ENERGY STORAGE | San Joaquin | Battery | 99 | 2019-04-15 | IA Executed | PGAE | Current status |
| SOLANO 4 WIND | Solano | Wind | 92 | 2018-04-16 | IA Executed | PGAE | Current status |
| REDWOOD SOLAR FARM | Kern | Solar | 90 | 2011-03-31 | IA Executed | PGAE | Current status |
| GI-2021-148 | Imperial | Solar+Battery | 90 | 2021-11-17 | System Impact Study | Imperial Irrigation District | Current status |
| GI-2023-169 | Imperial | Battery | 90 | 2023-04-14 | In Progress (unknown study) | Imperial Irrigation District | Current status |
| KETTLE SOLAR ONE | San Diego | Solar+Battery | 90 | 2018-04-16 | IA Executed | SDGE | Current status |
| CONAWAY HYBRID POWER PLANT | Yolo | Solar+Battery | 85 | 2020-04-15 | System Impact Study | PGAE | Current status |
| SAND HILL C | Alameda | Wind | 84 | 2017-05-01 | IA Executed | PGAE | Current status |
| JANUS | Colusa | Solar+Battery | 84 | 2018-04-16 | IA Executed | PGAE | Current status |
| GONZAGA WIND FARM | Merced | Wind | 80 | 2017-05-01 | IA Executed | PGAE | Current status |
| GI-2020-139 | Riverside | Other | 80 | 2020-11-09 | In Progress (unknown study) | Imperial Irrigation District | Current status |
| VALETUDO ENERGY STORAGE | Madera | Battery | 80 | 2021-04-15 | System Impact Study | PGAE | Current status |
| MONTEZUMA II | Solano | Wind+Battery | 78 | 2007-05-23 | IA Executed | PGAE | Current status |
| ZETA | Merced | Solar+Battery | 77 | 2020-04-15 | IA Executed | PGAE | Current status |
| PALMETTO ENERGY STORAGE | Alameda | Battery | 76 | 2021-04-15 | System Impact Study | PGAE | Current status |
| WILLOW SPRINGS SOLAR 4 | Kern | Battery | 75 | 2015-04-30 | IA Executed | SCE | Current status |
| HUMMINGBIRD ENERGY STORAGE | Santa Clara | Battery | 75 | 2018-04-16 | IA Executed | PGAE | Current status |
| GI-2021-146 | Imperial | Battery | 75 | 2021-11-17 | System Impact Study | Imperial Irrigation District | Current status |
| GI-2021-147 | Imperial | Solar+Battery | 75 | 2021-11-17 | System Impact Study | Imperial Irrigation District | Current status |
| GI-2023-178 | Imperial | Battery | 75 | 2023-06-29 | Cluster Study | Imperial Irrigation District | Current status |
| Q62 | Los Angeles | Battery | 75 | 2017-10-03 | System Impact Study | Los Angeles Department of Water and Power | Current status |
| FRESNO COGENERATION EXPANSION PROJECT | Fresno | Gas+Battery | 73 | 2005-03-30 | IA Executed | PGAE | Current status |
| HAMMERHEAD STORAGE | San Diego | Battery | 71 | 2021-04-15 | System Impact Study | SDGE | Current status |
| JASMINE | Kern | Solar+Battery | 71 | 2018-04-16 | IA Executed | PGAE | Current status |
| FALLBROOK ENERGY STORAGE | San Diego | Battery | 70 | 2015-04-30 | IA Executed | SDGE | Current status |
| Off Stream Water Storage | Colusa | Other Storage | 69 | 2023-04-17 | Not Started | PGAE | Current status |
| CHALAN SOLAR | Kern | Solar+Battery | 67 | 2018-04-16 | IA Executed | PGAE | Current status |
| ALTA VISTA SUNTOWER GENERATING STATION | Los Angeles | Solar+Battery | 66 | 2008-01-18 | IA Executed | SCE | Current status |
| GI-2022-157 | Imperial | Solar+Battery | 65 | 2022-09-06 | System Impact Study | Imperial Irrigation District | Current status |
| Box | Riverside | Solar | 63 | 2023-04-17 | Not Started | SCE | Current status |
| Little Hill | San Bernardino | Battery | 63 | 2023-04-17 | Not Started | SCE | Current status |
| MULQUEENEY RANCH WIND 2 | Alameda | Wind | 63 | 2018-04-16 | IA Executed | PGAE | Current status |
| AZALEA | Kern | Solar+Battery | 61 | 2018-04-16 | IA Executed | PGAE | Current status |
| GONZAGA HYBRID | Merced | Wind+Battery | 60 | 2020-04-15 | IA Executed | PGAE | Current status |
| GI-2022-161 | Imperial | Battery | 60 | 2022-09-06 | System Impact Study | Imperial Irrigation District | Current status |
| SANDSTORM WIND POWER | Riverside | Wind+Battery | 60 | 2006-10-23 | IA Executed | SCE | Current status |
| EXCELSIOR SOLAR (FKA: BURFORD FIVE POINTS) | Fresno | Solar+Battery | 60 | 2011-03-31 | IA Executed | PGAE | Current status |
| SIENNA SOLAR 2 | San Bernardino | Solar+Battery | 56 | 2021-04-15 | In Progress (unknown study) | SCE | Current status |
| MAYACAMAS GEOTHERMAL | Sonoma | Geothermal | 53 | 2021-04-15 | System Impact Study | PGAE | Current status |
| SCAFELL STORAGE | San Diego | Battery | 52 | 2020-04-15 | System Impact Study | SDGE | Current status |
| GERANIUM ENERGY STORAGE | San Diego | Battery | 51 | 2021-04-15 | System Impact Study | SDGE | Current status |
| VENTASSO ENERGY STORAGE | San Diego | Battery | 51 | 2019-04-15 | IA Executed | SDGE | Current status |
| VERBENA ENERGY STORAGE | Sutter | Battery | 51 | 2021-04-15 | System Impact Study | PGAE | Current status |
| TOWNSHIP POWER BANK | Sutter | Battery | 51 | 2021-04-15 | System Impact Study | PGAE | Current status |
| CHULA VISTA ENERGY CENTER 2 | San Diego | Battery | 50 | 2014-04-30 | IA Executed | SDGE | Current status |
| NORTH JOHNSON ENERGY CENTER | San Diego | Battery | 50 | 2014-04-30 | IA Executed | SDGE | Current status |
| WILLOW SPRINGS SOLAR 3 | Kern | Battery | 50 | 2014-04-30 | IA Executed | SCE | Current status |
| KIFER BESS 1 | Santa Clara | Battery | 50 | 2021-04-15 | Feasibility Study | PGAE | Current status |
| GI-2022-159 | Imperial | Solar+Battery | 50 | 2022-09-06 | System Impact Study | Imperial Irrigation District | Current status |
| GI-2022-160 | Imperial | Solar+Battery | 50 | 2022-09-06 | System Impact Study | Imperial Irrigation District | Current status |
| GI-2023-165 | Imperial | Solar+Battery | 50 | 2023-01-09 | System Impact Study | Imperial Irrigation District | Current status |
| GI-2020-130 | Imperial | Geothermal | 50 | 2020-01-15 | In Progress (unknown study) | Imperial Irrigation District | Current status |
| BALDY MESA 2 | San Bernardino | Solar+Battery | 50 | 2018-04-16 | IA Executed | SCE | Current status |
| SANBORN HYBRID 4 | Kern | Solar+Battery | 50 | 2020-04-15 | IA Executed | SCE | Current status |
| CAMINO SOLAR | Kern | Solar+Battery | 45 | 2017-05-01 | IA Executed | SCE | Current status |
| ANGELA | Tulare | Solar+Battery | 40 | 2018-04-16 | IA Executed | PGAE | Current status |
| GI-2023-172 | Imperial | Solar+Battery | 39 | 2023-04-28 | In Progress (unknown study) | Imperial Irrigation District | Current status |
| MONTEZUMA (HIGH WINDS III) | Solano | Wind+Battery | 38 | 2003-11-18 | IA Executed | PGAE | Current status |
| ROSEMARY | Fresno | Solar+Battery | 36 | 2020-04-15 | IA Executed | PGAE | Current status |
| TARRAGON HYBRID | Fresno | Solar+Battery | 36 | 2021-04-15 | System Impact Study | PGAE | Current status |
| GI-2022-158 | Imperial | Solar+Battery | 35 | 2022-09-06 | System Impact Study | Imperial Irrigation District | Current status |
| GI-2025-179 | Imperial | Gas | 35 | 2025-02-07 | Cluster Study | Imperial Irrigation District | Current status |
| ESCONDIDO ENERGY CENTER 2 | San Diego | Battery | 33 | 2014-04-30 | IA Executed | SDGE | Current status |
| GI-2023-177 | Imperial | Geothermal | 33 | 2023-04-30 | In Progress (unknown study) | Imperial Irrigation District | Current status |
| HIDDEN KNOLLS BESS | Kern | Battery | 31 | 2021-04-15 | System Impact Study | PGAE | Current status |
| GI-2021-144 | Imperial | Other | 28 | 2021-03-08 | In Progress (unknown study) | Imperial Irrigation District | Current status |
| ORLEANS | Fresno | Solar+Battery | 26 | 2021-04-15 | IA Executed | PGAE | Current status |
| SOLAR STAR 4 | Kern | Solar+Battery | 25 | 2016-05-02 | IA Executed | SCE | Current status |
| SOLAR STAR 3 | Kern | Solar+Battery | 25 | 2016-05-02 | IA Executed | SCE | Current status |
| T2-078 | Modoc | Solar+Battery | 25 | 2025-09-12 | PacifiCorp | Current status | |
| DYNAMO SOLAR | Napa | Solar | 25 | 2019-04-15 | IA Executed | PGAE | Current status |
| AIR STATION 1 | Kings | Solar+Battery | 21 | 2019-04-15 | In Progress (unknown study) | PGAE | Current status |
| LITTLE BEAR 3 | Fresno | Solar+Battery | 20 | 2015-04-30 | IA Executed | PGAE | Current status |
| LITTLE BEAR SOLAR 1 | Fresno | Solar+Battery | 20 | 2014-04-30 | IA Executed | PGAE | Current status |
| LITTLE BEAR SOLAR 2 | Fresno | Solar+Battery | 20 | 2014-04-30 | IA Executed | PGAE | Current status |
| STARLIGHT SOLAR | San Diego | Solar+Battery | 20 | 2017-05-01 | IA Executed | SDGE | Current status |
| CROW CREEK SOLAR 1 (FKA: FRONTIER SOLAR 1) (FKA AS SCATEC WESTSIDE SOLAR RANCH I AND STANISLAUS PV - PHASE 1) | Stanislaus | Solar+Battery | 20 | 2009-12-18 | IA Executed | PGAE | Current status |
| KETTLEMAN SOLAR PROJECT (FKA KETTLEMAN SOLAR FARM) | Kings | Solar+Battery | 20 | 2010-05-14 | IA Executed | PGAE | Current status |
| PUMPJACK SOLAR I (AKA PIONEER SOLAR I) | Kern | Solar+Battery | 20 | 2010-09-29 | IA Executed | PGAE | Current status |
| RIO BRAVO SOLAR 1 | Kern | Solar+Battery | 20 | 2012-04-02 | IA Executed | PGAE | Current status |
| RIO BRAVO SOLAR 2 | Kern | Solar+Battery | 20 | 2013-04-30 | IA Executed | PGAE | Current status |
| Separator Expansion | San Bernardino | Battery | 13 | 2023-04-17 | Not Started | SCE | Current status |
| LAKE ALPAUGH BATTERY STORAGE | Tulare | Battery | 10 | 2015-04-30 | IA Executed | PGAE | Current status |
| BOTTLE ROCK POWER | Lake | Geothermal+Battery | 9 | 2005-09-13 | IA Executed | PGAE | Current status |
| ALTAMONT MIDWAY LTD | Alameda | Wind | 5 | 2015-04-13 | IA Executed | PGAE | Current status |
| LASSEN LODGE HYDROELECTRIC | Tehama | Hydro | 5 | 2011-03-31 | IA Executed | PGAE | Current status |
| MILPA POWER BANK | Santa Clara | Battery | 3 | 2018-04-16 | System Impact Study | PGAE | Current status |
| LASSEN LODGE HYDROELECTRIC 2 | Tehama | Hydro | 1 | 2013-04-30 | IA Executed | PGAE | Current status |
| SUNRISE BUTTE | Imperial | Solar+Battery | 0 | 2019-04-15 | IA Executed | SDGE | Current status |
Lawrence Berkeley National Laboratory and GridTracker · Queued Up: Interconnection Queue Data File (Lawrence Berkeley National Laboratory) · data for 2025 · as of May 7, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0 May be out of date. The next release was due by May 7, 2027. Last checked for an update: Oct 31, 2026.