Power plant · EIA plant code 3406

Johnsonville

Operator
Tennessee Valley Authority
Location
Humphreys, TN (county level only)
Balancing authority
Tennessee Valley Authority (TVA)
Nameplate capacity
1,676 MW
Summer capacity
1,292.2 MW

Planned changes reported to EIA: 10 planned retirements.

U.S. Energy Information Administration · Annual Electric Generator Report (Form EIA-860) · data for 2025 · as of Sep 10, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Generation in 2025

Net generation
1,433,228 MWh
Capacity factor
10.6%

Capacity factor is net generation divided by nameplate capacity times the hours each generator was in service that year, counted by month.

U.S. Energy Information Administration · Power Plant Operations Report (Form EIA-923) · data for 2025 · as of Sep 11, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Emissions

Carbon dioxide in 2023
447,356 metric tons
Carbon dioxide per MWh
1,671 lb/MWh

eGRID reports 493,125 short tons. One short ton is 0.90718474 metric tons.

Emissions are for 2023, the newest eGRID year. Generation is for 2025, the newest EIA-923 year.

U.S. Environmental Protection Agency · Emissions & Generation Resource Integrated Database (eGRID) · data for 2023 · as of Jun 16, 2025 · retrieved Oct 31, 2026 · CC-BY-4.0

Generators

Generators at Johnsonville
GeneratorTechnologyEnergy sourceNameplateOperating sinceStatus
G10Natural Gas Fired Combustion TurbineNG68 MW1975Operable · Planned retirement: 2028 (reported to EIA) · As of September 2026 (EIA-860M): (OP) Operating
G11Natural Gas Fired Combustion TurbineNG68 MW1975Operable · Planned retirement: 2028 (reported to EIA) · As of September 2026 (EIA-860M): (OP) Operating
G12Natural Gas Fired Combustion TurbineNG68 MW1975Operable · Planned retirement: 2028 (reported to EIA) · As of September 2026 (EIA-860M): (OP) Operating
G13Natural Gas Fired Combustion TurbineNG68 MW1975Operable · Planned retirement: 2028 (reported to EIA) · As of September 2026 (EIA-860M): (OP) Operating
G14Natural Gas Fired Combustion TurbineNG68 MW1975Operable · Planned retirement: 2028 (reported to EIA) · As of September 2026 (EIA-860M): (OP) Operating
G15Natural Gas Fired Combustion TurbineNG68 MW1975Operable · Planned retirement: 2028 (reported to EIA) · As of September 2026 (EIA-860M): (OP) Operating
G16Natural Gas Fired Combustion TurbineNG68 MW1975Operable · Planned retirement: 2028 (reported to EIA) · As of September 2026 (EIA-860M): (OP) Operating
G17Natural Gas Fired Combustion TurbineNG84.5 MW2000Operable · As of September 2026 (EIA-860M): (OP) Operating
G18Natural Gas Fired Combustion TurbineNG84.5 MW2000Operable · As of September 2026 (EIA-860M): (OP) Operating
G19Natural Gas Fired Combustion TurbineNG84.5 MW2000Operable · As of September 2026 (EIA-860M): (OP) Operating
G20Natural Gas Fired Combustion TurbineNG84.5 MW2000Operable · As of September 2026 (EIA-860M): (OP) Operating
G21Natural Gas Fired Combustion TurbineNG65.8 MW2025Operable · As of September 2026 (EIA-860M): (OP) Operating
G22Natural Gas Fired Combustion TurbineNG65.8 MW2025Operable · As of September 2026 (EIA-860M): (OP) Operating
G23Natural Gas Fired Combustion TurbineNG65.8 MW2025Operable · As of September 2026 (EIA-860M): (OP) Operating
G24Natural Gas Fired Combustion TurbineNG65.8 MW2025Operable · As of September 2026 (EIA-860M): (OP) Operating
G25Natural Gas Fired Combustion TurbineNG65.8 MW2025Operable · As of September 2026 (EIA-860M): (OP) Operating
G26Natural Gas Fired Combustion TurbineNG65.8 MW2025Operable · As of September 2026 (EIA-860M): (OP) Operating
G27Natural Gas Fired Combustion TurbineNG65.8 MW2025Operable · As of September 2026 (EIA-860M): (OP) Operating
G28Natural Gas Fired Combustion TurbineNG65.8 MW2025Operable · As of September 2026 (EIA-860M): (OP) Operating
G29Natural Gas Fired Combustion TurbineNG65.8 MW2025Operable · As of September 2026 (EIA-860M): (OP) Operating
G30Natural Gas Fired Combustion TurbineNG65.8 MW2025Operable · As of September 2026 (EIA-860M): (OP) Operating
GT1Natural Gas Fired Combustion TurbineNG68 MW1975Operable · Planned retirement: 2028 (reported to EIA) · As of September 2026 (EIA-860M): (OP) Operating
GT2Natural Gas Fired Combustion TurbineNG68 MW1975Operable · Planned retirement: 2028 (reported to EIA) · As of September 2026 (EIA-860M): (OP) Operating
GT3Natural Gas Fired Combustion TurbineNG68 MW1975Operable · Planned retirement: 2028 (reported to EIA) · As of September 2026 (EIA-860M): (OP) Operating
GT4Natural Gas Fired Combustion TurbineNG68 MW1975Retired in 2025 · As of September 2026 (EIA-860M): retired
GT5Natural Gas Fired Combustion TurbineNG68 MW1975Retired in 2025 · As of September 2026 (EIA-860M): retired
GT6Natural Gas Fired Combustion TurbineNG68 MW1975Retired in 2025 · As of September 2026 (EIA-860M): retired
GT7Natural Gas Fired Combustion TurbineNG68 MW1975Retired in 2025 · As of September 2026 (EIA-860M): retired
GT8Natural Gas Fired Combustion TurbineNG68 MW1975Retired in 2025 · As of September 2026 (EIA-860M): retired
GT9Natural Gas Fired Combustion TurbineNG68 MW1975Retired in 2025 · As of September 2026 (EIA-860M): retired

U.S. Energy Information Administration · Monthly Update to the Annual Electric Generator Report (Form EIA-860M) · data for 2026-09 · as of Oct 23, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Report a problem

Tell us what looks wrong. The report holds only what you see in the preview below. Nothing is sent until you press Send.

Exactly what will be sent