gridprims

Power plant · EIA plant code 3399

Cumberland (TN)

Operator
Tennessee Valley Authority
Location
Stewart, TN (county level only)
Balancing authority
Tennessee Valley Authority (TVA)
Nameplate capacity
2,600 MW
Summer capacity
2,470 MW

Planned changes reported to EIA: 2 planned retirements and 4 proposed generators.

U.S. Energy Information Administration · Annual Electric Generator Report (Form EIA-860) · data for 2025 · as of Sep 10, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Generation in 2025

Net generation
9,096,100 MWh
Capacity factor
39.9%

Capacity factor is net generation divided by nameplate capacity times the hours each generator was in service that year, counted by month.

U.S. Energy Information Administration · Power Plant Operations Report (Form EIA-923) · data for 2025 · as of Sep 11, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Emissions

Carbon dioxide in 2023
9,362,587 metric tons
Carbon dioxide per MWh
2,395 lb/MWh

eGRID reports 10,320,486 short tons. One short ton is 0.90718474 metric tons.

Emissions are for 2023, the newest eGRID year. Generation is for 2025, the newest EIA-923 year.

U.S. Environmental Protection Agency · Emissions & Generation Resource Integrated Database (eGRID) · data for 2023 · as of Jun 16, 2025 · retrieved Oct 31, 2026 · CC-BY-4.0

Generators

Generators at Cumberland (TN)
GeneratorTechnologyEnergy sourceNameplateOperating sinceStatus
1Conventional Steam CoalBIT1,300 MW1973Operable · Planned retirement: 2028 (reported to EIA) · As of September 2026 (EIA-860M): (OP) Operating
2Conventional Steam CoalBIT1,300 MW1973Operable · Planned retirement: 2034 (reported to EIA) · As of September 2026 (EIA-860M): (OP) Operating
CTG1Natural Gas Fired Combined CycleNG454.8 MWProposed, planned start 2034 · As of September 2026 (EIA-860M): (U) Under construction, less than or equal to 50 percent complete
CTG2Natural Gas Fired Combined CycleNG454.8 MWProposed, planned start 2029 · As of September 2026 (EIA-860M): (P) Planned for installation, but regulatory approvals not initiated
STG1Natural Gas Fired Combined CycleNG323 MWProposed, planned start 2034 · As of September 2026 (EIA-860M): (U) Under construction, less than or equal to 50 percent complete
STG2Natural Gas Fired Combined CycleNG323 MWProposed, planned start 2029 · As of September 2026 (EIA-860M): (P) Planned for installation, but regulatory approvals not initiated

U.S. Energy Information Administration · Monthly Update to the Annual Electric Generator Report (Form EIA-860M) · data for 2026-09 · as of Oct 23, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Report a problem

Tell us what looks wrong. The report holds only what you see in the preview below. Nothing is sent until you press Send.

Exactly what will be sent