gridprims

Power plant · EIA plant code 971

Waterloo

Operator
City of Waterloo - (IL)
Location
Monroe, IL (county level only)
Balancing authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Nameplate capacity
30.2 MW
Summer capacity
28.3 MW

Planned changes reported to EIA: 1 proposed generator.

U.S. Energy Information Administration · Annual Electric Generator Report (Form EIA-860) · data for 2025 · as of Sep 10, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Generation in 2025

Net generation
751 MWh
Capacity factor
0.3%

Capacity factor is net generation divided by nameplate capacity times the hours each generator was in service that year, counted by month.

U.S. Energy Information Administration · Power Plant Operations Report (Form EIA-923) · data for 2025 · as of Sep 11, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Emissions

Carbon dioxide in 2023
309 metric tons
Carbon dioxide per MWh
1,474 lb/MWh

eGRID reports 340 short tons. One short ton is 0.90718474 metric tons.

Emissions are for 2023, the newest eGRID year. Generation is for 2025, the newest EIA-923 year.

U.S. Environmental Protection Agency · Emissions & Generation Resource Integrated Database (eGRID) · data for 2023 · as of Jun 16, 2025 · retrieved Oct 31, 2026 · CC-BY-4.0

Generators

Generators at Waterloo
GeneratorTechnologyEnergy sourceNameplateOperating sinceStatus
1Petroleum LiquidsDFO3.1 MW1970Operable · As of September 2026 (EIA-860M): (SB) Standby/Backup: available for service but not normally used
10Petroleum LiquidsDFO1.8 MW1996Operable · As of September 2026 (EIA-860M): (OP) Operating
11Petroleum LiquidsDFO1.8 MW1996Operable · As of September 2026 (EIA-860M): (OP) Operating
12Natural Gas Fired Combustion TurbineNG6.6 MW2002Operable · As of September 2026 (EIA-860M): (OP) Operating
13Natural Gas Fired Combustion TurbineNG7 MW2012Operable · As of September 2026 (EIA-860M): (OP) Operating
14Natural Gas Fired Combustion TurbineNG8 MWProposed, planned start 2026 · As of September 2026 (EIA-860M): (OP) Operating
2Petroleum LiquidsDFO0.2 MW1954Operable · As of September 2026 (EIA-860M): (OS) Out of service and NOT expected to return to service in next calendar year
3Petroleum LiquidsDFO0.2 MW1946Operable · As of September 2026 (EIA-860M): (OS) Out of service and NOT expected to return to service in next calendar year
4Petroleum LiquidsDFO2 MW1963Operable · As of September 2026 (EIA-860M): (SB) Standby/Backup: available for service but not normally used
5Petroleum LiquidsDFO0.5 MW1950Operable · As of September 2026 (EIA-860M): (OS) Out of service and NOT expected to return to service in next calendar year
6Petroleum LiquidsDFO0.5 MW1950Operable · As of September 2026 (EIA-860M): (OS) Out of service and NOT expected to return to service in next calendar year
7Petroleum LiquidsDFO1.7 MW1959Operable · As of September 2026 (EIA-860M): (SB) Standby/Backup: available for service but not normally used
8Petroleum LiquidsDFO3 MW1973Operable · As of September 2026 (EIA-860M): (SB) Standby/Backup: available for service but not normally used
9Petroleum LiquidsDFO1.8 MW1996Operable · As of September 2026 (EIA-860M): (OP) Operating

U.S. Energy Information Administration · Monthly Update to the Annual Electric Generator Report (Form EIA-860M) · data for 2026-09 · as of Oct 23, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Report a problem

Tell us what looks wrong. The report holds only what you see in the preview below. Nothing is sent until you press Send.

Exactly what will be sent