gridprims

Power plant · EIA plant code 7887

Terry Bundy Generating Station

Operator
Lincoln Electric System
Location
Lancaster, NE (county level only)
Balancing authority
Southwest Power Pool (SWPP)
Nameplate capacity
216.3 MW
Summer capacity
175.8 MW

Planned changes reported to EIA: 2 proposed generators.

U.S. Energy Information Administration · Annual Electric Generator Report (Form EIA-860) · data for 2025 · as of Sep 10, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Generation in 2025

Net generation
136,016 MWh
Capacity factor
7.2%

Capacity factor is net generation divided by nameplate capacity times the hours each generator was in service that year, counted by month.

U.S. Energy Information Administration · Power Plant Operations Report (Form EIA-923) · data for 2025 · as of Sep 11, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Emissions

Carbon dioxide in 2023
18,682 metric tons
Carbon dioxide per MWh
462 lb/MWh

eGRID reports 20,593 short tons. One short ton is 0.90718474 metric tons.

Emissions are for 2023, the newest eGRID year. Generation is for 2025, the newest EIA-923 year.

U.S. Environmental Protection Agency · Emissions & Generation Resource Integrated Database (eGRID) · data for 2023 · as of Jun 16, 2025 · retrieved Oct 31, 2026 · CC-BY-4.0

Generators

Generators at Terry Bundy Generating Station
GeneratorTechnologyEnergy sourceNameplateOperating sinceStatus
1Natural Gas Fired Combined CycleNG28.2 MW2004Operable · As of September 2026 (EIA-860M): (OP) Operating
2Natural Gas Fired Combined CycleNG60.5 MW2003Operable · As of September 2026 (EIA-860M): (OP) Operating
3Natural Gas Fired Combined CycleNG60.5 MW2004Operable · As of September 2026 (EIA-860M): (OP) Operating
4Natural Gas Fired Combustion TurbineNG60.5 MW2003Operable · As of September 2026 (EIA-860M): (OP) Operating
5Natural Gas Fired Combustion TurbineNG52 MWProposed, planned start 2029 · As of September 2026 (EIA-860M): (L) Regulatory approvals pending. Not under construction
6Natural Gas Fired Combustion TurbineNG52 MWProposed, planned start 2029 · As of September 2026 (EIA-860M): (L) Regulatory approvals pending. Not under construction
BSUPetroleum LiquidsDFO1.8 MW2004Operable · As of September 2026 (EIA-860M): (OP) Operating
LFG1Landfill GasLFG1.6 MW2014Operable · As of September 2026 (EIA-860M): (OP) Operating
LFG2Landfill GasLFG1.6 MW2014Operable · As of September 2026 (EIA-860M): (OP) Operating
LFG3Landfill GasLFG1.6 MW2014Operable · As of September 2026 (EIA-860M): (OP) Operating

U.S. Energy Information Administration · Monthly Update to the Annual Electric Generator Report (Form EIA-860M) · data for 2026-09 · as of Oct 23, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Report a problem

Tell us what looks wrong. The report holds only what you see in the preview below. Nothing is sent until you press Send.

Exactly what will be sent