Power plant · EIA plant code 69432
Antigo Solar Partners, LLC
- Operator
- Wisconsin Electric Power Co
- Location
- Langlade, WI (county level only)
- Balancing authority
- Midcontinent Independent Transmission System Operator, Inc.. (MISO)
- Nameplate capacity
- 6 MW
- Summer capacity
- 6 MW
U.S. Energy Information Administration · Annual Electric Generator Report (Form EIA-860) · data for 2025 · as of Sep 10, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0 May be out of date. The next release was due by Sep 10, 2027. Last checked for an update: Oct 31, 2026.
Generation in 2025
- Net generation
- 8,950 MWh
- Capacity factor
- 101.9%
Above 100%: the generation reported to EIA is more than the reported capacity could make. One of the two figures may be out of date.
Capacity factor is net generation divided by nameplate capacity times the hours each generator was in service that year, counted by month.
U.S. Energy Information Administration · Power Plant Operations Report (Form EIA-923) · data for 2025 · as of Sep 11, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0 May be out of date. The next release was due by Sep 11, 2027. Last checked for an update: Oct 31, 2026.
Emissions
This plant is not in eGRID2023 (revision 2).
U.S. Environmental Protection Agency · Emissions & Generation Resource Integrated Database (eGRID) · data for 2023 · as of Jun 16, 2025 · retrieved Oct 31, 2026 · CC-BY-4.0 May be out of date. The next release was due by Jan 31, 2026. Last checked for an update: Oct 31, 2026.
Generators
| Generator | Technology | Energy source | Nameplate | Operating since | Status |
|---|---|---|---|---|---|
| 20255 | Solar Photovoltaic | SUN | 6 MW | 2025 | Operable · As of September 2026 (EIA-860M): (OP) Operating |
U.S. Energy Information Administration · Monthly Update to the Annual Electric Generator Report (Form EIA-860M) · data for 2026-09 · as of Oct 23, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0 May be out of date. The next release was due by Nov 23, 2026. Last checked for an update: Oct 31, 2026.