gridprims

Power plant · EIA plant code 69187

Big Bend 1 Solar and Battery Storage

Operator
Tampa Electric Co
Location
Hillsborough, FL (county level only)
Balancing authority
Tampa Electric Company (TEC)
Nameplate capacity
32.4 MW
Summer capacity
29.8 MW

U.S. Energy Information Administration · Annual Electric Generator Report (Form EIA-860) · data for 2025 · as of Sep 10, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Generation in 2025

Net generation
2,223 MWh
Capacity factor
0.8%

Capacity factor is net generation divided by nameplate capacity times the hours each generator was in service that year, counted by month.

U.S. Energy Information Administration · Power Plant Operations Report (Form EIA-923) · data for 2025 · as of Sep 11, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Emissions

This plant is not in eGRID2023 (revision 2).

U.S. Environmental Protection Agency · Emissions & Generation Resource Integrated Database (eGRID) · data for 2023 · as of Jun 16, 2025 · retrieved Oct 31, 2026 · CC-BY-4.0

Generators

Generators at Big Bend 1 Solar and Battery Storage
GeneratorTechnologyEnergy sourceNameplateOperating sinceStatus
1Solar PhotovoltaicSUN19.8 MW2017Operable · As of September 2026 (EIA-860M): (OP) Operating
BESS1BatteriesMWH12.6 MW2019Operable · As of September 2026 (EIA-860M): (OP) Operating

U.S. Energy Information Administration · Monthly Update to the Annual Electric Generator Report (Form EIA-860M) · data for 2026-09 · as of Oct 23, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Report a problem