gridprims

Power plant · EIA plant code 68828

Tangelo

Operator
Florida Power & Light Co
Location
Okeechobee, FL (county level only)
Balancing authority
Florida Power & Light Company (FPL)
Nameplate capacity
0 MW
Summer capacity
0 MW

Planned changes reported to EIA: 1 proposed generator.

U.S. Energy Information Administration · Annual Electric Generator Report (Form EIA-860) · data for 2025 · as of Sep 10, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Generation in 2025

Net generation
Not reported
Capacity factor
No EIA-923 generation for 2025

Capacity factor is net generation divided by nameplate capacity times the hours each generator was in service that year, counted by month.

U.S. Energy Information Administration · Power Plant Operations Report (Form EIA-923) · data for 2025 · as of Sep 11, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Emissions

This plant is not in eGRID2023 (revision 2).

U.S. Environmental Protection Agency · Emissions & Generation Resource Integrated Database (eGRID) · data for 2023 · as of Jun 16, 2025 · retrieved Oct 31, 2026 · CC-BY-4.0

Generators

Generators at Tangelo
GeneratorTechnologyEnergy sourceNameplateOperating sinceStatus
1Solar PhotovoltaicSUN74.5 MWProposed, planned start 2027 · As of September 2026 (EIA-860M): (U) Under construction, less than or equal to 50 percent complete

U.S. Energy Information Administration · Monthly Update to the Annual Electric Generator Report (Form EIA-860M) · data for 2026-09 · as of Oct 23, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Report a problem

Tell us what looks wrong. The report holds only what you see in the preview below. Nothing is sent until you press Send.

Exactly what will be sent