gridprims

Power plant · EIA plant code 6704

Pebbly Beach Generating Station Hybrid

Operator
Southern California Edison Co
Location
Los Angeles, CA (county level only)
Balancing authority
California Independent System Operator (CISO)
Nameplate capacity
12.7 MW
Summer capacity
12.7 MW

U.S. Energy Information Administration · Annual Electric Generator Report (Form EIA-860) · data for 2025 · as of Sep 10, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Generation in 2025

Net generation
28,290 MWh
Capacity factor
25.4%

Capacity factor is net generation divided by nameplate capacity times the hours each generator was in service that year, counted by month.

U.S. Energy Information Administration · Power Plant Operations Report (Form EIA-923) · data for 2025 · as of Sep 11, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Emissions

Carbon dioxide in 2023
23,168 metric tons
Carbon dioxide per MWh
1,744 lb/MWh

eGRID reports 25,538 short tons. One short ton is 0.90718474 metric tons.

Emissions are for 2023, the newest eGRID year. Generation is for 2025, the newest EIA-923 year.

U.S. Environmental Protection Agency · Emissions & Generation Resource Integrated Database (eGRID) · data for 2023 · as of Jun 16, 2025 · retrieved Oct 31, 2026 · CC-BY-4.0

Generators

Generators at Pebbly Beach Generating Station Hybrid
GeneratorTechnologyEnergy sourceNameplateOperating sinceStatus
10Petroleum LiquidsDFO1.1 MW1966Operable · As of September 2026 (EIA-860M): (OP) Operating
12Petroleum LiquidsDFO1.6 MW1976Operable · As of September 2026 (EIA-860M): (OP) Operating
14Petroleum LiquidsDFO1.4 MW1986Operable · As of September 2026 (EIA-860M): (OP) Operating
15Petroleum LiquidsDFO2.8 MW1995Operable · As of September 2026 (EIA-860M): (OP) Operating
7Petroleum LiquidsDFO1 MW1958Operable · As of September 2026 (EIA-860M): (OP) Operating
8Petroleum LiquidsDFO1.5 MW1963Operable · As of September 2026 (EIA-860M): (OS) Out of service and NOT expected to return to service in next calendar year
MT01Petroleum LiquidsPG0.1 MW2011Operable · As of September 2026 (EIA-860M): (OP) Operating
MT02Petroleum LiquidsPG0.1 MW2011Operable · As of September 2026 (EIA-860M): (OP) Operating
MT03Petroleum LiquidsPG0.1 MW2011Operable · As of September 2026 (EIA-860M): (OS) Out of service and NOT expected to return to service in next calendar year
MT04Petroleum LiquidsPG0.1 MW2011Operable · As of September 2026 (EIA-860M): (OP) Operating
MT05Petroleum LiquidsPG0.1 MW2011Operable · As of September 2026 (EIA-860M): (OP) Operating
MT06Petroleum LiquidsPG0.1 MW2011Operable · As of September 2026 (EIA-860M): (OS) Out of service and NOT expected to return to service in next calendar year
MT07Petroleum LiquidsPG0.1 MW2011Operable · As of September 2026 (EIA-860M): (OP) Operating
MT08Petroleum LiquidsPG0.1 MW2011Operable · As of September 2026 (EIA-860M): (OP) Operating
MT09Petroleum LiquidsPG0.1 MW2011Operable · As of September 2026 (EIA-860M): (OP) Operating
MT10Petroleum LiquidsPG0.1 MW2011Operable · As of September 2026 (EIA-860M): (OP) Operating
MT11Petroleum LiquidsPG0.1 MW2011Operable · As of September 2026 (EIA-860M): (OP) Operating
MT14Petroleum LiquidsPG0.1 MW2011Operable · As of September 2026 (EIA-860M): (OP) Operating
MT15Petroleum LiquidsPG0.1 MW2011Operable · As of September 2026 (EIA-860M): (OP) Operating
MT16Petroleum LiquidsPG0.1 MW2011Operable · As of September 2026 (EIA-860M): (OS) Out of service and NOT expected to return to service in next calendar year
MT17Petroleum LiquidsPG0.1 MW2011Operable · As of September 2026 (EIA-860M): (OP) Operating
MT18Petroleum LiquidsPG0.1 MW2011Operable · As of September 2026 (EIA-860M): (OS) Out of service and NOT expected to return to service in next calendar year
MT19Petroleum LiquidsPG0.1 MW2011Operable · As of September 2026 (EIA-860M): (OP) Operating
MT20Petroleum LiquidsPG0.1 MW2011Operable · As of September 2026 (EIA-860M): (OP) Operating
MT21Petroleum LiquidsPG0.1 MW2011Operable · As of September 2026 (EIA-860M): (OP) Operating
MT22Petroleum LiquidsPG0.1 MW2011Operable · As of September 2026 (EIA-860M): (OS) Out of service and NOT expected to return to service in next calendar year
MT23Petroleum LiquidsPG0.1 MW2011Operable · As of September 2026 (EIA-860M): (OP) Operating
MT24Petroleum LiquidsPG0.1 MW2011Operable · As of September 2026 (EIA-860M): (OP) Operating
MT25Petroleum LiquidsPG0.1 MW2011Operable · As of September 2026 (EIA-860M): (OP) Operating
NASB1BatteriesMWH1 MW2012Operable · As of September 2026 (EIA-860M): (OS) Out of service and NOT expected to return to service in next calendar year

U.S. Energy Information Administration · Monthly Update to the Annual Electric Generator Report (Form EIA-860M) · data for 2026-09 · as of Oct 23, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Report a problem