gridprims

Power plant · EIA plant code 64601

County of San Diego COC Hybrid

Operator
Solar Star California LXXVIII, LLC
Location
San Diego, CA (county level only)
Balancing authority
California Independent System Operator (CISO)
Nameplate capacity
2.1 MW
Summer capacity
2.2 MW

U.S. Energy Information Administration · Annual Electric Generator Report (Form EIA-860) · data for 2025 · as of Sep 10, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Generation in 2025

Net generation
3,054 MWh
Capacity factor
16.6%

Capacity factor is net generation divided by nameplate capacity times the hours each generator was in service that year, counted by month.

U.S. Energy Information Administration · Power Plant Operations Report (Form EIA-923) · data for 2025 · as of Sep 11, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Emissions

eGRID2023 (revision 2) reports no carbon dioxide for this plant.

Emissions are for 2023, the newest eGRID year. Generation is for 2025, the newest EIA-923 year.

U.S. Environmental Protection Agency · Emissions & Generation Resource Integrated Database (eGRID) · data for 2023 · as of Jun 16, 2025 · retrieved Oct 31, 2026 · CC-BY-4.0

Generators

Generators at County of San Diego COC Hybrid
GeneratorTechnologyEnergy sourceNameplateOperating sinceStatus
ESSBatteriesMWH0.4 MW2020Operable · As of September 2026 (EIA-860M): (OP) Operating
PVSolar PhotovoltaicSUN1.7 MW2020Operable · As of September 2026 (EIA-860M): (OP) Operating

U.S. Energy Information Administration · Monthly Update to the Annual Electric Generator Report (Form EIA-860M) · data for 2026-09 · as of Oct 23, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0