gridprims

Power plant · EIA plant code 64529

Golden Triangle

Operator
Origis Energy USA, Inc
Location
Lowndes, MS (county level only)
Balancing authority
Tennessee Valley Authority (TVA)
Nameplate capacity
250 MW
Summer capacity
250 MW

U.S. Energy Information Administration · Annual Electric Generator Report (Form EIA-860) · data for 2025 · as of Sep 10, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Generation in 2025

Net generation
411,833 MWh
Capacity factor
18.8%

Capacity factor is net generation divided by nameplate capacity times the hours each generator was in service that year, counted by month.

U.S. Energy Information Administration · Power Plant Operations Report (Form EIA-923) · data for 2025 · as of Sep 11, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Emissions

This plant is not in eGRID2023 (revision 2).

U.S. Environmental Protection Agency · Emissions & Generation Resource Integrated Database (eGRID) · data for 2023 · as of Jun 16, 2025 · retrieved Oct 31, 2026 · CC-BY-4.0

Generators

Generators at Golden Triangle
GeneratorTechnologyEnergy sourceNameplateOperating sinceStatus
MS5_SBatteriesMWH50 MW2025Operable · As of September 2026 (EIA-860M): (OP) Operating
OEMS5Solar PhotovoltaicSUN200 MW2025Operable · As of September 2026 (EIA-860M): (OP) Operating

U.S. Energy Information Administration · Monthly Update to the Annual Electric Generator Report (Form EIA-860M) · data for 2026-09 · as of Oct 23, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Report a problem

Tell us what looks wrong. The report holds only what you see in the preview below. Nothing is sent until you press Send.

Exactly what will be sent