Power plant · EIA plant code 60264

Bacliff

Operator
PHR Holdings LLC
Location
Galveston, TX (county level only)
Balancing authority
Electric Reliability Council of Texas, Inc. (ERCO)
Nameplate capacity
427.2 MW
Summer capacity
324 MW

U.S. Energy Information Administration · Annual Electric Generator Report (Form EIA-860) · data for 2025 · as of Sep 10, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Generation in 2025

Net generation
103,084 MWh
Capacity factor
2.8%

Capacity factor is net generation divided by nameplate capacity times the hours each generator was in service that year, counted by month.

U.S. Energy Information Administration · Power Plant Operations Report (Form EIA-923) · data for 2025 · as of Sep 11, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Emissions

Carbon dioxide in 2023
179,831 metric tons
Carbon dioxide per MWh
1,573 lb/MWh

eGRID reports 198,230 short tons. One short ton is 0.90718474 metric tons.

Emissions are for 2023, the newest eGRID year. Generation is for 2025, the newest EIA-923 year.

U.S. Environmental Protection Agency · Emissions & Generation Resource Integrated Database (eGRID) · data for 2023 · as of Jun 16, 2025 · retrieved Oct 31, 2026 · CC-BY-4.0

Generators

Generators at Bacliff
GeneratorTechnologyEnergy sourceNameplateOperating sinceStatus
BCGT1Natural Gas Fired Combustion TurbineNG71.2 MW2018Operable · As of September 2026 (EIA-860M): (OP) Operating
BCGT2Natural Gas Fired Combustion TurbineNG71.2 MW2018Operable · As of September 2026 (EIA-860M): (OP) Operating
BCGT3Natural Gas Fired Combustion TurbineNG71.2 MW2018Operable · As of September 2026 (EIA-860M): (OP) Operating
BCGT4Natural Gas Fired Combustion TurbineNG71.2 MW2018Operable · As of September 2026 (EIA-860M): (OP) Operating
BCGT5Natural Gas Fired Combustion TurbineNG71.2 MW2018Operable · As of September 2026 (EIA-860M): (OP) Operating
BCGT6Natural Gas Fired Combustion TurbineNG71.2 MW2018Operable · As of September 2026 (EIA-860M): (OP) Operating

U.S. Energy Information Administration · Monthly Update to the Annual Electric Generator Report (Form EIA-860M) · data for 2026-09 · as of Oct 23, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0