Power plant · EIA plant code 58697

L V Sutton Combined Cycle

Operator
Duke Energy Progress - (NC)
Location
New Hanover, NC (county level only)
Balancing authority
Duke Energy Progress East (CPLE)
Nameplate capacity
851 MW
Summer capacity
698 MW

U.S. Energy Information Administration · Annual Electric Generator Report (Form EIA-860) · data for 2025 · as of Sep 10, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Generation in 2025

Net generation
3,534,472 MWh
Capacity factor
47.4%

Capacity factor is net generation divided by nameplate capacity times the hours each generator was in service that year, counted by month.

U.S. Energy Information Administration · Power Plant Operations Report (Form EIA-923) · data for 2025 · as of Sep 11, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Emissions

This plant is not in eGRID2023 (revision 2).

U.S. Environmental Protection Agency · Emissions & Generation Resource Integrated Database (eGRID) · data for 2023 · as of Jun 16, 2025 · retrieved Oct 31, 2026 · CC-BY-4.0

Generators

Generators at L V Sutton Combined Cycle
GeneratorTechnologyEnergy sourceNameplateOperating sinceStatus
CA1Natural Gas Fired Combined CycleNG288 MW2013Operable · As of September 2026 (EIA-860M): (OP) Operating
CT004Natural Gas Fired Combustion TurbineNG60.5 MW2017Operable · As of September 2026 (EIA-860M): (OP) Operating
CT005Natural Gas Fired Combustion TurbineNG60.5 MW2017Operable · As of September 2026 (EIA-860M): (OP) Operating
CT1Natural Gas Fired Combined CycleNG221 MW2013Operable · As of September 2026 (EIA-860M): (OP) Operating
CT2Natural Gas Fired Combined CycleNG221 MW2013Operable · As of September 2026 (EIA-860M): (OP) Operating

U.S. Energy Information Administration · Monthly Update to the Annual Electric Generator Report (Form EIA-860M) · data for 2026-09 · as of Oct 23, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Report a problem

Tell us what looks wrong. The report holds only what you see in the preview below. Nothing is sent until you press Send.

Exactly what will be sent