Power plant · EIA plant code 58507
Montefieor Medical Center Moses Division
- Operator
- Montefiore Medical Center Moses Division
- Location
- Bronx, NY (county level only)
- Balancing authority
- New York Independent System Operator (NYIS)
- Nameplate capacity
- 18.7 MW
- Summer capacity
- 17 MW
U.S. Energy Information Administration · Annual Electric Generator Report (Form EIA-860) · data for 2025 · as of Sep 10, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0 May be out of date. The next release was due by Sep 10, 2027. Last checked for an update: Oct 31, 2026.
Generation in 2025
- Net generation
- 29,825 MWh
- Capacity factor
- 18.2%
Capacity factor is net generation divided by nameplate capacity times the hours each generator was in service that year, counted by month.
U.S. Energy Information Administration · Power Plant Operations Report (Form EIA-923) · data for 2025 · as of Sep 11, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0 May be out of date. The next release was due by Sep 11, 2027. Last checked for an update: Oct 31, 2026.
Emissions
- Carbon dioxide in 2023
- 15,244 metric tons
- Carbon dioxide per MWh
- 1,170 lb/MWh
eGRID reports 16,804 short tons. One short ton is 0.90718474 metric tons.
Emissions are for 2023, the newest eGRID year. Generation is for 2025, the newest EIA-923 year.
U.S. Environmental Protection Agency · Emissions & Generation Resource Integrated Database (eGRID) · data for 2023 · as of Jun 16, 2025 · retrieved Oct 31, 2026 · CC-BY-4.0 May be out of date. The next release was due by Jan 31, 2026. Last checked for an update: Oct 31, 2026.
Generators
| Generator | Technology | Energy source | Nameplate | Operating since | Status |
|---|---|---|---|---|---|
| EMG01 | Petroleum Liquids | DFO | 1 MW | 2007 | Operable · As of September 2026 (EIA-860M): (SB) Standby/Backup: available for service but not normally used |
| EMG02 | Petroleum Liquids | DFO | 0.6 MW | 1998 | Operable · As of September 2026 (EIA-860M): (SB) Standby/Backup: available for service but not normally used |
| EMG03 | Petroleum Liquids | DFO | 0.6 MW | 1998 | Operable · As of September 2026 (EIA-860M): (SB) Standby/Backup: available for service but not normally used |
| EMG04 | Petroleum Liquids | DFO | 0.5 MW | 1998 | Operable · As of September 2026 (EIA-860M): (SB) Standby/Backup: available for service but not normally used |
| EMG06 | Petroleum Liquids | DFO | 0.3 MW | 1998 | Operable · As of September 2026 (EIA-860M): (SB) Standby/Backup: available for service but not normally used |
| EMG07 | Petroleum Liquids | DFO | 0.2 MW | 1998 | Operable · As of September 2026 (EIA-860M): (SB) Standby/Backup: available for service but not normally used |
| EMG08 | Petroleum Liquids | DFO | 0.2 MW | 1998 | Operable · As of September 2026 (EIA-860M): (SB) Standby/Backup: available for service but not normally used |
| EMG09 | Petroleum Liquids | DFO | 2 MW | 2011 | Operable · As of September 2026 (EIA-860M): (SB) Standby/Backup: available for service but not normally used |
| EMG10 | Petroleum Liquids | DFO | 2 MW | 2011 | Operable · As of September 2026 (EIA-860M): (SB) Standby/Backup: available for service but not normally used |
| EMG11 | Petroleum Liquids | DFO | 0.6 MW | 1997 | Operable · As of September 2026 (EIA-860M): (SB) Standby/Backup: available for service but not normally used |
| EMG12 | Petroleum Liquids | DFO | 0.6 MW | 2016 | Operable · As of September 2026 (EIA-860M): (SB) Standby/Backup: available for service but not normally used |
| ES006 | Natural Gas Fired Combustion Turbine | NG | 5.3 MW | 2002 | Operable · As of September 2026 (EIA-860M): (OP) Operating |
| S0001 | Natural Gas Internal Combustion Engine | NG | 1.6 MW | 1994 | Operable · As of September 2026 (EIA-860M): (OS) Out of service and NOT expected to return to service in next calendar year |
| S0002 | Natural Gas Internal Combustion Engine | NG | 1.6 MW | 1994 | Operable · As of September 2026 (EIA-860M): (OS) Out of service and NOT expected to return to service in next calendar year |
| S0003 | Natural Gas Internal Combustion Engine | NG | 1.6 MW | 1994 | Operable · As of September 2026 (EIA-860M): (OS) Out of service and NOT expected to return to service in next calendar year |
U.S. Energy Information Administration · Monthly Update to the Annual Electric Generator Report (Form EIA-860M) · data for 2026-09 · as of Oct 23, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0 May be out of date. The next release was due by Nov 23, 2026. Last checked for an update: Oct 31, 2026.