Coolidge Generation Station

Operator
Salt River Project
Location
Pinal, AZ (county level only)
Balancing authority
Salt River Project (SRP)
Nameplate capacity
726 MW
Summer capacity
520.8 MW

Planned changes reported to EIA: 12 proposed generators.

U.S. Energy Information Administration · Annual Electric Generator Report (Form EIA-860) · data for 2025 · as of Sep 10, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Generation in 2025

Net generation
58,818 MWh
Capacity factor
0.9%

Capacity factor is net generation divided by nameplate capacity times the hours each generator was in service that year, counted by month.

U.S. Energy Information Administration · Power Plant Operations Report (Form EIA-923) · data for 2025 · as of Sep 11, 2026 · retrieved Nov 1, 2026 · CC-BY-4.0

Emissions

Carbon dioxide in 2023
241,155 metric tons
Carbon dioxide per MWh
1,260 lb/MWh

eGRID reports 265,828 short tons. One short ton is 0.90718474 metric tons.

Emissions are for 2023, the newest eGRID year. Generation is for 2025, the newest EIA-923 year.

U.S. Environmental Protection Agency · Emissions & Generation Resource Integrated Database (eGRID) · data for 2023 · as of Jun 16, 2025 · retrieved Oct 31, 2026 · CC-BY-4.0

Generators

Generators at Coolidge Generation Station
GeneratorTechnologyEnergy sourceNameplateOperating sinceStatus
1Natural Gas Fired Combustion TurbineNG60.5 MW2011Operable · As of September 2026 (EIA-860M): (OP) Operating
10Natural Gas Fired Combustion TurbineNG60.5 MW2011Operable · As of September 2026 (EIA-860M): (OP) Operating
11Natural Gas Fired Combustion TurbineNG60.5 MW2011Operable · As of September 2026 (EIA-860M): (OP) Operating
12Natural Gas Fired Combustion TurbineNG60.5 MW2011Operable · As of September 2026 (EIA-860M): (OP) Operating
2Natural Gas Fired Combustion TurbineNG60.5 MW2011Operable · As of September 2026 (EIA-860M): (OP) Operating
3Natural Gas Fired Combustion TurbineNG60.5 MW2011Operable · As of September 2026 (EIA-860M): (OP) Operating
4Natural Gas Fired Combustion TurbineNG60.5 MW2011Operable · As of September 2026 (EIA-860M): (OP) Operating
5Natural Gas Fired Combustion TurbineNG60.5 MW2011Operable · As of September 2026 (EIA-860M): (OP) Operating
6Natural Gas Fired Combustion TurbineNG60.5 MW2011Operable · As of September 2026 (EIA-860M): (OP) Operating
7Natural Gas Fired Combustion TurbineNG60.5 MW2011Operable · As of September 2026 (EIA-860M): (OP) Operating
8Natural Gas Fired Combustion TurbineNG60.5 MW2011Operable · As of September 2026 (EIA-860M): (OP) Operating
9Natural Gas Fired Combustion TurbineNG60.5 MW2011Operable · As of September 2026 (EIA-860M): (OP) Operating
COE13Natural Gas Fired Combustion TurbineNG49.5 MWProposed, planned start 2026 · As of September 2026 (EIA-860M): (OP) Operating
COE14Natural Gas Fired Combustion TurbineNG49.5 MWProposed, planned start 2026 · As of September 2026 (EIA-860M): (OP) Operating
COE15Natural Gas Fired Combustion TurbineNG49.5 MWProposed, planned start 2026 · As of September 2026 (EIA-860M): (OP) Operating
COE16Natural Gas Fired Combustion TurbineNG49.5 MWProposed, planned start 2026 · As of September 2026 (EIA-860M): (OP) Operating
COE17Natural Gas Fired Combustion TurbineNG49.5 MWProposed, planned start 2026 · As of September 2026 (EIA-860M): (OP) Operating
COE18Natural Gas Fired Combustion TurbineNG49.5 MWProposed, planned start 2026 · As of September 2026 (EIA-860M): (OP) Operating
COE19Natural Gas Fired Combustion TurbineNG49.5 MWProposed, planned start 2027 · As of September 2026 (EIA-860M): (U) Under construction, less than or equal to 50 percent complete
COE20Natural Gas Fired Combustion TurbineNG49.5 MWProposed, planned start 2027 · As of September 2026 (EIA-860M): (U) Under construction, less than or equal to 50 percent complete
COE21Natural Gas Fired Combustion TurbineNG49.5 MWProposed, planned start 2027 · As of September 2026 (EIA-860M): (U) Under construction, less than or equal to 50 percent complete
COE22Natural Gas Fired Combustion TurbineNG49.5 MWProposed, planned start 2027 · As of September 2026 (EIA-860M): (U) Under construction, less than or equal to 50 percent complete
COE23Natural Gas Fired Combustion TurbineNG49.5 MWProposed, planned start 2027 · As of September 2026 (EIA-860M): (U) Under construction, less than or equal to 50 percent complete
COE24Natural Gas Fired Combustion TurbineNG49.5 MWProposed, planned start 2027 · As of September 2026 (EIA-860M): (U) Under construction, less than or equal to 50 percent complete

U.S. Energy Information Administration · Monthly Update to the Annual Electric Generator Report (Form EIA-860M) · data for 2026-09 · as of Oct 23, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0