Power plant · EIA plant code 56688

New Bern

Operator
Industrial Power Generating Company LLC
Location
Craven, NC (county level only)
Balancing authority
Duke Energy Progress East (CPLE)
Nameplate capacity
5.4 MW
Summer capacity
5.4 MW

U.S. Energy Information Administration · Annual Electric Generator Report (Form EIA-860) · data for 2025 · as of Sep 10, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Generation in 2025

Net generation
7,218 MWh
Capacity factor
15.3%

Capacity factor is net generation divided by nameplate capacity times the hours each generator was in service that year, counted by month.

U.S. Energy Information Administration · Power Plant Operations Report (Form EIA-923) · data for 2025 · as of Sep 11, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Emissions

Carbon dioxide in 2023
1,076 metric tons
Carbon dioxide per MWh
85 lb/MWh

eGRID reports 1,186 short tons. One short ton is 0.90718474 metric tons.

Emissions are for 2023, the newest eGRID year. Generation is for 2025, the newest EIA-923 year.

U.S. Environmental Protection Agency · Emissions & Generation Resource Integrated Database (eGRID) · data for 2023 · as of Jun 16, 2025 · retrieved Oct 31, 2026 · CC-BY-4.0

Generators

Generators at New Bern
GeneratorTechnologyEnergy sourceNameplateOperating sinceStatus
1Landfill GasLFG0.3 MW2007Operable · As of September 2026 (EIA-860M): (OP) Operating
10Landfill GasLFG0.3 MW2007Operable · As of September 2026 (EIA-860M): (OP) Operating
11Landfill GasLFG0.3 MW2007Operable · As of September 2026 (EIA-860M): (OP) Operating
12Landfill GasLFG0.3 MW2007Operable · As of September 2026 (EIA-860M): (OP) Operating
13Landfill GasLFG0.3 MW2011Operable · As of September 2026 (EIA-860M): (OP) Operating
14Landfill GasLFG0.3 MW2011Operable · As of September 2026 (EIA-860M): (OP) Operating
15Landfill GasLFG0.3 MW2011Operable · As of September 2026 (EIA-860M): (OP) Operating
16Landfill GasLFG0.3 MW2011Operable · As of September 2026 (EIA-860M): (OP) Operating
17Landfill GasLFG0.3 MW2011Operable · As of September 2026 (EIA-860M): (OP) Operating
18Landfill GasLFG0.3 MW2011Operable · As of September 2026 (EIA-860M): (OP) Operating
2Landfill GasLFG0.3 MW2007Operable · As of September 2026 (EIA-860M): (OP) Operating
3Landfill GasLFG0.3 MW2007Operable · As of September 2026 (EIA-860M): (OP) Operating
4Landfill GasLFG0.3 MW2007Operable · As of September 2026 (EIA-860M): (OP) Operating
5Landfill GasLFG0.3 MW2007Operable · As of September 2026 (EIA-860M): (OP) Operating
6Landfill GasLFG0.3 MW2007Operable · As of September 2026 (EIA-860M): (OP) Operating
7Landfill GasLFG0.3 MW2007Operable · As of September 2026 (EIA-860M): (OP) Operating
8Landfill GasLFG0.3 MW2007Operable · As of September 2026 (EIA-860M): (OP) Operating
9Landfill GasLFG0.3 MW2007Operable · As of September 2026 (EIA-860M): (OP) Operating

U.S. Energy Information Administration · Monthly Update to the Annual Electric Generator Report (Form EIA-860M) · data for 2026-09 · as of Oct 23, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0