Power plant · EIA plant code 56150
McIntosh Combined Cycle Facility
- Operator
- Georgia Power Co
- Location
- Effingham, GA (county level only)
- Balancing authority
- Southern Company Services, Inc. - Trans (SOCO)
- Nameplate capacity
- 1,376.6 MW
- Summer capacity
- 1,315.6 MW
U.S. Energy Information Administration · Annual Electric Generator Report (Form EIA-860) · data for 2025 · as of Sep 10, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0 May be out of date. The next release was due by Sep 10, 2027. Last checked for an update: Oct 31, 2026.
Generation in 2025
- Net generation
- 7,857,050 MWh
- Capacity factor
- 65.2%
Capacity factor is net generation divided by nameplate capacity times the hours each generator was in service that year, counted by month.
U.S. Energy Information Administration · Power Plant Operations Report (Form EIA-923) · data for 2025 · as of Sep 11, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0 May be out of date. The next release was due by Sep 11, 2027. Last checked for an update: Oct 31, 2026.
Emissions
- Carbon dioxide in 2023
- 3,475,402 metric tons
- Carbon dioxide per MWh
- 841 lb/MWh
eGRID reports 3,830,974 short tons. One short ton is 0.90718474 metric tons.
Emissions are for 2023, the newest eGRID year. Generation is for 2025, the newest EIA-923 year.
U.S. Environmental Protection Agency · Emissions & Generation Resource Integrated Database (eGRID) · data for 2023 · as of Jun 16, 2025 · retrieved Oct 31, 2026 · CC-BY-4.0 May be out of date. The next release was due by Jan 31, 2026. Last checked for an update: Oct 31, 2026.
Generators
| Generator | Technology | Energy source | Nameplate | Operating since | Status |
|---|---|---|---|---|---|
| 10ST | Natural Gas Fired Combined Cycle | NG | 281.9 MW | 2005 | Operable · As of September 2026 (EIA-860M): (OP) Operating |
| 11ST | Natural Gas Fired Combined Cycle | NG | 281.9 MW | 2005 | Operable · As of September 2026 (EIA-860M): (OP) Operating |
| C10A | Natural Gas Fired Combined Cycle | NG | 203.2 MW | 2005 | Operable · As of September 2026 (EIA-860M): (OP) Operating |
| C10B | Natural Gas Fired Combined Cycle | NG | 203.2 MW | 2005 | Operable · As of September 2026 (EIA-860M): (OP) Operating |
| C11A | Natural Gas Fired Combined Cycle | NG | 203.2 MW | 2005 | Operable · As of September 2026 (EIA-860M): (OP) Operating |
| C11B | Natural Gas Fired Combined Cycle | NG | 203.2 MW | 2005 | Operable · As of September 2026 (EIA-860M): (OP) Operating |
U.S. Energy Information Administration · Monthly Update to the Annual Electric Generator Report (Form EIA-860M) · data for 2026-09 · as of Oct 23, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0 May be out of date. The next release was due by Nov 23, 2026. Last checked for an update: Oct 31, 2026.