Power plant · EIA plant code 55284

Big Sandy Peaker Plant

Operator
Middle River Power II, LLC
Location
Wayne, WV (county level only)
Balancing authority
PJM Interconnection, LLC (PJM)
Nameplate capacity
353.4 MW
Summer capacity
300 MW

U.S. Energy Information Administration · Annual Electric Generator Report (Form EIA-860) · data for 2025 · as of Sep 10, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Generation in 2025

Net generation
329,839 MWh
Capacity factor
10.7%

Capacity factor is net generation divided by nameplate capacity times the hours each generator was in service that year, counted by month.

U.S. Energy Information Administration · Power Plant Operations Report (Form EIA-923) · data for 2025 · as of Sep 11, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Emissions

Carbon dioxide in 2023
195,397 metric tons
Carbon dioxide per MWh
1,326 lb/MWh

eGRID reports 215,389 short tons. One short ton is 0.90718474 metric tons.

Emissions are for 2023, the newest eGRID year. Generation is for 2025, the newest EIA-923 year.

U.S. Environmental Protection Agency · Emissions & Generation Resource Integrated Database (eGRID) · data for 2023 · as of Jun 16, 2025 · retrieved Oct 31, 2026 · CC-BY-4.0

Generators

Generators at Big Sandy Peaker Plant
GeneratorTechnologyEnergy sourceNameplateOperating sinceStatus
BSG1Natural Gas Fired Combustion TurbineNG58.9 MW2001Operable · As of September 2026 (EIA-860M): (OP) Operating
BSG2Natural Gas Fired Combustion TurbineNG58.9 MW2001Operable · As of September 2026 (EIA-860M): (OP) Operating
BSG3Natural Gas Fired Combustion TurbineNG58.9 MW2001Operable · As of September 2026 (EIA-860M): (OP) Operating
BSG4Natural Gas Fired Combustion TurbineNG58.9 MW2001Operable · As of September 2026 (EIA-860M): (OP) Operating
BSG5Natural Gas Fired Combustion TurbineNG58.9 MW2001Operable · As of September 2026 (EIA-860M): (OP) Operating
BSG6Natural Gas Fired Combustion TurbineNG58.9 MW2001Operable · As of September 2026 (EIA-860M): (OP) Operating

U.S. Energy Information Administration · Monthly Update to the Annual Electric Generator Report (Form EIA-860M) · data for 2026-09 · as of Oct 23, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0