gridprims

Power plant · EIA plant code 54951

Monterey One Water

Operator
Monterey One Water
Location
Monterey, CA (county level only)
Balancing authority
California Independent System Operator (CISO)
Nameplate capacity
1.8 MW
Summer capacity
1.8 MW

U.S. Energy Information Administration · Annual Electric Generator Report (Form EIA-860) · data for 2025 · as of Sep 10, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Generation in 2025

Net generation
8,375 MWh
Capacity factor
53.1%

Capacity factor is net generation divided by nameplate capacity times the hours each generator was in service that year, counted by month.

U.S. Energy Information Administration · Power Plant Operations Report (Form EIA-923) · data for 2025 · as of Sep 11, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Emissions

Carbon dioxide in 2023
467 metric tons
Carbon dioxide per MWh
131 lb/MWh

eGRID reports 515 short tons. One short ton is 0.90718474 metric tons.

Emissions are for 2023, the newest eGRID year. Generation is for 2025, the newest EIA-923 year.

U.S. Environmental Protection Agency · Emissions & Generation Resource Integrated Database (eGRID) · data for 2023 · as of Jun 16, 2025 · retrieved Oct 31, 2026 · CC-BY-4.0

Generators

Generators at Monterey One Water
GeneratorTechnologyEnergy sourceNameplateOperating sinceStatus
EG1Other Waste BiomassOBG0.6 MW1988Operable · As of September 2026 (EIA-860M): (OP) Operating
EG2Other Waste BiomassOBG0.6 MW1988Operable · As of September 2026 (EIA-860M): (OP) Operating
EG3Other Waste BiomassOBG0.6 MW1988Operable · As of September 2026 (EIA-860M): (OP) Operating

U.S. Energy Information Administration · Monthly Update to the Annual Electric Generator Report (Form EIA-860M) · data for 2026-09 · as of Oct 23, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Report a problem

Tell us what looks wrong. The report holds only what you see in the preview below. Nothing is sent until you press Send.

Exactly what will be sent