Power plant · EIA plant code 54918

Ergon Refining Vicksburg

Operator
Ergon Refining Inc
Location
Warren, MS (county level only)
Balancing authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Nameplate capacity
4.8 MW
Summer capacity
4.5 MW

Planned changes reported to EIA: 1 planned retirement and 2 proposed generators.

U.S. Energy Information Administration · Annual Electric Generator Report (Form EIA-860) · data for 2025 · as of Sep 10, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Generation in 2025

Net generation
35,038 MWh
Capacity factor
83.3%

Capacity factor is net generation divided by nameplate capacity times the hours each generator was in service that year, counted by month.

U.S. Energy Information Administration · Power Plant Operations Report (Form EIA-923) · data for 2025 · as of Sep 11, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Emissions

Carbon dioxide in 2023
10,579 metric tons
Carbon dioxide per MWh
614 lb/MWh

eGRID reports 11,662 short tons. One short ton is 0.90718474 metric tons.

Emissions are for 2023, the newest eGRID year. Generation is for 2025, the newest EIA-923 year.

U.S. Environmental Protection Agency · Emissions & Generation Resource Integrated Database (eGRID) · data for 2023 · as of Jun 16, 2025 · retrieved Oct 31, 2026 · CC-BY-4.0

Generators

Generators at Ergon Refining Vicksburg
GeneratorTechnologyEnergy sourceNameplateOperating sinceStatus
TM02Natural Gas Fired Combustion TurbineNG7.9 MWProposed, planned start 2027 · As of September 2026 (EIA-860M): (U) Under construction, less than or equal to 50 percent complete
TM03Natural Gas Fired Combustion TurbineNG7.9 MWProposed, planned start 2027 · As of September 2026 (EIA-860M): (U) Under construction, less than or equal to 50 percent complete
TMO1Natural Gas Fired Combustion TurbineNG4.8 MW1995Operable · Planned retirement: 2027 (reported to EIA) · As of September 2026 (EIA-860M): (OP) Operating

U.S. Energy Information Administration · Monthly Update to the Annual Electric Generator Report (Form EIA-860M) · data for 2026-09 · as of Oct 23, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Report a problem

Tell us what looks wrong. The report holds only what you see in the preview below. Nothing is sent until you press Send.

Exactly what will be sent