gridprims

Power plant · EIA plant code 54912

Martinez Refining

Operator
Martinez Refining Co
Location
Contra Costa, CA (county level only)
Balancing authority
California Independent System Operator (CISO)
Nameplate capacity
100 MW
Summer capacity
100 MW

U.S. Energy Information Administration · Annual Electric Generator Report (Form EIA-860) · data for 2025 · as of Sep 10, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Generation in 2025

Net generation
733,953 MWh
Capacity factor
83.8%

Capacity factor is net generation divided by nameplate capacity times the hours each generator was in service that year, counted by month.

U.S. Energy Information Administration · Power Plant Operations Report (Form EIA-923) · data for 2025 · as of Sep 11, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Emissions

Carbon dioxide in 2023
238,035 metric tons
Carbon dioxide per MWh
717 lb/MWh

eGRID reports 262,389 short tons. One short ton is 0.90718474 metric tons.

Emissions are for 2023, the newest eGRID year. Generation is for 2025, the newest EIA-923 year.

U.S. Environmental Protection Agency · Emissions & Generation Resource Integrated Database (eGRID) · data for 2023 · as of Jun 16, 2025 · retrieved Oct 31, 2026 · CC-BY-4.0

Generators

Generators at Martinez Refining
GeneratorTechnologyEnergy sourceNameplateOperating sinceStatus
GTG1Natural Gas Fired Combined CycleNG40 MW1995Operable · As of September 2026 (EIA-860M): (OP) Operating
GTG2Natural Gas Fired Combined CycleNG40 MW1996Operable · As of September 2026 (EIA-860M): (OP) Operating
STG1Other GasesOG20 MW1995Operable · As of September 2026 (EIA-860M): (OP) Operating

U.S. Energy Information Administration · Monthly Update to the Annual Electric Generator Report (Form EIA-860M) · data for 2026-09 · as of Oct 23, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Report a problem

Tell us what looks wrong. The report holds only what you see in the preview below. Nothing is sent until you press Send.

Exactly what will be sent