gridprims

Power plant · EIA plant code 50973

Motiva Enterprises Port Arthur Refinery

Operator
Motiva Enterprises LLC
Location
Jefferson, TX (county level only)
Balancing authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Nameplate capacity
276.8 MW
Summer capacity
239.4 MW

U.S. Energy Information Administration · Annual Electric Generator Report (Form EIA-860) · data for 2025 · as of Sep 10, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Generation in 2025

Net generation
1,609,437 MWh
Capacity factor
66.4%

Capacity factor is net generation divided by nameplate capacity times the hours each generator was in service that year, counted by month.

U.S. Energy Information Administration · Power Plant Operations Report (Form EIA-923) · data for 2025 · as of Sep 11, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Emissions

Carbon dioxide in 2023
605,564 metric tons
Carbon dioxide per MWh
957 lb/MWh

eGRID reports 667,520 short tons. One short ton is 0.90718474 metric tons.

Emissions are for 2023, the newest eGRID year. Generation is for 2025, the newest EIA-923 year.

U.S. Environmental Protection Agency · Emissions & Generation Resource Integrated Database (eGRID) · data for 2023 · as of Jun 16, 2025 · retrieved Oct 31, 2026 · CC-BY-4.0

Generators

Generators at Motiva Enterprises Port Arthur Refinery
GeneratorTechnologyEnergy sourceNameplateOperating sinceStatus
GN31Other GasesOG10 MW1962Operable · As of September 2026 (EIA-860M): (OP) Operating
GN32Other GasesOG15.6 MW1957Operable · As of September 2026 (EIA-860M): (OP) Operating
GN33Other GasesOG25.5 MW1978Operable · As of September 2026 (EIA-860M): (OP) Operating
GN34Natural Gas Fired Combustion TurbineNG18.8 MW1970Operable · As of September 2026 (EIA-860M): (OP) Operating
GN35Natural Gas Fired Combined CycleNG40.5 MW1983Operable · As of September 2026 (EIA-860M): (OP) Operating
GN41Natural Gas Fired Combined CycleNG41.6 MW2011Operable · As of September 2026 (EIA-860M): (OP) Operating
GN42Natural Gas Fired Combined CycleNG41.6 MW2011Operable · As of September 2026 (EIA-860M): (OP) Operating
GN43Natural Gas Fired Combined CycleNG41.6 MW2011Operable · As of September 2026 (EIA-860M): (OP) Operating
GN44Natural Gas Fired Combined CycleNG41.6 MW2011Operable · As of September 2026 (EIA-860M): (OP) Operating

U.S. Energy Information Administration · Monthly Update to the Annual Electric Generator Report (Form EIA-860M) · data for 2026-09 · as of Oct 23, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Report a problem

Tell us what looks wrong. The report holds only what you see in the preview below. Nothing is sent until you press Send.

Exactly what will be sent