gridprims

Power plant · EIA plant code 50121

Valero Refinery Corpus Christi West

Operator
Valero Refining Co
Location
Nueces, TX (county level only)
Balancing authority
Electric Reliability Council of Texas, Inc. (ERCO)
Nameplate capacity
69.2 MW
Summer capacity
65.2 MW

U.S. Energy Information Administration · Annual Electric Generator Report (Form EIA-860) · data for 2025 · as of Sep 10, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Generation in 2025

Net generation
82,083 MWh
Capacity factor
13.5%

Capacity factor is net generation divided by nameplate capacity times the hours each generator was in service that year, counted by month.

U.S. Energy Information Administration · Power Plant Operations Report (Form EIA-923) · data for 2025 · as of Sep 11, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Emissions

Carbon dioxide in 2023
162,804 metric tons
Carbon dioxide per MWh
3,256 lb/MWh

eGRID reports 179,461 short tons. One short ton is 0.90718474 metric tons.

Emissions are for 2023, the newest eGRID year. Generation is for 2025, the newest EIA-923 year.

U.S. Environmental Protection Agency · Emissions & Generation Resource Integrated Database (eGRID) · data for 2023 · as of Jun 16, 2025 · retrieved Oct 31, 2026 · CC-BY-4.0

Generators

Generators at Valero Refinery Corpus Christi West
GeneratorTechnologyEnergy sourceNameplateOperating sinceStatus
PRUAll OtherWH12 MW1983Operable · As of September 2026 (EIA-860M): (OP) Operating
TG1Petroleum CokePC28.6 MW1983Operable · As of September 2026 (EIA-860M): (OP) Operating
TG2Petroleum CokePC28.6 MW1983Operable · As of September 2026 (EIA-860M): (OP) Operating

U.S. Energy Information Administration · Monthly Update to the Annual Electric Generator Report (Form EIA-860M) · data for 2026-09 · as of Oct 23, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Report a problem

Tell us what looks wrong. The report holds only what you see in the preview below. Nothing is sent until you press Send.

Exactly what will be sent