Power plant · EIA plant code 50061

San Diego State University

Operator
San Diego State University
Location
San Diego, CA (county level only)
Balancing authority
California Independent System Operator (CISO)
Nameplate capacity
15.1 MW
Summer capacity
11.9 MW

U.S. Energy Information Administration · Annual Electric Generator Report (Form EIA-860) · data for 2025 · as of Sep 10, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Generation in 2025

Net generation
53,444 MWh
Capacity factor
40.4%

Capacity factor is net generation divided by nameplate capacity times the hours each generator was in service that year, counted by month.

U.S. Energy Information Administration · Power Plant Operations Report (Form EIA-923) · data for 2025 · as of Sep 11, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Emissions

Carbon dioxide in 2023
19,101 metric tons
Carbon dioxide per MWh
725 lb/MWh

eGRID reports 21,055 short tons. One short ton is 0.90718474 metric tons.

Emissions are for 2023, the newest eGRID year. Generation is for 2025, the newest EIA-923 year.

U.S. Environmental Protection Agency · Emissions & Generation Resource Integrated Database (eGRID) · data for 2023 · as of Jun 16, 2025 · retrieved Oct 31, 2026 · CC-BY-4.0

Generators

Generators at San Diego State University
GeneratorTechnologyEnergy sourceNameplateOperating sinceStatus
GEN2Natural Gas Fired Combined CycleNG5.1 MW2002Operable · As of September 2026 (EIA-860M): (OP) Operating
GEN3Natural Gas Fired Combined CycleNG5.1 MW2002Operable · As of September 2026 (EIA-860M): (OP) Operating
GEN4Natural Gas Fired Combined CycleNG4.1 MW2002Operable · As of September 2026 (EIA-860M): (OP) Operating
GEN5Solar PhotovoltaicSUN0.1 MW2009Operable · As of September 2026 (EIA-860M): (OP) Operating
GEN6Solar PhotovoltaicSUN0.3 MW2011Operable · As of September 2026 (EIA-860M): (OP) Operating
GEN7Solar PhotovoltaicSUN0.3 MW2012Operable · As of September 2026 (EIA-860M): (OP) Operating
GEN8Solar PhotovoltaicSUN0.1 MW2014Operable · As of September 2026 (EIA-860M): (OP) Operating

U.S. Energy Information Administration · Monthly Update to the Annual Electric Generator Report (Form EIA-860M) · data for 2026-09 · as of Oct 23, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Report a problem

Tell us what looks wrong. The report holds only what you see in the preview below. Nothing is sent until you press Send.

Exactly what will be sent