gridprims

Power plant · EIA plant code 3797

Chesterfield

Operator
Virginia Electric & Power Co
Location
Chesterfield, VA (county level only)
Balancing authority
PJM Interconnection, LLC (PJM)
Nameplate capacity
446.6 MW
Summer capacity
386 MW

Planned changes reported to EIA: 4 proposed generators.

U.S. Energy Information Administration · Annual Electric Generator Report (Form EIA-860) · data for 2025 · as of Sep 10, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Generation in 2025

Net generation
2,070,103 MWh
Capacity factor
52.9%

Capacity factor is net generation divided by nameplate capacity times the hours each generator was in service that year, counted by month.

U.S. Energy Information Administration · Power Plant Operations Report (Form EIA-923) · data for 2025 · as of Sep 11, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Emissions

Carbon dioxide in 2023
1,287,348 metric tons
Carbon dioxide per MWh
1,168 lb/MWh

eGRID reports 1,419,058 short tons. One short ton is 0.90718474 metric tons.

Emissions are for 2023, the newest eGRID year. Generation is for 2025, the newest EIA-923 year.

U.S. Environmental Protection Agency · Emissions & Generation Resource Integrated Database (eGRID) · data for 2023 · as of Jun 16, 2025 · retrieved Oct 31, 2026 · CC-BY-4.0

Generators

Generators at Chesterfield
GeneratorTechnologyEnergy sourceNameplateOperating sinceStatus
CERC1Natural Gas Fired Combustion TurbineNG250 MWProposed, planned start 2029 · As of September 2026 (EIA-860M): (L) Regulatory approvals pending. Not under construction
CERC2Natural Gas Fired Combustion TurbineNG250 MWProposed, planned start 2029 · As of September 2026 (EIA-860M): (L) Regulatory approvals pending. Not under construction
CERC3Natural Gas Fired Combustion TurbineNG250 MWProposed, planned start 2029 · As of September 2026 (EIA-860M): (L) Regulatory approvals pending. Not under construction
CERC4Natural Gas Fired Combustion TurbineNG250 MWProposed, planned start 2029 · As of September 2026 (EIA-860M): (L) Regulatory approvals pending. Not under construction
CT7Natural Gas Fired Combined CycleNG145 MW1990Operable · As of September 2026 (EIA-860M): (OP) Operating
CT8Natural Gas Fired Combined CycleNG148 MW1992Operable · As of September 2026 (EIA-860M): (OP) Operating
CW7Natural Gas Fired Combined CycleNG74.4 MW1990Operable · As of September 2026 (EIA-860M): (OP) Operating
CW8Natural Gas Fired Combined CycleNG79.2 MW1992Operable · As of September 2026 (EIA-860M): (OP) Operating

U.S. Energy Information Administration · Monthly Update to the Annual Electric Generator Report (Form EIA-860M) · data for 2026-09 · as of Oct 23, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0