gridprims

Power plant · EIA plant code 3630

Pearsall

Operator
South Texas Electric Coop, Inc
Location
Frio, TX (county level only)
Balancing authority
Electric Reliability Council of Texas, Inc. (ERCO)
Nameplate capacity
201.6 MW
Summer capacity
201.6 MW

U.S. Energy Information Administration · Annual Electric Generator Report (Form EIA-860) · data for 2025 · as of Sep 10, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Generation in 2025

Net generation
453,886 MWh
Capacity factor
25.7%

Capacity factor is net generation divided by nameplate capacity times the hours each generator was in service that year, counted by month.

U.S. Energy Information Administration · Power Plant Operations Report (Form EIA-923) · data for 2025 · as of Sep 11, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Emissions

Carbon dioxide in 2023
191,840 metric tons
Carbon dioxide per MWh
1,070 lb/MWh

eGRID reports 211,467 short tons. One short ton is 0.90718474 metric tons.

Emissions are for 2023, the newest eGRID year. Generation is for 2025, the newest EIA-923 year.

U.S. Environmental Protection Agency · Emissions & Generation Resource Integrated Database (eGRID) · data for 2023 · as of Jun 16, 2025 · retrieved Oct 31, 2026 · CC-BY-4.0

Generators

Generators at Pearsall
GeneratorTechnologyEnergy sourceNameplateOperating sinceStatus
10ANatural Gas Internal Combustion EngineNG8.4 MW2010Operable · As of September 2026 (EIA-860M): (OP) Operating
11ANatural Gas Internal Combustion EngineNG8.4 MW2010Operable · As of September 2026 (EIA-860M): (OP) Operating
12ANatural Gas Internal Combustion EngineNG8.4 MW2010Operable · As of September 2026 (EIA-860M): (OP) Operating
13ANatural Gas Internal Combustion EngineNG8.4 MW2010Operable · As of September 2026 (EIA-860M): (OP) Operating
14ANatural Gas Internal Combustion EngineNG8.4 MW2010Operable · As of September 2026 (EIA-860M): (OP) Operating
15ANatural Gas Internal Combustion EngineNG8.4 MW2010Operable · As of September 2026 (EIA-860M): (OP) Operating
16ANatural Gas Internal Combustion EngineNG8.4 MW2010Operable · As of September 2026 (EIA-860M): (OP) Operating
17ANatural Gas Internal Combustion EngineNG8.4 MW2010Operable · As of September 2026 (EIA-860M): (OP) Operating
18ANatural Gas Internal Combustion EngineNG8.4 MW2010Operable · As of September 2026 (EIA-860M): (OP) Operating
19ANatural Gas Internal Combustion EngineNG8.4 MW2010Operable · As of September 2026 (EIA-860M): (OP) Operating
1ANatural Gas Internal Combustion EngineNG8.4 MW2010Operable · As of September 2026 (EIA-860M): (OP) Operating
20ANatural Gas Internal Combustion EngineNG8.4 MW2010Operable · As of September 2026 (EIA-860M): (OP) Operating
21ANatural Gas Internal Combustion EngineNG8.4 MW2010Operable · As of September 2026 (EIA-860M): (OP) Operating
22ANatural Gas Internal Combustion EngineNG8.4 MW2010Operable · As of September 2026 (EIA-860M): (OP) Operating
23ANatural Gas Internal Combustion EngineNG8.4 MW2010Operable · As of September 2026 (EIA-860M): (OP) Operating
24ANatural Gas Internal Combustion EngineNG8.4 MW2010Operable · As of September 2026 (EIA-860M): (OP) Operating
2ANatural Gas Internal Combustion EngineNG8.4 MW2010Operable · As of September 2026 (EIA-860M): (OP) Operating
3ANatural Gas Internal Combustion EngineNG8.4 MW2010Operable · As of September 2026 (EIA-860M): (OP) Operating
4ANatural Gas Internal Combustion EngineNG8.4 MW2010Operable · As of September 2026 (EIA-860M): (OP) Operating
5ANatural Gas Internal Combustion EngineNG8.4 MW2010Operable · As of September 2026 (EIA-860M): (OP) Operating
6ANatural Gas Internal Combustion EngineNG8.4 MW2010Operable · As of September 2026 (EIA-860M): (OP) Operating
7ANatural Gas Internal Combustion EngineNG8.4 MW2010Operable · As of September 2026 (EIA-860M): (OP) Operating
8ANatural Gas Internal Combustion EngineNG8.4 MW2010Operable · As of September 2026 (EIA-860M): (OP) Operating
9ANatural Gas Internal Combustion EngineNG8.4 MW2010Operable · As of September 2026 (EIA-860M): (OP) Operating

U.S. Energy Information Administration · Monthly Update to the Annual Electric Generator Report (Form EIA-860M) · data for 2026-09 · as of Oct 23, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0