gridprims

Power plant · EIA plant code 2951

Horseshoe Lake

Operator
Oklahoma Gas & Electric Co
Location
Oklahoma, OK (county level only)
Balancing authority
Southwest Power Pool (SWPP)
Nameplate capacity
564 MW
Summer capacity
467.8 MW

Planned changes reported to EIA: 4 proposed generators.

U.S. Energy Information Administration · Annual Electric Generator Report (Form EIA-860) · data for 2025 · as of Sep 10, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Generation in 2025

Net generation
443,272 MWh
Capacity factor
9.0%

Capacity factor is net generation divided by nameplate capacity times the hours each generator was in service that year, counted by month.

U.S. Energy Information Administration · Power Plant Operations Report (Form EIA-923) · data for 2025 · as of Sep 11, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Emissions

Carbon dioxide in 2023
514,806 metric tons
Carbon dioxide per MWh
1,312 lb/MWh

eGRID reports 567,477 short tons. One short ton is 0.90718474 metric tons.

Emissions are for 2023, the newest eGRID year. Generation is for 2025, the newest EIA-923 year.

U.S. Environmental Protection Agency · Emissions & Generation Resource Integrated Database (eGRID) · data for 2023 · as of Jun 16, 2025 · retrieved Oct 31, 2026 · CC-BY-4.0

Generators

Generators at Horseshoe Lake
GeneratorTechnologyEnergy sourceNameplateOperating sinceStatus
10Natural Gas Fired Combustion TurbineNG60.5 MW2001Operable · As of September 2026 (EIA-860M): (OP) Operating
11Natural Gas Fired Combustion TurbineNG224 MWProposed, planned start 2026 · As of September 2026 (EIA-860M): (TS) Construction complete, but not yet in commercial operation
12Natural Gas Fired Combustion TurbineNG224 MWProposed, planned start 2026 · As of September 2026 (EIA-860M): (TS) Construction complete, but not yet in commercial operation
13Natural Gas Fired Combustion TurbineNG224 MWProposed, planned start 2029 · As of September 2026 (EIA-860M): (T) Regulatory approvals received. Not under construction
14Natural Gas Fired Combustion TurbineNG224 MWProposed, planned start 2029 · As of September 2026 (EIA-860M): (T) Regulatory approvals received. Not under construction
8Natural Gas Steam TurbineNG443 MW1969Operable · As of September 2026 (EIA-860M): (OP) Operating
9Natural Gas Fired Combustion TurbineNG60.5 MW2001Operable · As of September 2026 (EIA-860M): (OP) Operating

U.S. Energy Information Administration · Monthly Update to the Annual Electric Generator Report (Form EIA-860M) · data for 2026-09 · as of Oct 23, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Report a problem

Tell us what looks wrong. The report holds only what you see in the preview below. Nothing is sent until you press Send.

Exactly what will be sent