Power plant · EIA plant code 2727
Marshall (NC)
- Operator
- Duke Energy Carolinas, LLC
- Location
- Catawba, NC (county level only)
- Balancing authority
- Duke Energy Carolinas (DUK)
- Nameplate capacity
- 2,119 MW
- Summer capacity
- 2,058 MW
Planned changes reported to EIA: 4 planned retirements.
U.S. Energy Information Administration · Annual Electric Generator Report (Form EIA-860) · data for 2025 · as of Sep 10, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0 May be out of date. The next release was due by Sep 10, 2027. Last checked for an update: Oct 31, 2026.
Generation in 2025
- Net generation
- 6,943,515 MWh
- Capacity factor
- 37.4%
Capacity factor is net generation divided by nameplate capacity times the hours each generator was in service that year, counted by month.
U.S. Energy Information Administration · Power Plant Operations Report (Form EIA-923) · data for 2025 · as of Sep 11, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0 May be out of date. The next release was due by Sep 11, 2027. Last checked for an update: Oct 31, 2026.
Emissions
- Carbon dioxide in 2023
- 5,123,083 metric tons
- Carbon dioxide per MWh
- 1,637 lb/MWh
eGRID reports 5,647,232 short tons. One short ton is 0.90718474 metric tons.
Emissions are for 2023, the newest eGRID year. Generation is for 2025, the newest EIA-923 year.
U.S. Environmental Protection Agency · Emissions & Generation Resource Integrated Database (eGRID) · data for 2023 · as of Jun 16, 2025 · retrieved Oct 31, 2026 · CC-BY-4.0 May be out of date. The next release was due by Jan 31, 2026. Last checked for an update: Oct 31, 2026.
Generators
| Generator | Technology | Energy source | Nameplate | Operating since | Status |
|---|---|---|---|---|---|
| 1 | Natural Gas Steam Turbine | NG | 348.5 MW | 1965 | Operable · Planned retirement: 2028 (reported to EIA) · As of September 2026 (EIA-860M): (OP) Operating |
| 2 | Conventional Steam Coal | BIT | 348.5 MW | 1966 | Operable · Planned retirement: 2028 (reported to EIA) · As of September 2026 (EIA-860M): (OP) Operating |
| 3 | Natural Gas Steam Turbine | NG | 711 MW | 1969 | Operable · Planned retirement: 2033 (reported to EIA) · As of September 2026 (EIA-860M): (OP) Operating |
| 4 | Conventional Steam Coal | BIT | 711 MW | 1970 | Operable · Planned retirement: 2033 (reported to EIA) · As of September 2026 (EIA-860M): (OP) Operating |
U.S. Energy Information Administration · Monthly Update to the Annual Electric Generator Report (Form EIA-860M) · data for 2026-09 · as of Oct 23, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0 May be out of date. The next release was due by Nov 23, 2026. Last checked for an update: Oct 31, 2026.