gridprims

Power plant · EIA plant code 2444

Rio Grande

Operator
El Paso Electric Co
Location
Dona Ana, NM (county level only)
Balancing authority
El Paso Electric Company (EPE)
Nameplate capacity
348.3 MW
Summer capacity
265 MW

Planned changes reported to EIA: 2 planned retirements.

U.S. Energy Information Administration · Annual Electric Generator Report (Form EIA-860) · data for 2025 · as of Sep 10, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Generation in 2025

Net generation
789,889 MWh
Capacity factor
23.4%

Capacity factor is net generation divided by nameplate capacity times the hours each generator was in service that year, counted by month.

U.S. Energy Information Administration · Power Plant Operations Report (Form EIA-923) · data for 2025 · as of Sep 11, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Emissions

Carbon dioxide in 2023
532,318 metric tons
Carbon dioxide per MWh
1,311 lb/MWh

eGRID reports 586,780 short tons. One short ton is 0.90718474 metric tons.

Emissions are for 2023, the newest eGRID year. Generation is for 2025, the newest EIA-923 year.

U.S. Environmental Protection Agency · Emissions & Generation Resource Integrated Database (eGRID) · data for 2023 · as of Jun 16, 2025 · retrieved Oct 31, 2026 · CC-BY-4.0

Generators

Generators at Rio Grande
GeneratorTechnologyEnergy sourceNameplateOperating sinceStatus
6Natural Gas Steam TurbineNG50 MW1957Retired in 2025 · As of September 2026 (EIA-860M): retired
7Natural Gas Steam TurbineNG50 MW1958Operable · Planned retirement: 2027 (reported to EIA) · As of September 2026 (EIA-860M): (OP) Operating
8Natural Gas Steam TurbineNG166.5 MW1972Operable · Planned retirement: 2033 (reported to EIA) · As of September 2026 (EIA-860M): (OP) Operating
9Natural Gas Fired Combustion TurbineNG131.8 MW2013Operable · As of September 2026 (EIA-860M): (OP) Operating

U.S. Energy Information Administration · Monthly Update to the Annual Electric Generator Report (Form EIA-860M) · data for 2026-09 · as of Oct 23, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Report a problem

Tell us what looks wrong. The report holds only what you see in the preview below. Nothing is sent until you press Send.

Exactly what will be sent