gridprims

Power plant · EIA plant code 2024

Worthington

Operator
City of Worthington - (MN)
Location
Nobles, MN (county level only)
Balancing authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Nameplate capacity
19.6 MW
Summer capacity
19.6 MW

U.S. Energy Information Administration · Annual Electric Generator Report (Form EIA-860) · data for 2025 · as of Sep 10, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Generation in 2025

Net generation
6,419 MWh
Capacity factor
3.7%

Capacity factor is net generation divided by nameplate capacity times the hours each generator was in service that year, counted by month.

U.S. Energy Information Administration · Power Plant Operations Report (Form EIA-923) · data for 2025 · as of Sep 11, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Emissions

Carbon dioxide in 2023
34 metric tons
Carbon dioxide per MWh
8 lb/MWh

eGRID reports 37 short tons. One short ton is 0.90718474 metric tons.

Emissions are for 2023, the newest eGRID year. Generation is for 2025, the newest EIA-923 year.

U.S. Environmental Protection Agency · Emissions & Generation Resource Integrated Database (eGRID) · data for 2023 · as of Jun 16, 2025 · retrieved Oct 31, 2026 · CC-BY-4.0

Generators

Generators at Worthington
GeneratorTechnologyEnergy sourceNameplateOperating sinceStatus
1Petroleum LiquidsDFO2 MW2002Operable · As of September 2026 (EIA-860M): (OP) Operating
10Onshore Wind TurbineWND0.9 MW2002Operable · As of September 2026 (EIA-860M): (OP) Operating
11Onshore Wind TurbineWND0.9 MW2002Operable · As of September 2026 (EIA-860M): (OP) Operating
12Onshore Wind TurbineWND1 MW2003Operable · As of September 2026 (EIA-860M): (OP) Operating
13Onshore Wind TurbineWND1 MW2003Operable · As of September 2026 (EIA-860M): (OP) Operating
2Petroleum LiquidsDFO2 MW2002Operable · As of September 2026 (EIA-860M): (OP) Operating
3Petroleum LiquidsDFO2 MW2002Operable · As of September 2026 (EIA-860M): (OP) Operating
4Petroleum LiquidsDFO2 MW2002Operable · As of September 2026 (EIA-860M): (OP) Operating
5Petroleum LiquidsDFO2 MW2002Operable · As of September 2026 (EIA-860M): (OP) Operating
6Petroleum LiquidsDFO2 MW2002Operable · As of September 2026 (EIA-860M): (OP) Operating
7Petroleum LiquidsDFO2 MW2002Operable · As of September 2026 (EIA-860M): (OP) Operating
8Onshore Wind TurbineWND0.9 MW2002Operable · As of September 2026 (EIA-860M): (OP) Operating
9Onshore Wind TurbineWND0.9 MW2002Operable · As of September 2026 (EIA-860M): (OP) Operating

U.S. Energy Information Administration · Monthly Update to the Annual Electric Generator Report (Form EIA-860M) · data for 2026-09 · as of Oct 23, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Report a problem

Tell us what looks wrong. The report holds only what you see in the preview below. Nothing is sent until you press Send.

Exactly what will be sent