gridprims

Power plant · EIA plant code 1239

Riverton

Operator
Empire District Electric Co
Location
Cherokee, KS (county level only)
Balancing authority
Southwest Power Pool (SWPP)
Nameplate capacity
300.2 MW
Summer capacity
279.2 MW

Planned changes reported to EIA: 2 planned retirements and 2 proposed generators.

U.S. Energy Information Administration · Annual Electric Generator Report (Form EIA-860) · data for 2025 · as of Sep 10, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Generation in 2025

Net generation
1,336,903 MWh
Capacity factor
50.8%

Capacity factor is net generation divided by nameplate capacity times the hours each generator was in service that year, counted by month.

U.S. Energy Information Administration · Power Plant Operations Report (Form EIA-923) · data for 2025 · as of Sep 11, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Emissions

Carbon dioxide in 2023
467,417 metric tons
Carbon dioxide per MWh
898 lb/MWh

eGRID reports 515,239 short tons. One short ton is 0.90718474 metric tons.

Emissions are for 2023, the newest eGRID year. Generation is for 2025, the newest EIA-923 year.

U.S. Environmental Protection Agency · Emissions & Generation Resource Integrated Database (eGRID) · data for 2023 · as of Jun 16, 2025 · retrieved Oct 31, 2026 · CC-BY-4.0

Generators

Generators at Riverton
GeneratorTechnologyEnergy sourceNameplateOperating sinceStatus
10Petroleum LiquidsDFO16.3 MW1988Operable · Planned retirement: 2026 (reported to EIA) · As of September 2026 (EIA-860M): retired
11Petroleum LiquidsDFO16.3 MW1988Operable · Planned retirement: 2026 (reported to EIA) · As of September 2026 (EIA-860M): retired
12Natural Gas Fired Combined CycleNG148.8 MW2007Operable · As of September 2026 (EIA-860M): (OP) Operating
12-2Natural Gas Fired Combined CycleNG118.8 MW2016Operable · As of September 2026 (EIA-860M): (OP) Operating
13Natural Gas Fired Combustion TurbineNG13.6 MWProposed, planned start 2026 · As of September 2026 (EIA-860M): (TS) Construction complete, but not yet in commercial operation
14Natural Gas Fired Combustion TurbineNG13.6 MWProposed, planned start 2026 · As of September 2026 (EIA-860M): (TS) Construction complete, but not yet in commercial operation

U.S. Energy Information Administration · Monthly Update to the Annual Electric Generator Report (Form EIA-860M) · data for 2026-09 · as of Oct 23, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0